Advises That Util 870723 Changes to Initial Test Program Described in Chapter 14 of FSAR Acceptable,Per Discussion Provided
ML20154A549
Person / Time
Site: Clinton Constellation icon.png
Issue date: 09/06/1988
From: Stevens J
Office of Nuclear Reactor Regulation
To: Holtzscher D
ILLINOIS POWER CO.
References
TAC-65853, NUDOCS 8809130009
Download: ML20154A549 (5)


Text

.- ._ _ _ _ _ _ _ _

5

' # "U%o UNITED STATES 8

p5 o

E NUCLEAR REGULATORY COMMfSSION WASHINGTON, D. C. 20555 l

%,..... September 6,1988 Docket No.: 50-461 Mr. Dale L. Holtzscher Acting Manager - Lir.ensing and Safety Clinton Power Station Mail Code V920 Clinton, Illinois 61727

Dear P . Holtzscher:

SUBJECT:

SAFETY EVALVATION CONCERNING CHANGES TO CLIhTON INITIAL TEST PROGRAM (TAC NO. 65853)

RE: CLINTON POWER STATION, UNIT NO. 1 By letter dated N1y 23, 1987 the licensees reported changes to their Initial Test Program described in Chapter 14 of the Clinton Power Station Final Safety Analyses Report. The staff has reviewed the changes described in Attachtnent 1 to the licensees' letter and finds them acceptable as discussed below:

1. Change 1 is acceptable as stated.
2. Change 2 deletes the testing of the Maste" Automatic Control Mcde (Automatic Load Following) for the Recirculation Flow Control System from certain sections of the FSAR, but dues not explain how this mode of operation will be inhibited. By telecon on August 23, 1988, the licensees stated that the control circuitry for the Master Automatic control mode of operation is not connected on the control panel and therefore the operators cannot inadvertently switch to that mode of operation. The staff finds this acceptable.
3. Change 3, which reference: the FSAR Section that describes the loss of turbine generator and offsite power tests, deletes the acceptance criteria for requiring control rod position informatinn from the FSAR, to agree with actual plant design. The licensees did not identify alternate means of providing control rod position information since, by G.E. specification, the control rod position infonnation system was required to be powered from a vital bus. By telecon on August 23, 1988, the licensees stated that control rod position infonnation was provided by three alternate means, all powered by uninterruptible power supplies :nd diesel generators. The

$$[ 3000 O gy P

Sgk

\

O

2 licensees further stated that these were reviewed by the NRC staff as part of the R.G. 1.97 Rev. 3 review, which was approved in Section 7.5 of the Clinton Safety Evaluation Report, Supplement 5 (NUREG-0853) dated January 1986.

For further infomation or clarification, please contact me at (301) 492-1397.

i t

p m d. A Janice A. Stevens, Project Manger Project Directorate III-2 Division of Reactor Projects - III, IV, Y and Special Projects cc: See next oage  !

1 e

I i s

i i

i f i

)

l

Mr. Frank A. Spangenberg Clinton Power Station

. Illinois Power Company Unit 1 cc:

Mr. L. Larson Mr. D. P. Hall Project Manager Vice Presidant General Electric Ceepany Clinton Power Station 175 Curtner Avenue, N/C 395 P. O. Box 678 San Jose, California 9S125 Clinton, Illinois, 61727 Regional Administrator, Region III Mr. R. D. Freeman 799 Roosevelt Road, Bldg. f4 Manager-Muclear Station Engineering Dept. Glen Ellyn, Illinois 60137 Clinton Power Station P. 0. Box 678 Chairman of Dewitt County Citnton, Illinois 61727 c/o County Clerk's Office DeWitt County Courthouse Sheldon Zabel, Esquire C1tnton, Illinois 61727 Schiff. Hardin & Waite 7200 Sears Tower Illinois Department 233 Wacker Drive of Nuclear Safety Chicago, Illinois 60606 Division of Engineering 1035 Outer Park Drive 5th Floor Resident Inspector Springfie'.d. Illinois 62704 U. S. Nuclear Regulatory Commission RR 3. Box 229 A Mr. Donald Schopfer ,

Clinton, Illinois 61727 Project Manager Sargaat & Lundy Engineers 55 East Monroe Street Chicago, Illinois 60603 i

l 1

I l

/ .

September 6,1988 l

t licensees further stated that these were reviewed by the NRC staff as part of the R.G.1.97 Rev. 3 review, which was approved in Section 7.5 of the Clinton Safety Evaluation Report, Supplement 5 (NVREG-0853) dated January 1986.

For further information or clarification, please contact me at (301) 492-1397.

i Janice A. Stevens, Project Manger

Project Directorate III-2

1 Division of Reactor Projects - III, j IV, Y and Special Projects

! cc: See next page I

DISTRIBUTION /

Dockec file # EJordan i NRC & Local PDRs PDI!!-2 Plant file PDIII-2 r/f ACRS(10)

MVir9111o OGC GHolahan BMarcus LLuther BGrimes JStevens

, i i I I

)

I *See previous concurrencee ,

1

. t

! *PDIII-2 *PDIII-2 *PDIII-2

JStevens:km LLuther DMuller i 9/4/88 9//,/88 9/6/88  ;

i 0

l bpl l 1 0 l t I

(

i c I

September 6, 1988 licensees further stated that these were reviewed by t e NRC staff as part of the R.G. 1.97 Rev. 3 review, which was approved in Se tion 7.5 of the Clinton Safety Evaluation Report, Supplement 5 (NUREG-0853) ated January 1986.

For further information or clarification, please conta meat (301)492-1397.

Janice Stevens, Project Manger Projec Directorate III-2 Divisi n of Reactcr Projects - III, IV, Y and Special Projects