Forwards Insp Rept 50-461/99-13 on 990611-0728.Two Violations Noted & Being Treated as Ncvs.Violation Re Three Examples Where Licensee Procedural Requirements for Minor Maint Work Were Not Followed
ML20211A893
Person / Time
Site: Clinton Constellation icon.png
Issue date: 08/19/1999
From: Dapas M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Mcelwain J
ILLINOIS POWER CO.
Shared Package
ML20211A899 List:
References
50-461-99-13, NUDOCS 9908240163
Download: ML20211A893 (2)


See also: IR 05000461/1999013

Text

C

..

y nahS UNITED STATES

NUCLEAR RE1ULATORY COMMISSION

,

o,*

l ~ ]f REGION ill

(.,g* h 801 WARRENVILLE ROAD

.

l  % *A*.* l August 19,1999

,

Mr. John P. McElwain

Chief Nuclear Officer,

Clinton Power Station

lilinois Power Company .

'

- Mail Code V-275

P. O. Box 678

Clinton,IL 61727

l

l ' SUBJECT: CLINTON INSPECTION REPORT 50-461/99013(DRP)

Dear Mr. McElwain:

On July 28,1999, the NRC completed an inspection at the Clinton Power Station. The

enclosed report presents the results of that inspection.

Engineering support to operations improved as the technical issues that arose during the

inspection period were resolved in a timely manner. However, the inspectors identified some

problems with the implementation of online risk procedures. The inspectors identified one

instance where online risk procedures were not followed. Specifically, with the reactor core

isolation cooling (RCIC) system inoperable, procedurally required postings were not placed in

l appropriate areas within the plant identifying that work was not allowed on equipment

associated with the_ high pressure core spray (HPCS) system. The inspectors identified that a

,

_ technician was in the process of collecting samples from the Division i emergency diesel

. generator (EDG) expansion tank and planned to subsequently collect a sample from the

Division ill EDG expansion tank, which supplies emergency power to the HPCS system. On

another occasion, the inspectors identified that recommendations of your probabilistic safety

analysis group to reduce overall plant risk by modifying a standby liquid control system

surveillance test were not implemented in a timely manner.

Based on the results of this inspection, the NRC has determined that two violations of NRC

requirements occurred. The first violation involved the previously mentioned issue conceming

the failure to post plant areas containing equipment associated with the HPCS system while the

RCIC system was inoperable. The second violation involved three examples where your

procedural requirements for minor maintenance work were not followed. These violations are

being treated as Non-Cited Violations (NCVs), consistent with Appendix C of the Enforcement

Policy. These NCVs are described in the subject inspection report, if you contest the violations

or the seventy level of these NCVs, you should provide a response within 30 days of the date of

this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission,

' ATTN: Document Control Desk, Washington, DC 20555-0001, with copies to the Regional

Administrator, Region lil, and the Director, Office of Enforcement, United States Nuclear

Regulatory Commission, Washington, DC 20555-0001.

) l

i

I

"

9908240163.990819

DR ADOCK O 4ji I

>

V. ,

4

. . .4.

J. McElwain ,

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, the

enclosure, and your response, if you choose to provide one, will be placed in the NRC Public

'

Document Room.

Sincerely,

'/s/ M. L. Dapas

Marc L. Dapes, Deputy Director -

Division of Reactor Projects

.

Docket No. 50-461

License No. NPF-62

Enclosure: Inspection Report 50461/99013(DRP)

cc w/ encl:' P. Hinnenkamp, Plant Manager

'

R. Phares, Manager, Nuclear Safety

and Performance improvement-

J.- Sipek, Director- Licensing

M.'Aguilar, Assistant Attomey General

G. Stramback, Regulatory Licensing

Services Project Manager'

General Electric Company

Chairman, DeWitt County Board

State Liaison Oficer

Chairman, Illinois Commerce Commission -

Distribution:'

RPC (E-Mail)

' Project Mgr., NR.R w/enci

J. Caldwell, Rill w/enci

B. Clayton, Rill w/enci

- SRI Clinton w/enci - '

DRP w/enci

DRS w/ encl

Rlli PRR w/enci'

PUBLIC IE-01 w/enci I l

Docket File w/enci  !

GREENS 1 I

'

LEO (E-Mail) ~ l

' DOCDESK (E-Mail)

  • M004G

'

DOCUMENT NAME: G:\CLINTCLl99013.DRP

To #ccolve a co my of this document indic ate in the box: "C" = Copy w/o att/enci"E" = Copy w/sttlenci"N" = No copy

OFFICE Rill:DRP e/ Rill:DRP l# l l

NAME Kozak/kic/mi 4 Dapas M

'

DATE 08/l4/99- 08//f/DI

I' OFFICIAL RECORD COPY -

'