Forwards Safety Insp Rept 50-461/89-21 on 890601-23 & Notice of Violation.Insp Conducted in Response to 890601 Event Involving Loss of Reactor Recirculating Pump B Seals Which Resulted in RCS Leakage in Excess of 50 Gpm
ML20247N276
Person / Time
Site: Clinton Constellation icon.png
Issue date: 07/24/1989
From: Greenman E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hall D
ILLINOIS POWER CO.
Shared Package
ML20247N282 List:
References
NUDOCS 8908020348
Download: ML20247N276 (2)


See also: IR 05000461/1989021

Text

_

-

.

P MCug

UNITED STATES

i

NUCLEAR REGULATORY COMMISSION

, .

e

h

it" (

?>

REGION lli

(

$

f

799 ROOSEVELT ROAD

g

GLEN ELLYN. ILUNOIS 60137

JUL 2 41989

Docket No. 50-461

Illinois Power Company

ATTN: Mr. D. P. Hall

Senior Vice President

Clinton Power Station-

Mail Code V-275.

P. O. Box 678

Clinton, IL 61727

Gentlemen:

-

'

This refers to the special safety inspection conducted by Messrs. P. Hiland,

,

S. Ray, J. Jacobson, H. Walker, and P. Brochman of this office and W. Luckas

of Brookhaven National Laboratory on June 1 through 23, 1989, at Clinton Power

Station authorized by Facility Operating License No. NPF-62 and to the

discussion of our findings with Mr. S. Perry at the conclusion of the

inspection.

The inspection was conducted in response to an event that occurred on June 1,

1989, where, with the plant operating at about 40% power, an ALERT was

declared due to a loss of the "B" reactor recirculating pump seals which

resulted in reactor coolant system leakage in excess of 50 gallons per minute.

In addition to the recirculating pump seal failure, the plant experienced a

-

loss. of the "A" drywell chiller early in the event and a failure of the motor

driven feedwater pump regulating valve during the subsequent plant shutdown.

The enclosed copy of our inspection report identifies the areas examined

during the inspection.

These included a review of operational data during the

event, direct observation of licensee performance during the event and

subsequent recovery actions, direct observation of affected plant equipment,

and your root cause determination.

During this inspection certain of your activities appeared to be in violation

of NRC requirements as described in the enclosed Notice. A written response

is required. While this violation had minimal impact upon the Safety of the

plant our overall evaluation of this violation and NRC observations of the

reactor startup subsequent to the recirculation pump seal failure leads to a

. e are concerned that an apparent problem exists in the

W

concern.

effectiveness of management as it relates to communications with plant staff

ensuring implementation of commitments. This is particularly disconcerting in

that specific commitments were made to NRC during an onsite meeting of June 16,

1989 yet they were not effectively implemented.

In your response please give .

this matter your particular attention.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC Public Document Room.

r

8908020348 890724

,

PDR

ADOCK 05000461

0

PDC

1

1

_ _ - -

1

_

-.

_

-

- _ _ _

_

. - _ .

_-

. - _ -

U

,

- .;

. ,-

..

~

[Illino1sPower' Company

2

JUL 2 41999

>

,

The response' directed by this. letter and the accompanying Notice are not

~

, subject to the clearance procedures of the'0ffice of Management and Budget as

M

required by the Paperwork' Reduction Act of 1980, PL 96-511.

'

' We'will gladly discussLany questions you have concerning this inspection.

-

m

. Sincerely.

(DE L,

y Edward G. Greenman, Dire

r

u. Division of Reactor Projects

Enclosures:

.

1.. Nctice of Violation

'2.,

Inspection Report-

'No.150-461/89021(DRP)

cc w/ enclosures:

.J.:.S. Perry, Assistant'

Vice: President

R.JD.'FreemansManager,

Nuclear' Station

-Engineering Department

5BCD/SC87(AIDSka

'

Licensing Fee Management Branch

Resident. Inspector, RIII

Richard Hubbard

J. W.'McCaffrey, Chief, Public

Utilities Division.

H..S. Tay1_or, Quality Assurance

Division,ESargent &.Lundy

Engineers

' David'Rosenblatt, Governor's

'

0ffice of Consumer Services

Sheldon Zabel, Esquire,

Schiff, Hardin, &-Watte

L. Larson, Project Manager,

General Electric Company

. Chairman of DeWitt County

Illinois Department of

Nuclear Safety

'D.;Schopfer, Project Manager,

Sargent.& Lundy Engineers

.

,

r_____-____--_.

_ _ _ .

__

_