ML20246D269

From kanterella
Jump to navigation Jump to search
Forwards Safeguards Insp Rept 50-461/89-25 on 890717-0802 & Notice of Violation.Notice of Violation Withheld (Ref 10CFR73.21(c)(2))
ML20246D269
Person / Time
Site: Clinton Constellation icon.png
Issue date: 08/18/1989
From: Greger L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hall D
ILLINOIS POWER CO.
Shared Package
ML20246D272 List:
References
NUDOCS 8908250308
Download: ML20246D269 (3)


See also: IR 05000461/1989025

Text

{{#Wiki_filter:_ m . WWWhM&W j

- . . ,

AUG 181989 i ! i Docket No. 50-461 l.i Illinois Power Company l ATTN: Mr. D. P. Hall l Senior Vice President Clinton Power Station i Mail Code V-275 l P. O. Box 678 Clinton, IL 61727 ! ! Gentlemen: , ! This refers to the routine safeguards inspection and allegation review inspection j conducted by Mr. G. L. Pirtle of this office between July 17 and August 2, ! 1989, of activities at the Clinton Power Station authorized by NRC Operating ' License No. NPF-62 and to the discussion of our findings with Mr. J. G. Cook and other members of your staff at the conclusinn of the onsite inspection. t The enclosed copy of our inspection report identifies areas examined during l the inspection. Within these areas, the inspection consisted of a selective l examination of procedures and representative records, observations, and l interviews with personnel. During this inspection, certain of your activities appeared to be in violation of NRC requirements, as specified in the enclosed Notice. A written response j is required. j Some areas examined during this inspection concern a subject matter which ) is exempt from disclosure according +o Part 73, Title 10, Code of Federal l Regulations, Section 73.21(c)(2). This information must be handled and ! protected in accordance with the provisions of 10 CFR 73.21. Consequently, i the Report Details of this inspection and the Notice of Violation will not ! be placed in the NRC Public Document Room. l In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the attachment to the Report Details will be placed in the NRC Public Document Room. l The responses directed by this letter and the accompanying Notice are not l subject to the clearance procedures of the Office of Management and Budget

as required by the Paperwork Reduction Act of 1980, PL 96-511. l i f l . Enclosure Contatas SAFECU/c 5 IK10RU TION Pnrroevnnnn r t i ra n t n A v i n r31 Jho7Separctio,yhje l Viin LV W is s uu ei 6 vautuiaiv6t l' age Is Decontrolled 8908250308 890816 [ hh \\ ' PDR ADOCK 03000461 W __ -

- - - - _ _ _ _ - - _ - - - , , O A r* A f A 3 30 [h[[ A 3 y A T ' A i - oni ,"u Jn s su ,- , . i .t v, n l V.T , _ , , _ . Illinois Power Company 2 g.dG 181989 We will gladly discuss any questions you.have concerning this inspection. Sincerely, }l)J &#A4- L. Robert Greger, Chief Reactor Programs Branch Enclosures: 11. Notice of Violation (UNCLASSIFIED SAFEGUARDS .INFORMATION) 2. Inspection Report No. 50-461/89025(DRSS) (UNCLASSIFIED SAFEGUARDS INFORMATION) 3. Attachment: Allegation Review cc w/ enclosures: J. S. Perry,-Assistant Vice President R. D. Freeman, Manager, Nuclear Station Engineering Cepartment NRR/DRIS/SGB NRR/DRIS/ SIB NRR/DLPQ/PEB cc w/ enclosures, w/o UNCLASSIFIED SAFEGUARDS INFORMATION: DCD/DCB (RIDS) Licensing Fee Management Branch Resident Inspector, RIII Richard Hubbard. J. W. McCaffrey, Chief, Public Utilities Division H. S. Taylor, Quality Assurance , Division, Sargent & Lundy Engineers David Rosenblatt, Governor's Office of Consumer Services Sheldon Zabel, Esquire, Enclosure contains Schiff. Hardin, & Waite SA/EOUARDS INFORMATION L. Larson, Project Manager, Upon separation This General Electric Company Poco Is decontrolled n a r m , a nnn intr nnna AT-(W ~VA LUUninuv sasi vau u,5i ,v a t _-____ _ ____.

. _ _ _ _ - _ - , DJ:0 JAG 5 is :OiV A" 0 3 . . .- . Illinois Power Company . g g y g 3939 3 cc w/ enclosures, w/o UNCLASSIFIED SAFEGUARDS INFORMATION: Chairman of DeWitt'Coui.ty Illinois Department of Nuclear Safety -D..Schopfer, Project Manager, Sargent & Lundy Engineers cc: C. Weil, RIII , ! Enclosure Contains SAFEGUARDS 11&ORMATION i Upan Separation This .go Is Decontrolled O RI I , ' P le/ib hd a .. a _ . . - co maunuvo nu v,e. 2. __ . _ _ . . _ _ . . . _ _ . _ _ . .

}}