l
-
t
'
UNITED STATES
># "%,}o,,
NUCLEAR REGULATORY COMMISSION
2
REGloN lli
)
V)3 E
801 WARRENVILLE ROAD
o
5*
e
LISLE. ILLINols 60532 4351
j
,
/
. *****
April 21, 1999
EA 99-078
Mr. John P. McElwain
Chief Nuclear Officer
Clinton Power Station
l
Illinois Power Company
Mail Code V-275
P. O. Box 678
Clinton,IL 61727
SUBJECT:
CLINTON INSPECTION REPORT 50-461/99006(DRP)
Dear Mr. McElwain:
On April 7,1999, the NRC completed an inspection at the Clinton Power Station. The
enclosed report presents the results of that inspection.
During the period covered by this inspection, the inspectors completed approximately 60 hours6.944444e-4 days <br />0.0167 hours <br />9.920635e-5 weeks <br />2.283e-5 months <br />
of continuous observations in the main control room. The inspectors determined that
corrective actions to resolve previously identified issues regarding Technical Specification and
procedure usage, the completion of shift and relief turnovers, and the use of peer checks had
improved. However, deficiencies were also identified regarding the professional atmosphere
of the main control room. These deficiencies contributed to your decision to implement a
site-wide stand down. The actions taken subsequent to the inspectors' continuous control
room observations have initially been effective in improving the conduct of routine plant
operations. The inspectors will continue to monitor plant operations to ensure that these
j
improvements are sustained.
Based on the results of this inspection, the NRC has determined that four violations of NRC
requirements occurred. These violations are being treated as Non-Cited Violations (NCVs),
'
consistent with Appendix C of the Enforcement Policy These NCVs are described in the
subject inspection report. If you contest the violations or the severity level of these NCVs, you
should provide a response within 30 days of the date of this inspection report, with the basis
for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk,
Washington DC 20555-0001, with copies to the Regional Administrator, Region Ill, and the
Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington
DC 20555-0001.
9904260321 990421
ADOCK 05000461
G
r
'
,.
-
,.
1
i
J. McElwain
-2-
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, the
enclosure, and your response, if you choose to provide one, will be placed in the NRC Public
Document Room.
Sincerely,
Original signed by
Marc L. Dapas, Deputy Director
Division of Reactor Projects
A
Docket No. 50-461
[')
License No. NPF-62
'
Enclosure: Inspection Report 50-461/99006(DRP)
cc w/ encl:
G. Hunger, Station Manager
R. Phares, Manager, Nuclear Safety
i
'
and Performance improvement
J. Sipek, Director - Licensing
M. Aguilar, Assistant Attorney General
G. Stramback, Regulatory Licensing
Services Project Manager
General Electric Company
Chairman, DeWitt County Board
State Liaison Officer
Chairman, Illinois Commerce Commission
DOCUMENT NAME: G:\\ CLIN \\CLl99006.DRP
To receive . copy or ini. ooeum.nt, indic.t. in in. dox c copy without attaenienci e Copy with attaen/enci
N*
No copy
f
OFFICE
Rlli
h/
Rlli
Rill
-
NAME
TKozak:gs/colmfh'BClayton %h ,
MDapas
DATE
04 &l/99
04/0/99 (si
h
04 9//99
OFFICIAL RECORD COPY
L
v
.-
,
i
.,
.-
,
' J. McElwain
-2-
Distribution:
RPC (E-Mail)
J. Lieberman, OE w/enci
J. Goldberg, OGC w/enci
B. Boger, NRR w/enci
' Project Mgr., NRR wienci
J. Caldwell, Rlli w/encI
B. Clayton, Rlli w/encI
SRI Clinton w/enci
DRP w/enci
DRS w/enci
. Rill PRR w/enel
- PUBLIC IE-01 w/enci ,
Docket File w/enct
GREENS
LEO (E-Mail)
DOCDESK (E-Mail)
/I,
2c,cie33
l
-
--
-
__