ML20245F340

From kanterella
Jump to navigation Jump to search
Forwards SER Accepting Util 841001,871118 & 880609 Responses to Generic Ltr 83-28,Item 2.1,Parts 1 & 2,re Evaluation of Reactor Trip Sys Equipment Classification & Vendor Interface,Respectively
ML20245F340
Person / Time
Site: Clinton Constellation icon.png
Issue date: 08/04/1989
From: John Hickman
Office of Nuclear Reactor Regulation
To: Holtzscher D
ILLINOIS POWER CO.
Shared Package
ML20245F345 List:
References
GL-83-28, NUDOCS 8908140244
Download: ML20245F340 (2)


Text

- . _ _ _ _ _ _ - _ _ _ _ _

,,

  • hCXET FIuE

' l: ,

(3 pony #o

g. UNITED STATES y .E o NUCLEAR REGULATORY COMMISSION g .:  ; ,

wAssancion. o.c. rosss k,..... /

  • August 4,1989 Docket No. 50-461 Mr. Dale L. Holtzscher Acting Manager - Licensing and Safety Clinton Power Station P. O. Box 678 Mail Code V920 Clinton, Illinois 61727

Dear Mr. Holtzscher:

SUBJECT:

SAFETY EVALUATION REPORT FOR NRC GENERIC LETTER 83-28. ITEM 2.1 (PARTI)AND(PART2)FORTHECLI!RONPOWERSTATION RE: Clinton Power Station, Unit 1 NRC Generic Letter 83-28, Item 2.1 (Part 1) required licensees to confirm that all components whose functioning is required to trip the reactor are identified as safety-related on all plant documentation and in information handling systems that are used to control any activities performed on this safety-related-equipment. Additionally, Item 2.1 (Part 2) of the same GL required licensees to confirm that they have established an interface with either the NSSS vendor or with the vendors of each of the components of their Reactor. Trip System.

The response was also required to confirm that this interface program includes periodic communication between the licensee and the vendor and a system of positive feedback which confirms receipt by the licensee of transmittals of technical information. You have responded te both parts of Item 2.1. Our review, as documented in the enclosed SER, finds your response to be acceptable.

Therefore, we consider Item 2.1 of Generic Letter 83-28 to be closed.

Sincerely, John B. Hickman, Project Manager Project Directorate III-2 Division of Reactor Projects III, IV, V, and Special Projects

Enclosure:

1. Safety Evaluation 1

\

cc w/ enclosure: DFo/

See next page l I

I 8908140244 61a L PDR ADOCK h k[yy p -

o p

v Mr. Dale L. Holtzscher Clinton Power Station Illinois Powe.r Company Unit 1 CC:

Mr. D. P. Hall Illinois Department Senior Vice President of Nuclear Safety Clinton Power Station Division of Engineering P. O. Box 678 1035 Outer Park Drive, 5th Floor Cilnton, Illinois 61727 Springfield, Illinois 62704 Mr. R. D. Freeman Mr. Donald Schopfer Manager-Nuclear Station Engineering Dept. Project Manager Clinton Power Station Sargent & Lundy Engineers P. O. Box 678 55 East Monroe Street Clinton, Illinois 61727 Chicago, Illinois 60603 Sheldon Zabel, Esquire Schiff, Hardin & Waite 7200 Sears Tower 233 Wacker Drive Chicago, Illinois 60606 Resident Inspector U. S. Nuclear Regulatory Commission RRf3, Box 229 A Clinton Illinois 61727 Mr. L. Larson Project Manager General Electric Company 175 Curtner Avenue, N/C 395 San Jose, California 95125 Regional Administrator, Region III 799 Roosevelt Road, Bldg. d4 Glen Ellyn, Illinois 60137 Chairman of DeWitt County c/o County Clerk's Office DeWitt County Courthouse Clinton, Illinois 61727 l

t - _- -_---- _ _ -