ML20202H685

From kanterella
Jump to navigation Jump to search

Forwards Request for Addl Info Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves
ML20202H685
Person / Time
Site: Clinton Constellation icon.png
Issue date: 01/26/1999
From: Hopkins J
NRC (Affiliation Not Assigned)
To: Sipek J
ILLINOIS POWER CO.
References
GL-96-05, GL-96-5, TAC-M97032, NUDOCS 9902080192
Download: ML20202H685 (4)


Text

I *

?~ L

. Mr. Joseph V. Sipek Dirsctor- Licensing January 26, 1999' Clinton Pow:r Station P.O. Box 678 -

Mail Code V920

>. Clinton, IL' 61727

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION RELATED TO THE GL 96-05 )

PROGRAM FOR THE CLINTON POWER STATION, UNIT 1 (TAC NO. M97032)

Dear Mr. Sipek:

l The NRC staff issued Generic Letter (GL) 96-05, " Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves," by letter dated September 18,1996. The

, GL requested licensees to have a program to vcv/ on a periodic basis that safety-related motor-operated valver. .y 3Vs) continue to be vcpable of performing their safety functions within the current licensing basis of the facility.

On July 14,1998, you submitted an updated response to GL 96-05 indicating your intent to implement the provisions of the Joint Owners Group (JOG) Program on MOV Periodic o . Verification. The NRC staff has encouraged licensees to participate in the i.1dustry-wide JOG program to provide a benefit in reactor safety by sharing expertise and information on MOV performance and to increase the efficiency of GL 96-05 activities at nuclear plants. Licensee participation in the JOG program also minimizes the amount of information necessary for the

, staff to review, when reviewing each licensee's response to GL 96-05. As a result, the NRC staff requires only limited information to complete its GL 96-05 review for the Clinton Power Station.

Attached is a request for additionalinformation (RAl) regarding the GL 96-05 program at Clinton f Please provide the requested information within 60 days of your receipt of this letter, i Contact me if you have any questions.

Sincerely-Original signed by:

Ok

' Jon B. Hopkins, Senior Project Manager  ;

Project Directorate Ill-3 )

Division of Reactor Projects lil/IV i Office of Nuclear Reactor Regulation I

Docket No. 50-461 Distribution:

Docket File PUBLIC

Enclosure:

RAI PD3-3 R/F ACRS TScarbrough OGC EGA1 GGrant, Rlli cc w/ encl: See next page DTerao JZwolinski 9902080192 990126 PDR ADOCK 05000461 P PDR Document Name: G:\PD3-3\CONTON\RAl-9605.WPD OFFICE PM:PDIII-2 g/l E LA:PDIII-2 E PD:PDIII-2 [E l NAME JHopkins f EBarnhilify SRichards 44V DATE l /M/99 /d l / % /99 l / % /99 OFFICIAL RECORD COPY C10033' NPS HIES M BCOPy

q . , t.

o ug

[p n **o

  • 4 UNITE"., STATEG g

j NUCLEAR REGULATORY COMMISSION WAMilNGToN, D.o. 20066 4 c1

%...../g l Mr. Joseph V. Sipek l

Director- Licensing  ;

Clinton Power Station i P.O. Box 678 Mall Code V920 Clinton,IL 61727 l

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION RELATED TO THE GL 96-05 PROGRAM FOR THE CLINTON POWER STATION, UNIT 1 (TAC NO. M97032)

Dear Mr. Sipek:

The NRC staff issued Generic Letter (GL) 96-05, " Periodic Verification of Design-Basia Capability of Safety-F alated Motor-Operated Valves," by letter dated September 18,1996. The GL requested licensees to have a program to verify on a periodic basis that safety-related motor-operated valves (MOVs) continue to be capable of performing their safety functions within the current licensing basis of the facility.

On July 14,1998, you submitted an updated response to GL 96-05 indicating your intent to implement the provisions of the Joint Owners Group (JOG) Program on MOV Periodic Verification. The NRC staff has encouraged licensees to participate in the industry-wide JOG program to provide a benefit in reactor safety by sharing expertise and information on MOV performance and to increase the efficiency of GL 96-05 activities at nuclear plants. Licensee participation in the JOG program also minimizes the amount of information necessary for the staff to review, when reviewing each licensee's response to GL 96-05. As a result, the NRC staff requires only limited information to complete its GL 96-05 review for the Clinton Power Station.

Enclosed is a request for additional information (RAI) regarding the GL 96-05 program at Clinton. Please provide the requested information within 60 days of your receipt of this letter.

Contact me if you have any questions.

Sincerely, .

s Jon B. Hopkins, Sen' r Project Manager Project Directorate lil-2 Division of Reactor Projects lil/IV Office of Nuclear Reactor Regulation Docket No. 50-461

Enclosure:

RAI cc w/ encl: See next page

REQUEST FOR ADDITIONAL INFORMATION FOR RESOLUTION OF GL 96-05 ISSUES AT THE CLINTON POWER STATION (TAC NO. M97032)

1. In NRC Inspection R< sport No. 50-461/96002, the NRC staff closed its review of the motor-operated valve (MOV) program implemented at Clinton Powar Station (Clinton) in response to Generic Letter (GL) 89-10, " Safety-Related Motor-Operated Valve Testing and Surveillance.' In the inspection report, the NRC staff discussed certain aspects of Illinois Power's (IP) MOV program to be addressed over the long term. For example, the inspectors noted that (1) 14 MOVs with interim operability justifications were to have margin improvements implemented by the Fall 1996 refueling outage; (2) IP agreed to review test data acquired by its periodic verification and reevaluate its use of closing stem friction coefficients when evaluating open direction thrust margins; (3) IP agreed to programmatically account for load sensitive behavior in the open direction; and (4) testing of 14 butterfly valves were scheduled for the next three refueling outages.

Describe the actions taken to address the specific long-term aspects of the MOV program at Clinton noted in the NRC inspection report.

2. In a letter dated July 14,1998, IP updated its commitment to implement the Joint Owners Group (JOG) Program on MOV Periodic Verification in response to GL 96-05. The JOG program specifies that the methodology and discrimination criteria for ranking MOVs according to their safety significance are the responsibility of each participating licensee.

In a previous letter dated March 14,1997, IP had generally described the risk ranking of MOVs at Clinton for application of the interim MOV static diagnostic test program. As Clinton is a boiling water reactor (BWR) nuclear plant, does IP apply the Boiling Water Reactor Owners' Group (BWROG) methodology for ranking MOVs based on their safety significance as described in BWROG Topical Report NEDC 32264 and the NRC safety evaluation dated February 27,19967 If not, describe the methodologies used for risk ranking MOVs at Clinton in more detail, including the preparation of sample lists of high-risk MOVs from other BWR plants and the use of expert panel review of the MOVs considered to be non-safety significant by the Clinton probabilistic risk assessment.

3. The JOG program focuses on the potential age-related increase in the thrust or torque required to operate valves under their design-basis conditions. In the NRC safety evaluation dated October 30,1997, on the JOG program, the NRC staff specified that licensees are responsible for addressing the thrust or torque delivered by the MOV motor actuator and its potential degradation. Describe the plan at Clinton for ensuring adequate ac and de MOV motor actuator output capability, including consideration of recent guidance in Limitorque Technical Update 98-01 and its Supplement 1.

Enclosure

l 3

Joseph V. Sipek Clinton Power Station, Unit 1 .

Illinois Power Company i

e cc:

John. P. McElwain Illinois Department of Nuclear Safety SeniorVice President Office of Nuclear Facility Safety Clinton Power Station ATTN: Mr. Frank Nizidlek P.O. Box 678 1035 Outer Park Drive Clinton,IL 61727 Springfield,IL E2704 Wayne Romberg Leah Manning Stetzner Manager Nuclear Station VP, General Counsel & Corp. Secretary Engineering Department 500 South 27th Street Clinton Pcwer Station Decatur,IL 62525 P.O. Box 678 -

Clinton,IL 61727 ,

Resident inspector U.S. Nuclear Regulatory Commission RR#3, Box 229 A Clinton,IL 61727 R. T. Hill Licensing Services Manager General Electric Company 175 Curtner Avenue, M/C 481 San Jose, CA 95125 Regional Administrator, Pegion lll U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Chairman of DeWdt County c/o County Clerk's Office DeWitt County Courthouse Clinton,IL 61727 J. W. Blattner Project Manager Sargent & Lundy Engineers 55 East Monroe Street Chicago,IL 60603 l