Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217H6231999-10-18018 October 1999 Discusses Completion of Licensing Action for GL 98-01 & Suppl 1, Yr 2000 Readiness of Computer Sys at Npps, to All Holders of Operating Licenses for NPPs ML20217J4331999-10-15015 October 1999 Forwards Insp Rept 50-461/99-19 on 990913-17.One Violation Re Individual Failure to Follow Radiation Protection Procedures When Accessing High Radiation Area Noted & Being Treated as Noncited Violation U-603280, Forwards Rev 27 to Clinton Power Station Physical Security Plan,Iaw 10CFR50.54(p).Encl Withheld from Public Disclosure, Per 10CFR50.54(p)1999-10-12012 October 1999 Forwards Rev 27 to Clinton Power Station Physical Security Plan,Iaw 10CFR50.54(p).Encl Withheld from Public Disclosure, Per 10CFR50.54(p) ML20217C0871999-10-11011 October 1999 Forwards Proprietary Attachment Inadvertently Omitted from Encl 2 to Submitting Responses to NRC RAI Re License Transfer Application for Plant.Proprietary Encl Withheld U-603276, Forwards Rev 8 to CPS USAR, Which Includes Changes from 970701 Through 990630 & Available Changes Approved After 990630 That Reduce Overall Burden of Submittal Changes for Forthcoming Reporting period.10CFR50.59 Rept Included1999-10-0808 October 1999 Forwards Rev 8 to CPS USAR, Which Includes Changes from 970701 Through 990630 & Available Changes Approved After 990630 That Reduce Overall Burden of Submittal Changes for Forthcoming Reporting period.10CFR50.59 Rept Included U-603279, Forwards non-proprietary & Proprietary Responses to NRC RAI Re License Transfer Application for Plant.Attached Responses Also Respond to Comments of Environ Law & Policy Center Dtd 990920.Proprietary Encl Withheld1999-10-0707 October 1999 Forwards non-proprietary & Proprietary Responses to NRC RAI Re License Transfer Application for Plant.Attached Responses Also Respond to Comments of Environ Law & Policy Center Dtd 990920.Proprietary Encl Withheld U-603275, Provides Updated Illinois Power Rept on Status of Decommissioning Funding for Clinton Power Station1999-10-0707 October 1999 Provides Updated Illinois Power Rept on Status of Decommissioning Funding for Clinton Power Station ML20217A9881999-10-0101 October 1999 Advises of NRC Plans for Future Insp Activities at Facility for Licensee to Have Opportunity to Prepare for Insps & to Provide NRC with Feedback on Any Planned Insps Which May Conflict with Plant Activities ML20217A7361999-10-0101 October 1999 Forwards Insp Repts 50-461/99-14 & 50-461/98-12 on 990729-0908.Two Violations Identified,One Re Failure to Place Control Switch in Proper Position to Identify Piece of out-of-svc Equipment & Being Treated as NCVs ML20217J1251999-09-30030 September 1999 Refers to Investigation 3-1997-040 Conducted from 971028- 980921 & Forwards Nov.Investigations Determined That During Jan 1997,supervisor Qv Dept Discriminated Against Qv Inspector in Retaliation for Inspector Contacts with NRC ML20217J1421999-09-30030 September 1999 Refers to Investigation 3-97-040 Conducted from 971028- 980921 & Forwards Nov.Investigation Concluded That Recipient Engaged in Deliberate Misconduct in That Recipient Discriminated Againt Qv Inspector for Having Contacted NRC ML20212G6751999-09-22022 September 1999 Forwards Comment Submitted to NRC by Environ Law & Policy Ctr Re Proposed License Transfer for Clinton Power Station U-603272, Provides Update to Final Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. 3-D Monicore & Station Security Sys remediated.Y2K Readiness Disclosure for Cps,Encl1999-09-22022 September 1999 Provides Update to Final Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. 3-D Monicore & Station Security Sys remediated.Y2K Readiness Disclosure for Cps,Encl U-603225, Provides Closure of Util Commitments Re Ci Cv Noted in Previous Ltr to Nrc.Basis for Expecting Valves to Remain in leak-tight Condition Throughout Operating Cycle & Basis That Justifies Not Performing mid-cycle Leak Testing,Encl1999-09-20020 September 1999 Provides Closure of Util Commitments Re Ci Cv Noted in Previous Ltr to Nrc.Basis for Expecting Valves to Remain in leak-tight Condition Throughout Operating Cycle & Basis That Justifies Not Performing mid-cycle Leak Testing,Encl ML20212G6981999-09-20020 September 1999 Requests That NRC Reject Proposed License Transfer for Clinton Power Station & That NRC State That Public Interest in Safe Nuclear Power Industry Will Not Be Subordinated to Interest in Maximizing Profit by Limiting Liability ML20217H3421999-09-17017 September 1999 Forwards Request for Addl Info Re Licensee 990723 Application for License Transfer & Conforming Administrative License Amend.Response Requested within 20 Days of Receipt of Ltr 05000461/LER-1996-010, Forwards LER 96-010-01, Plant Shutdown Due to Unidentified RCS Leakage from Degraded Reactor Recirculation Pump Seal Greater than TS Limit. Revised Rept Includes Cause of Event,Corrective Actions & Discussion of Similar Events1999-09-13013 September 1999 Forwards LER 96-010-01, Plant Shutdown Due to Unidentified RCS Leakage from Degraded Reactor Recirculation Pump Seal Greater than TS Limit. Revised Rept Includes Cause of Event,Corrective Actions & Discussion of Similar Events 05000461/LER-1999-011, Forwards LER 99-011-00 Re Improper Restoration of a APRM Which Caused Monitor to Not Meet Seismic Qualification Requirements.Rept Contains Listed Commitments1999-09-10010 September 1999 Forwards LER 99-011-00 Re Improper Restoration of a APRM Which Caused Monitor to Not Meet Seismic Qualification Requirements.Rept Contains Listed Commitments U-603269, Certifies That DB Livingston,License OP-31136,successfully Completed Facility Licensees Requirements to Be Licensed as Ro,Per 10CFR55 & Has Need for RO License to Perform Assigned Duties.Five Significant Control Manipulations,Listed1999-09-10010 September 1999 Certifies That DB Livingston,License OP-31136,successfully Completed Facility Licensees Requirements to Be Licensed as Ro,Per 10CFR55 & Has Need for RO License to Perform Assigned Duties.Five Significant Control Manipulations,Listed ML20211Q2671999-09-0808 September 1999 Informs That NRC Tentatively re-scheduled Initial Licensing Exams for License Operator License Applicants During Weeks of June 5 & 12,2000.Validation of Exams Will Occur at Station During Weeks of May 15,2000 U-603229, Provides Response to NRC RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, Dtd 990528.Rev 0 to Calculation IP-M-0556 & Rev 0 to Calculation IP-M-0570,encl1999-08-25025 August 1999 Provides Response to NRC RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, Dtd 990528.Rev 0 to Calculation IP-M-0556 & Rev 0 to Calculation IP-M-0570,encl U-603243, Forwards Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Util Performing Testing of ESF Ventilation Sys Charcoal Samples Using ASTM D3803- 1989 Methodology as Required by TS 5.5.71999-08-23023 August 1999 Forwards Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Util Performing Testing of ESF Ventilation Sys Charcoal Samples Using ASTM D3803- 1989 Methodology as Required by TS 5.5.7 ML20211D2201999-08-23023 August 1999 Confirms 990817 Telcon with J Neuschwanger & D Mcneil Re Arrangements Made for NRC to Inspect Licensed Operator Requalification Program at Plant U-603258, Forwards ISI Summary Rept, IAW ASME Section Xi,Article IWA-6000.Summary Rept Addresses ISI Activities Performed at Plant from 950429-990527,including Extended Sixth Refueling Outage1999-08-23023 August 1999 Forwards ISI Summary Rept, IAW ASME Section Xi,Article IWA-6000.Summary Rept Addresses ISI Activities Performed at Plant from 950429-990527,including Extended Sixth Refueling Outage ML20211B0871999-08-20020 August 1999 Responds to J Hopkins Inquiry Re Application for Order Consenting to License Transfer & Approving Conforming Administrative License Amend Filed by Ilpr & Amergen Energy Co on 990723 U-603259, Provides Notification That Cl Kreidler Has Resigned Position with Util,Effective 990818.License Status Should Be Changed to Expired1999-08-19019 August 1999 Provides Notification That Cl Kreidler Has Resigned Position with Util,Effective 990818.License Status Should Be Changed to Expired ML20211A8931999-08-19019 August 1999 Forwards Insp Rept 50-461/99-13 on 990611-0728.Two Violations Noted & Being Treated as Ncvs.Violation Re Three Examples Where Licensee Procedural Requirements for Minor Maint Work Were Not Followed U-603253, Notifies NRC That Je Smith,License SOP-30819-1,has Resigned from Position with Ilpr Effective 990813.Status of License Should Be Changed to Expired,Effective 9908131999-08-16016 August 1999 Notifies NRC That Je Smith,License SOP-30819-1,has Resigned from Position with Ilpr Effective 990813.Status of License Should Be Changed to Expired,Effective 990813 ML20210U3771999-08-12012 August 1999 Forwards Notice of Consideration of Approval of Transfer of FOL & Issuance of Conforming Amend & Opportunity for Hearing Re Amend Request for Approval of Clinton Power Station License NPF-62 Transfer to Amergen U-603250, Notifies NRC That Ma Freihofer (License SOP-31296-1) Has Resigned from Position with Illinois Power Effective 990729 & License Status Should Be Changed to Expired Effective 9907291999-08-10010 August 1999 Notifies NRC That Ma Freihofer (License SOP-31296-1) Has Resigned from Position with Illinois Power Effective 990729 & License Status Should Be Changed to Expired Effective 990729 U-603249, Notifies NRC That He Bouska (License SOP-3055-1) Has Resigned from Position with Illnois Power Effective 990809. & License Status Should Be Changed to Expired Effective 9908091999-08-10010 August 1999 Notifies NRC That He Bouska (License SOP-3055-1) Has Resigned from Position with Illnois Power Effective 990809. & License Status Should Be Changed to Expired Effective 990809 ML20210N2961999-08-0909 August 1999 Forwards Form of Nuclear Decommissioning Master Trust Agreement,Per CPS Application for License Transfer & Conforming Administrative License Amend U-603248, Requests Unrestricted License for Kc Scott,License SOP-31532.Scott Has Successfully Completed Facility Licensee Requirements to Be Licensed as Operator/Senior Operator Per 10CFR551999-08-0606 August 1999 Requests Unrestricted License for Kc Scott,License SOP-31532.Scott Has Successfully Completed Facility Licensee Requirements to Be Licensed as Operator/Senior Operator Per 10CFR55 U-603236, Forwards Revised Data Point Ref File Sheets for Clinton Power Station Computer Points That Input to ERDS1999-08-0202 August 1999 Forwards Revised Data Point Ref File Sheets for Clinton Power Station Computer Points That Input to ERDS ML20210J0541999-07-30030 July 1999 Forwards Three Original Signature Pages of Gr Rainey for Application for License Transfer & Conforming Administrative License Amend, for NRC Files U-603178, Forwards Four ASME Section XI Relief Requests Re Performance of non-destructive Exams for First 120-month Inservice Insp for CPS1999-07-29029 July 1999 Forwards Four ASME Section XI Relief Requests Re Performance of non-destructive Exams for First 120-month Inservice Insp for CPS U-603237, Informs That Util Will Provide Response to fire-related Questions One & Two of NRC RAI Re CPS Ipeee,By 0001311999-07-28028 July 1999 Informs That Util Will Provide Response to fire-related Questions One & Two of NRC RAI Re CPS Ipeee,By 000131 U-603240, Forwards Clinton Power Station semi-annual Fitness for Duty Rept for Period Ending 990630,IAW 10CFR26.711999-07-27027 July 1999 Forwards Clinton Power Station semi-annual Fitness for Duty Rept for Period Ending 990630,IAW 10CFR26.71 U-603235, Forwards Application for License Transfer & Conforming Administrative License Amend for OL NPF-62.Proprietary & Nonproprietary Asset Purchase Agreement Encl.Proprietary Info Withheld,Per 10CFR2.7901999-07-23023 July 1999 Forwards Application for License Transfer & Conforming Administrative License Amend for OL NPF-62.Proprietary & Nonproprietary Asset Purchase Agreement Encl.Proprietary Info Withheld,Per 10CFR2.790 ML20210A4401999-07-16016 July 1999 Forwards Insp Rept 50-461/99-10 on 990422-0610.Four Violations Being Treated as Noncited Violations ML20209G7671999-07-12012 July 1999 Ack Receipt of Encl FEMA Correspondence ,which Transmitted FEMA Evaluation Rept for 981118 Biennial EP Exercise at Clinton Power Station.No Deficiencies Were Observed ML20209D5691999-07-0707 July 1999 Forwards Insp Rept 50-461/99-12 on 990607-11.No Violations Noted.Insp Consisted of Selective Exam of Procedures & Representative Records,Observations of Work in Progress & Interviews with Personnel U-603231, Forwards Summary of Status of Plan for Excellence (Pee) Initiatives & Clinton Power Station (CPS) 1999 Business Plan.Encl Documents Provide Status & Disposition for Actions Not Completed to Date1999-07-0707 July 1999 Forwards Summary of Status of Plan for Excellence (Pee) Initiatives & Clinton Power Station (CPS) 1999 Business Plan.Encl Documents Provide Status & Disposition for Actions Not Completed to Date U-603214, Forwards Results of Analysis Performed on Recently Completed Vendor Contracts,Per GL 83-28, Required Actions Based on Generic Implications of Salem ATWS Events1999-07-0606 July 1999 Forwards Results of Analysis Performed on Recently Completed Vendor Contracts,Per GL 83-28, Required Actions Based on Generic Implications of Salem ATWS Events ML20196J9651999-07-0202 July 1999 Confirms Discussion Between Members of Staffs to Conduct Meeting on 990714 at Clinton Power Station to Discuss Results of Restart Insp & Licensee Progress in Addressing Remaining Long Term C/A Actions to Sustain Improvements ML20196J7131999-06-30030 June 1999 Informs of Closure of Response to Requests for Addl Info to GL 92-01,Rev 1,Supplement 1, Reactor Vessel Structural Integrity, for Clinton Power Station Unit 1 U-603218, Provides Final Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. Attachment Provides Y2K Readiness Disclosure for Plant1999-06-28028 June 1999 Provides Final Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. Attachment Provides Y2K Readiness Disclosure for Plant U-603212, Forwards Response to NRC 990315 Telcon Re Proposed Amend of License NPF-62,implementing Feedwater Leakage Control Sys Mode of RHR Sys1999-06-24024 June 1999 Forwards Response to NRC 990315 Telcon Re Proposed Amend of License NPF-62,implementing Feedwater Leakage Control Sys Mode of RHR Sys U-603227, Provides Updated Rept on Status of Decommissioning Funding for Plant.Updated Rept Provides Min Decommissioning Fund Estimate,Per 10CFR50.75(b) & (C) Utilizing NUREG-1307,Rev 8 Methodology1999-06-24024 June 1999 Provides Updated Rept on Status of Decommissioning Funding for Plant.Updated Rept Provides Min Decommissioning Fund Estimate,Per 10CFR50.75(b) & (C) Utilizing NUREG-1307,Rev 8 Methodology ML20196A3471999-06-16016 June 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-461/99-11 Issued on 990430.Corrective Actions Will Be Examined During Future Inspections 1999-09-08
[Table view] Category:NRC TO UTILITY
MONTHYEARML20058G2591990-11-0505 November 1990 Confirms 901106 Mgt Meeting in Region III Ofc to Discuss Violations Noted in Insp Rept 50-461/90-05 ML20058G1681990-11-0202 November 1990 Forwards Insp Rept 50-461/90-22 on 901015-19.Noncited Violation Noted ML20058D4331990-10-26026 October 1990 Informs That More than 60 Days Required to Complete Review of Util 900525 Submittal Incorporating Changes in QA Program Description ML20058D1791990-10-23023 October 1990 Forwards Safety Insp Rept 50-461/90-19 on 900822-1003.No Violations Noted ML20058A7471990-10-19019 October 1990 Forwards Safety Insp Rept 50-461/90-20 on 900924-28.No Violations Noted ML20058D5971990-10-18018 October 1990 Informs That Util 900925 Response to Generic Letter 90-03, Relaxation of Staff Position in Generic Ltr 83-28,Item 2.2 Part 2 'Vendor Interface for Safety-Related Components,' Acceptable ML20059F8891990-09-10010 September 1990 Ack Receipt of W/Payment of Civil Penalty in Amount of $25,000 ML20059H0641990-08-24024 August 1990 Advises That 880729 & 890921 Responses to Generic Ltr 88-01, IGSCC in BWR Austenitic Stainless Steel Piping, Acceptable W/Some Exceptions.Review of Exceptions Requested ML20059C0981990-08-21021 August 1990 Forwards Details of Allegation RIII-90-A-0065.Encl Withheld (Ref 10CFR2.790) ML20056B4361990-08-0808 August 1990 Comments on Util 891229 Response to Generic Ltr 89-10, Safety-Related Motor-Operated Valve (MOV) Testing & Surveillance. Addl Discussion of Plans for Periodic Verifications of Proper MOV Program Description Requested ML20058M6141990-08-0707 August 1990 Forwards Sample Registration Ltr for 901010 Generic Fundamentals Section of Written Operator Licensing Exam. Registration Ltr Listing Names of Candidates Taking Exam Should Be Submitted to Region 30 Days Prior to Exam Date ML20056A7651990-08-0303 August 1990 Forwards Safety Insp Rept 50-461/90-15 on 900723-27.No Violations Noted.Exercise Weakness Identified & Will Require Corrective Action ML20055J0031990-07-25025 July 1990 Corrected Forwarding Ltr for Requalification Exam Rept 50-461/OL-90-03,including Addl Senior Reactor W/Passing Grade in Exam ML20055J1671990-07-25025 July 1990 Forwards Safety Insp Rept 50-461/90-11 on 900512-0703. Violations Noted.Nrc Wants to Encourage & Support Licensees Initiatives for self-identification & Correction of Problems,Therefore,Notice of Violation Will Not Be Issued ML20055J0001990-07-25025 July 1990 Forwards Corrected Forwarding Ltr for Requalification Exam Rept 50-461/OL-90-03,including Results of Addl Senior Reactor Operators W/Passing Grade in Exam ML20055J3251990-07-25025 July 1990 Forwards Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $25,000 Re 900411 Control Rod Event ML20055G5991990-07-19019 July 1990 Advises That 900702 Rev 9D to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20055H3041990-07-19019 July 1990 Confirms Plans for Mgt Meeting on 900809 in Glen Ellyn,Il to Discuss Plant Performance & Other Issues ML20055D0181990-06-26026 June 1990 Discusses Review of s Documenting Oral Request for Waiver of Compliance Re Emergency Diesel Generator Operability Tech Specs ML20055E2461990-06-26026 June 1990 Advises That Scope,Objectives & Draft Scenario Manuals for Plant 900725 Emergency Preparedness Exercise Acceptable. NRC Will Provide Any Comments by 900713 ML20059M8591990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20248H0151989-10-0505 October 1989 Forwards Safety Insp Rept 50-461/89-28 on 890911-15 & Notice of Violation ML20248D5991989-10-0202 October 1989 Ack Receipt of & Payment of Civil Penalty in Amount of $75,000.In View of Corrective Actions Taken Re Electrical Junction Box,Partial Payment of Civil Penalty Acceptable ML20248H9911989-09-29029 September 1989 Forwards Amend 4 to Indemnity Agreement B-91 Reflecting Changes to Financial Protection Requirements & Indemnity Agreements ML20247H9591989-09-11011 September 1989 Confirms Plans for Operational Safety Team Insp on 890925- 30 to Review Nature of Problems During First Refueling Outage.List of Insp Team Members Encl ML20247H9101989-09-0707 September 1989 Confirms 890913 Meeting in Region III Ofcs to Discuss Preliminary Results from Recent INPO Evaluation ML20247C4731989-09-0707 September 1989 Advises That Written & Oral Operator & Senior Operator Licensing Exams Scheduled for Wk of 900115.Requirements & Procedures for Administration of Written Exams & Requirements for Facility Review of Written Exams Encl ML20246J3821989-08-21021 August 1989 Responds to Concerns Re NRC Position on Application of Plant Tech Spec for Inoperable Support Sys.Analysis Prepared by NRR Which Responds to Questions Raised Encl ML20246D2691989-08-18018 August 1989 Forwards Safeguards Insp Rept 50-461/89-25 on 890717-0802 & Notice of Violation.Notice of Violation Withheld (Ref 10CFR73.21(c)(2)) ML20246D9411989-08-18018 August 1989 Requests QA Audit Rept to Enable NRC to Review Security Screening Deficiencies Contained in LERs 89-S02-00 & 89-S02-01 ML20246D2321989-08-18018 August 1989 Forwards Addendum 1 to NRC Forwarding Insp Rept 50-461/89-18,consisting of Viewgraphs from 890614 Enforcement Conference Re Actions Taken Against Lead Radiation Monitoring Sys Engineer ML20246C4471989-08-17017 August 1989 Advises That Rev 9A to Physical Security Plan Transmitted by Consistent W/Provisions of 10CFR50.54(p) & Acceptable Except for Items Identified in Encl.Encl Withheld (Ref 10CFR73.21) ML20246B6131989-08-17017 August 1989 Forwards Amend 25 to License NPF-62 & Safety Evaluation. Amend Revises Tech Spec Table 3.3.2-1,providing Addl Info Re Channel Configuration for Main Steam Line Turbine Bldg Temp High Trip Channels ML20246C4271989-08-17017 August 1989 Forwards Safety Insp Rept 50-461/89-24 on 890801-04.No Violations Noted ML20245F3401989-08-0404 August 1989 Forwards SER Accepting Util 841001,871118 & 880609 Responses to Generic Ltr 83-28,Item 2.1,Parts 1 & 2,re Evaluation of Reactor Trip Sys Equipment Classification & Vendor Interface,Respectively ML20245F3201989-08-0303 August 1989 Forwards Mailgram Containing Info Re Potential Violence at Plant for Evaluation.Increased State of Security Awareness Implemented at Facility to Respond to Potential Violence & Local Law Enforcement & FBI Agencies Advised of Violence ML20245E9231989-08-0303 August 1989 Forwards Synopsis of NRC Investigations Rept 3-84-012 Re Baldwin Assoc Document Reviewers Accepting Bogus Documents or Coercing Individuals to Accept Bogus Documents. Allegations Unsubstantiated.Issue Closed ML20245F0141989-08-0303 August 1989 Confirms 890823 Meeting W/Util Onsite to Discuss Plant Performance Since Last Mgt Meeting,Monthly Performance Monitoring Rept & Execution of Licensee Commitments to NRC ML20247N7181989-07-28028 July 1989 Forwards Safety Insp Rept 50-461/89-22 on 890619-0721.No Violations Noted ML20247N6781989-07-25025 July 1989 Forwards Safety Insp Rept 50-461/89-18 on 890512-0707 & Notice of Violation ML20247N2761989-07-24024 July 1989 Forwards Safety Insp Rept 50-461/89-21 on 890601-23 & Notice of Violation.Insp Conducted in Response to 890601 Event Involving Loss of Reactor Recirculating Pump B Seals Which Resulted in RCS Leakage in Excess of 50 Gpm ML20247J7891989-07-24024 July 1989 Forwards Synopsis of Ofc of Investigations Rept 3-83-018 Re Possible Tampering W/Structural Steel Beam Connections. Although Region Agrees That Repts Falsified by Contractor,No Action Taken Since Inspector No Longer Employed at Plant ML20247H4371989-07-21021 July 1989 Requests That Licensee Perform Analysis Re Potential Safety Implications of 12-wk Rolling Maint Schedule at Plant.Util Should Provide Results of Analysis & Any Actions Deemed Appropriate to Region III within 60 Days of Receipt of Ltr IR 05000461/19890061989-07-20020 July 1989 Forwards Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $75,000 Resulting from Insps 50-461/89-06 & 50-461/89-14.Penalty Issued to Emphasize Importance of Adequate Planning & Procedures ML20246K7931989-07-12012 July 1989 Forwards Safety Insp Rept 50-461/89-20 on 890627-29.No Violations Noted.Nrc Expects That Util 1990 Emergency Preparedness Exercise Objectives Would Include Objectives Not Demonstrated Before 1989 Exercise Was Terminated ML20246C7981989-07-0606 July 1989 Forwards Ltr from Director,Ofc of Nrr,To Representative of Ecology Ctr of Southern California,Ack Receipt of Petition Filed by Ecology Ctr of Southern California & States Petition Being Treated Under 10CFR2.206 1990-09-10
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217H6231999-10-18018 October 1999 Discusses Completion of Licensing Action for GL 98-01 & Suppl 1, Yr 2000 Readiness of Computer Sys at Npps, to All Holders of Operating Licenses for NPPs ML20217J4331999-10-15015 October 1999 Forwards Insp Rept 50-461/99-19 on 990913-17.One Violation Re Individual Failure to Follow Radiation Protection Procedures When Accessing High Radiation Area Noted & Being Treated as Noncited Violation ML20217A7361999-10-0101 October 1999 Forwards Insp Repts 50-461/99-14 & 50-461/98-12 on 990729-0908.Two Violations Identified,One Re Failure to Place Control Switch in Proper Position to Identify Piece of out-of-svc Equipment & Being Treated as NCVs ML20217A9881999-10-0101 October 1999 Advises of NRC Plans for Future Insp Activities at Facility for Licensee to Have Opportunity to Prepare for Insps & to Provide NRC with Feedback on Any Planned Insps Which May Conflict with Plant Activities ML20217J1421999-09-30030 September 1999 Refers to Investigation 3-97-040 Conducted from 971028- 980921 & Forwards Nov.Investigation Concluded That Recipient Engaged in Deliberate Misconduct in That Recipient Discriminated Againt Qv Inspector for Having Contacted NRC ML20217J1251999-09-30030 September 1999 Refers to Investigation 3-1997-040 Conducted from 971028- 980921 & Forwards Nov.Investigations Determined That During Jan 1997,supervisor Qv Dept Discriminated Against Qv Inspector in Retaliation for Inspector Contacts with NRC ML20212G6751999-09-22022 September 1999 Forwards Comment Submitted to NRC by Environ Law & Policy Ctr Re Proposed License Transfer for Clinton Power Station ML20217H3421999-09-17017 September 1999 Forwards Request for Addl Info Re Licensee 990723 Application for License Transfer & Conforming Administrative License Amend.Response Requested within 20 Days of Receipt of Ltr ML20211Q2671999-09-0808 September 1999 Informs That NRC Tentatively re-scheduled Initial Licensing Exams for License Operator License Applicants During Weeks of June 5 & 12,2000.Validation of Exams Will Occur at Station During Weeks of May 15,2000 ML20211D2201999-08-23023 August 1999 Confirms 990817 Telcon with J Neuschwanger & D Mcneil Re Arrangements Made for NRC to Inspect Licensed Operator Requalification Program at Plant ML20211A8931999-08-19019 August 1999 Forwards Insp Rept 50-461/99-13 on 990611-0728.Two Violations Noted & Being Treated as Ncvs.Violation Re Three Examples Where Licensee Procedural Requirements for Minor Maint Work Were Not Followed ML20210U3771999-08-12012 August 1999 Forwards Notice of Consideration of Approval of Transfer of FOL & Issuance of Conforming Amend & Opportunity for Hearing Re Amend Request for Approval of Clinton Power Station License NPF-62 Transfer to Amergen ML20210A4401999-07-16016 July 1999 Forwards Insp Rept 50-461/99-10 on 990422-0610.Four Violations Being Treated as Noncited Violations ML20209G7671999-07-12012 July 1999 Ack Receipt of Encl FEMA Correspondence ,which Transmitted FEMA Evaluation Rept for 981118 Biennial EP Exercise at Clinton Power Station.No Deficiencies Were Observed ML20209D5691999-07-0707 July 1999 Forwards Insp Rept 50-461/99-12 on 990607-11.No Violations Noted.Insp Consisted of Selective Exam of Procedures & Representative Records,Observations of Work in Progress & Interviews with Personnel ML20196J9651999-07-0202 July 1999 Confirms Discussion Between Members of Staffs to Conduct Meeting on 990714 at Clinton Power Station to Discuss Results of Restart Insp & Licensee Progress in Addressing Remaining Long Term C/A Actions to Sustain Improvements ML20196J7131999-06-30030 June 1999 Informs of Closure of Response to Requests for Addl Info to GL 92-01,Rev 1,Supplement 1, Reactor Vessel Structural Integrity, for Clinton Power Station Unit 1 ML20196A3471999-06-16016 June 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-461/99-11 Issued on 990430.Corrective Actions Will Be Examined During Future Inspections ML20207D1261999-05-28028 May 1999 Forwards Request for Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20206P0641999-05-12012 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Aj Mendiola Will Be Section Chief for Clinton Power Station.Organization Chart Encl ML20206K4351999-05-0707 May 1999 Discusses NRC OI Investigation Rept 3-99-002 Re 981018 Personnel Error Which Resulted in Loss of Offsite Power Which Caused Loss of Only Operating Shutdown Cooling Subsystem ('A' RHR Pump) ML20206J7461999-05-0505 May 1999 Forwards Insp Rept 50-461/99-04 on 990301-0407.Four Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20206L5191999-05-0303 May 1999 Informs That on 990420-21 NRC Senior Managers Met to Evaluate Nuclear Safety Performance of Operating Reactors, Fuel Cycle Facilities & Other Matl Licenses ML20206G9691999-04-30030 April 1999 Forwards Insp Rept 50-461/99-11 on 990408-21 & NOV Re Failure to Correctly Translate Design Basis for Hydrogen Mixing Compressors Into EDG Load Calculation ML20206G6671999-04-30030 April 1999 Discusses Insp Rept 50-461/99-01 on 990208-0325.Number of Weaknesses Were Identified in C/A Program Re Approval Process for Issuing Condition Repts,Program Effectiveness Reviews & Issue Resolution.Six non-cited Violations Noted ML20206F2111999-04-27027 April 1999 Informs That NRC Considers Util Actions Associated with demand-for-info Pursuant to 10CFR50.54(f) Re C/A Program Performance at Clinton Power Station,Satisfactory & Therefore DFI Closed ML20206F2141999-04-27027 April 1999 Documents Completion of NRC Review of Specific Corrective Actions Util Committed to Complete Prior to Restarting Clinton Power Station & Forwards NRC Manual Chapter 0350 Restart Action Plan ML20206F1741999-04-27027 April 1999 Informs of Completion of Review of Actions Taken by Illinois Power as Specified in NRC CAL-III-97-09 Issued on 970806. Considers Actions Taken to Be Satisfactory & CAL Re 970805 W Circuit Breaker Failure at CPS Closed ML20205S6921999-04-21021 April 1999 Forwards Insp Rept 50-461/99-06 on 990217-0407.Four Violations Noted Re Professional Atmosphere of Main Control Room & Being Treated as Non-Cited Violations ML20205T5711999-04-21021 April 1999 Forwards Insp Rept 50-461/99-03 on 990208-0318.Eight Violations Occurred & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20205M9421999-04-13013 April 1999 Forwards Emergency Response Data System Implementation Documents.Data Point Library Updates for Kewaunee (271), San Onofre (272) & Clinton (273) Encl.Also Encl Plant Attribute Library Update for Grand Gulf (274).Without Encls ML20205P3921999-04-0909 April 1999 Forwards Emergency Preparedness Exercise Insp Rept 50-461/99-08 on 990309-12.No Violations Identified.Exercise Weakness Re Maintenance of Status of Repair Teams Identified During Insp ML20205H3001999-04-0101 April 1999 Confirms Plans to Have Meeting on 990416 at Clinton Power Station to Discuss Results of Plant Performance Review Process & Discuss Progress in Addressing Remaining Open Items in NRC Specific Checklist Which Need Resolution ML20205G2141999-04-0101 April 1999 Ack Receipt of ,Which Transmitted Changes Identified as Rev 26 to CPS Security Plan,Per 10CFR50.54(p) ML20205G5471999-03-26026 March 1999 Advises of Completion of Plant Performance Review on 990202 to Develop Integrated Understanding of Safety Performance. Three Areas of Concern Are Operator Performance,Cap Implementation & Resolution of Engineering Design Issues ML20205C5181999-03-26026 March 1999 Ack Receipt of Revising 2 Previously Communicated Corrective Action Commitments Contained in . Corrections Reviewed & NRC Have No Questions at Present Time ML20204J5071999-03-24024 March 1999 Forwards Insp Rept 50-461/98-29 on 981214-990217.No Violations Noted.Insp Conducted to Review Circumstances Surrounding Unsatisfactory Licensed Operator Performance That Staff Identified During Sept 1998 Operator Exam ML20204F4281999-03-18018 March 1999 Forwards Insp Rept 50-461/99-02 on 990107-0216.Violations Noted.Violation Re Engineering & Work Mgt Personnel Failure to Ensure Overdue Preventive Maint Items Were Completed ML20204E6311999-03-10010 March 1999 Forwards Insp Rept 50-461/99-05 on 990208-12 & Notice of Violation Re Inadequate Radiological Surveys Were Performed in Residual Heat Removal Heat Exchanger Room ML20207K2841999-03-0909 March 1999 Confirms Discussion Between Members of Staffs to Have Meeting on 990325 at Illinois Power Energy & Environ Ctr. Purpose of Meeting to Discuss Performance Improvement Initiatives ML20203F2541999-02-10010 February 1999 Informs That Beginning 990216,DE Hills Will Be Chief of Operations Branch Which Includes Operator Licensing Function ML20202J8541999-02-0505 February 1999 Forwards Notice of Proposed No Significant Hazards Consideration & Opportunity for Hearing ML20202H9941999-02-0303 February 1999 Forwards SE Accepting Changes in Quality Assurance Program Continuing to Meet Requirements of App B to 10CFR50 ML20202G4951999-02-0101 February 1999 Forwards Insp Rept 50-461/98-28 on 981214-18.No Violations Noted.Inspector Concluded That Risk Assessment Process for Evaluating on-line & Outage Maint Activities Has Been Developed ML20202H6851999-01-26026 January 1999 Forwards Request for Addl Info Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20202D7871999-01-22022 January 1999 Confirms Discussion Between Members of Staff to Have Meeting on 990205 at NRC Office in Lisle,Il to Discuss Performance Improvement Initiatives.Meeting Will Be Open to Public ML20203A0501999-01-22022 January 1999 Requests Expedited Publication of Encl Notice of Consideration of Issuance of Amend to Facility Operating License,Proposed NSHC Determination & Opportunity for Hearing on 990129 ML20206S0931999-01-22022 January 1999 Forwards Insp Rept 50-461/98-20 on 981118-0106 & Notice of Enforcement Discretion.Inspectors Identified That Operations Personnel Did Not Initiate Condition Repts for Several Nonconforming Conditions Documented in Main Control Room ML20199E1431999-01-12012 January 1999 Refers to Info Provided on 981229 That Was Requested by NRC in .Informs That Info Has Been Reviewed & Forwards List of Mods & Other Engineering Work Products Which Will Be Reviewed During Ssei ML20198S8221999-01-0505 January 1999 Confirms Discussion Between Members of Staff to Have Meeting on 990114 in Clinton,Il to Discuss Licensee Performance Improvement Initiatives 1999-09-08
[Table view] |
Text
~ ~
t< I GE%g%g,p. -- <
- a. .
.Qy x .
3; v.: < '
m;; .. <
i, y
,N.i y e s K
[o y
Docket No..50-461 C T 'M3 TIllinois Powe.r Company tATTN: Mr. D.sP Hall <
, Senior Vice President u :Clinton Power Station y . Mail, Code.V-275
- C P. 0.F. Box'678 e ,
Clinton, IL 61727-k E
Dear Mr. Hall:
SUBJECT:
OPERATOR AND SENIOR OPERATOR LICENSING; EXAMINATIONS 4
'In a tele' phone conversation.on. September 5', 1989 between'Mr. D. M. Antonelli,.
- Director, Operations Training and Mr. G. M. Nejfelt, Chief Examiner, arrangements:
'^ - were:made for,the administration.offexaminations at the Clinton Power Station.
- The~ written and oral examinations are scheduled for the week of January 15, 1990.'
<, The. material forwardad-for the September 1989 NRC Requalification Examination. '
will also be:used for the. January 1990;NRC Replacement Examination.
Therefore,.no additional n erence material ~is requested at this time. -The replacement ' examination is siew by-your staff, which is tentatively scheduled lfor the first week in December, will assure. that the information ~used in the s
' test has not been superseded .
~The' facility management is responsible for providing adequate space and
,' : accommodations-in order to. properly. conduct the written examinations: ~
Enclosure 1, " Requirements for Administration of Written Examinations,"
describes our requirements for conducting these examinations. Mr. Antonelli
~has also been informed of these, requirements.
. Enclosure 2 contains the Rules and Guidelines that will be in effect"during the administration of the1 written examination. The facility management:is responsible for ensuring that all applicants are aware of these Rules, e The= facility. staff review:of the written examination will be conducted in accordance' with requirements specified in' Enclosure 3, " Requirements for
~
Facility ReviewTof Written Examinations." ~ Mr. Antonelli has been informed of these requirements.
' LT6 better document simulator examinations.,'the Chief Examiner will have the
- facility simulator operator record predetermined plant conditions'(i.e., plant pressure, ' temperature, pressurizer level, etc.), for each simulator scenario. ,
- 1 pon4oook ADOCK Q%L ppc l
FDR V
s i jf 1
- _ - __ _ _ _ _ _ _ a
, 1 .
. Illinois Power. Company 2 SEO I1 i.
i E The applicants will'be responsible for providing this information, along with a' any appeal'of.a simulator operating examination. Therefore, the facility training staff should retain the simulator examination scenario information
-until all applicants who'.took the examinations have either passed the
- operating examination accepted the denial of their license, or filed an appeal.
All reactor operator and senior reactor operator license applications should be submitted at least.'60 days prior to the first examination dates so that
'we will be able to review the training and experience of the applicants, process the medical certifications, and prepare final examiner assignments
~.
after applicant eligibility has been determined. If the applications are-
. not. received at least 30 days prior to the examination dates.,. it is likely-that a postponement will-be necessary.
This request is covered by Office of Management'and Budget Clearance Number 3150-0101 which expires May 31,.1992. The estimated average burden is 7.7. hours per . response, including gathering, xeroxing and mailing the required material. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Records and Reports Management Branch, Division of Information Support Services, Office of Information Resources Management, U.S. Nuclear Regulatory Commission, Washington, D.C.
20555; and to the Paperwork Reduction Project (3150-0101), Office of Management and Budget, Washington, D.C. 20503.
Thank you for'your consideration in this matter. If you have any questions regarding the -examination procedures and requirements, please contact'Mr. G. M. Nejfelt at (312)790-5528.
Sincerely, OML "3"fD El ?"P C. WNT Geoffrey C. Wright, Chief
.0perations Branch
Enclosures:
- 1. Requirements for Administration
'of Written Examinations
- 2. NRC Rules and Guidelines For Written Examinations
- 3. Requirements for Facility Review of Written Examinations See Attached Distribution RIII I RIII Nej lt/cg Jor /r 2
g-
. x.
+
- . gn
. c. .
+
- (-
l, -
- f y, , p. ,_. t, 4
, 1' ,
,j
.x <
4 H >
Illinois" Power Company'. 3 gj>^qgg)
L ,
4 .I h
Distribution. '
t" -
1" t cc w/ enclosures:
e ,
'J.'S.~ Perry,' Assistant- ,
[- ,s
.. Vice President:
, , R.D. Freeman, Manager,. L ,
, j~ Nuclear Station:- .
4 Engineering Department. -
DCD/DCB-(RIDS)' .
Licensing Fee. Management. Branch
,, l Resident Inspector, RIII
..^
y . . Richard Hubbard 1 ~ ,
iLJ;=W. McCaffrey,. Chief, Public' Utilities Division. .< <
f 'H.LS.;;Tay1or,LQuality Assurance '
, -Division, Sargent & Lundy-L Engineers.'. .
J
' David.Rosenblatt', Govern'r's o
- 0ffice of~ Consumer. Services ' '
Sheldon Zabel,' Esquire,. .
.Schiff, Hardin, & Waite,
(:LT-Larson, Project' Manager, '
General Electric Company Chairman.of DeWitt County
!.IIlinois Department.of- '
. Nuclear. Safety-D. Schopfer, Project Manager, 4 Sargent & Lundy Engineers R. Wyatt, Plant Training Manager ,
n .
cc'w/o'enclosu'res:
J. B. Hickman, Project Manager, NRR K. E.E Perkins,' Branch Chief, OLB-M..A.; Ring, Section~ Chief,.DRP f
4 i
f
,' f k
r-h( < -
l' 3
iin .' _ .& _ _..Li. .. . _ _ . _3
,;1 w. .
, 9 a.: . ,
~- -
.g. .
1 y .r a ENCLOSURE 1 q; _ REQUIREMENTS FOR ADMINISTRATION OF WRITTEN EXAMINATIONS-f 4
7 o
_ i.
- 1. - A single room shall be provided for administration of the written examina-: 31 ti on~. The location of this' room and supporting restroom' facilities'shall i be such as,to prevent' contact with all'other facility and/or contractor personnel during the written examination. If necessary, the . facility; should-make arrangement for the use of a suitable room at a local school,.
T', ,
, mo.tel, or other building. Obtaining this. room is the responsibility ofJ the licensee;
- 2. Minimum spacing is required to ensure examination integrity as determined 3 m by the Chief! Examiner. Minimum spacing should be one applicant.per table, with a three fo'ot. space between tables.
- 3. Suitable arrangements shall be made by the facility'if the applicants.are to have' lunch,', coffee or.other refreshments. These arrangements shall comply _with Item 1 above and shall.be reviewed by the examiner and/or-proctor.
4 .~ The facilityllicensee shall provide' pads of 8-1/2 by 11 inch lined paper
~
in unopened. packages for each applicant's use in completing the examination. The examiner shall distribute'these pads to theLapplicants.
- 5. Applicants may bring pens, pencils, calculators or slide rules' into'the examination' room.. Only black. ink'or dark pencils should be used for writing answers to questions.
- 6. The licensee shall provide one set of steam tables for each applicant.
.The examiner'shall distribute the steam tables to the applicants. No wall charts, models, and/or other training materials shall be pres'ent in the examination room. No other equipment or reference material shall be allowed unless provided by the examiner.
y A
a m w <
+
-- =- : m fk ge[e i $ ?l .CwQ,I; ,Q ,ci
,t
'M '
I , . ,
\;
R g_ y ar- 't 8- f g p'
,[,h .
f
[4 F8'? hj3' '. s ,
[<
i
'A w, K J.< ,
i p- 4
$p .,{
1 s
g er, . ,.
'L' il
.[ E ,
v,, ENCLOSURE 2' ' '
d a ~
Ol' .
~
LPROCEDURES FOR THE-ADMINISTRATION OF WRITTEN EXAMINATIONS:
ppo .
y p
3 .. .
A. s , l 1. CheckLidentification badges.
e -
4
, ;*c $W L2, ?P assJoutfesaminstions and'all h'andouts. . Remin'd applicants not to. review fl A;4 ' Examination;untill instructed to;do so.
O M ,*' READ THE FOLLOWING INSTRUCTIONS VERBATIM:
^M
~
LDuring the administration of this. examination the following rules apply:
w
, 1. 1 Cheating o'n~'the_examinat_ ion means an" automatic denial of your! application ,
' E
- and could' result in more: severe penalties. '
t fj -
- 2. After the< examination has been' completed, you must sign.the statement s
,', 'on.the.. cover' sheet indicating that the work ~is.your own and you have not?
^
received 'or:given assistance in completing the examination.' This must 3 >
.be done after you complete the examination. ,
oy '
l' s,, JREAD THE?FOLLOWING INSTRUCTIONS:
[Restroom. trips are to be' limited and only one applicant at a time may'
~
. 11. -
. . leave. You must avoid all contacts with anyone outside the examination:
- ~
. room to: avoid even the appearance;or possibility of cheatingi *
- 2. ' Use black. ink or dark' pencil only to facilitate legible reproductions.
- 3. Print your name:in the blank provided:in the upper right-hand corner'of
.the' examination cover sheet. ,
4
. o 14 Fill in the date'on the cover' sheet of the' examination'(if,necessary). .
You may write.your answers on the examination question page or on a
~
t5.
Lseparate sheet of. paper. USE ONLY-THE PAPER PROVIDED AND 00 NOT WRITE ON THE BACK SIDE OF THE PAGE.
-6. If you' write your-' answers on the examination- question page: and you need
, :more space to, answer a specific question, use a separate sheet of the paper provided and; insert it~directly.after the specific question. D0 NOT. WRITE ON THE BACK SIDE OF THE EXAMINATION QUESTION'PAGE.
(o T 7. Print your name infthe upper right' hand corner of the first page of each
- m. v- : section of.your answer sheets'whether you use the examination question
'pages or separate sheets of paper. Initial each page.
m i
~
ma----ak-A. as au:n. - - - - - - - ---------------.s-_--------m--m._,.-uu--.aa. ---.n.-----.-,--_-w. _ - - - - . -- ---------_,-am----a-.,-----sus-m_----,--_M
m 1 .
3 ,
v -
ILICENSEEXAMINATIONSENCLOSURE2.(Cont!d) !)
o
.l
^l
' 8 .- Before you turniin;your examination, consecutively number each answer sheet, including any additional pages inserted when writing your answers.
on the: examination question page.
- 9. .If you are.using separate sheets, number 'ach e answer.as.to category and number (i.e.,; 1.04, 6.10)= and skip ~ at .least 3. lines. between answers .to allow spac'e~for grading.
- 10. Write "End of Category .
" at the end of your- answers to a' category. ~ ,
4
- 11. Start each category on a new page. ,
- 12. Write "Last Page" on the last answer sheet.
113. Use abbreviations;only if they are commonly used in facility literature.
Avoid using symbols such as < or > signs to avoid a simple transposition error resulting in an' incorrect answer. Write it out.
- 14. The' point .value. for each question is indicated in. parentheses after the question. The amount of blank space on an examination' question page'is v NOT an indication lof.the depth of answer required.
~ 15 ~. Show all calculations, methods, or assumptions used to obtain an answer. ;
- 16. Partial credit may-be given. .Therefore,' ANSWER ALL PARTS'0F THE QUESTION AND.DO NOT LEAVE'ANY ANSWER BLANK.
- 17. There is no partial credit fo' multiple.
r choice questions.
- 18. Proportional grading will be applied. Any' additional wrong information that is provided may count against you. For example, if a question is worth one point and asks for four responses, each of.which is worth 0.25 points, and youfgive five responses, each of your responses will be 6 worth 0.20 points. -If.one of your five responses is incorrect, 0.20 will be deducted and your total credit for that question will be 0.80 instead of 1.00 even though you got'the four correct answers.
- 19. .If the intent of a question is unclear, ask questions of the examiner only.
- 20. When turning in your examination, assemble the completed examination with examination questions, examination aids and answer sheets. In additio'n,.
' turn in all scrap paper.
- 21. To' pass the examination, you must achieve an overall grade of 80% or greater'and at lease 70% in each category.
- 22. There is a time limit of (6) hours for completion of the examination.
(Or some other time if less than the full examination is taken).
2
=- - _ - -_
p g.
, , c;;c '
-8 p .. . . c .- , . , 4 f' . k 4 '3d m -- ,
9
'3 ,' l,j
- . > < ;_g " ' r Dj g g . .
6 r;.1 w LICENSE EXAMINATIONS ENCLOSURE 2 (Cont'd). -
J E'.
f-
^.-23.- When you are done and have turned in yourLexamination,1ieavelt'he-
. examination area (DEFINE THE AREA). If- you are: found in this- area s '
While the. examination:is still in progress, your. license ~may be r.
+- denied.or revoked.' -l i
1
, 9
'h,,
e r
~'
s -
f
.*,h:
V V
i y
,f.:
A
.i.l i
-I
., l
..< q
-f 9
il 1
3 s . I g; ,r ]
dm.____.___ _ _ _ _ _ _ _ . _ _ _ _ . _ . _ _ _ _ _ _ . __ ______ ._ _ . _ _ _ _ _ _ _ . _ _ - . _ _ . _ _ _ -.___ _ _ __ _ _ _ _ . _ _ _ ___m__ _-b
7 -
fV. J.; ;
4 -
4 .
p' '.m 4
,g j n>+ l 3 ENCLOSURE 3 REQUIREMENTS FOR FACILITY REVIEW OF WRITTEN EXAMINATIONS ]
1
. 1. At the option of the Section Chief, the facility may review the written examination prior'to its administration. This review may take' place at l the facility or in the Regional office.
The Chief Examiner will coordinate, the details of the review with the facility. An NRC examiner willfalways be. present during the review. ;
t Whenever this option of examination review is' utilized, the facility.- 1 reviewers will' sign the following statement prior to being allowed access " {
to the examination. The, examination or written notes'will NOT be H retained by the facility.
,, 'a. Pre-Examination Security Agreement: '
I lagreedhat I will not knowingly divulge any information concerning the replacement'(or initial) examination scheduled for 'to any unauthorized persons. I understand that I am.
m v not to participate in any instruction involving those reactor operator' or senior reactor operator applicants scheduled to be administered the above replacement (or initial) examination from'now until after the examination'has been administered. ,
p I understand that violation of this security agreement could
' result in the examination being voided.
In addition, the facility staff reviewers will sign the following '
statement after the written examination has been administered.
- b. Post-Examination Security Agreement I did not, to the best of. knowledge, divulcje any information concerning the written examination administered on to any
. unauthorized persons. I did not participate in providing .q any instruction to those reactor operator and senior reactor ;
operator applicants who were administered the examination -<
from the time that I was allowed access to the examination.
I i
. _ . - _ - _ _ _. - _ . _ _ _ . - - _ _ _ _ _ _ - _ - _ - _ _ - - _ - . _ - - _ . . _ - - _ . .____-..--_.-__-__-____._______._-____2___.---.J
m -
gg ~ I a -
. .,2 #. ,,
'1
-ENCLOSURE 3 (Cont!d) l to.
~2. Regardless of whether the above examination review option,is. exercised,
.immediately following the administration of the written examination, the ,
E facility _ staff shall' be provided a marked-up copy. of the examination and-the answer. key. The copy of the' written examination shall include pen andlink changes made.to questions during the examination administration.
.If the facility did not review the examination prior to;its administration,.
they'will have five (5) working days from the day of the written examination to submit formal ' comments. If the facility reviewed the
. examination prior'to its administration, any additional. comments must be given to an' examiner prior to his/her leaving the site 'at the end of the-week of the written examination administration. In either case,.the comments will be addressed to the responsible Regional Office by the -
> highest.onsite level of corporate management for plant operations, e.g.,
Vice President for Nuclear Operations. . A copy of the submittal'will be forwarded to the Chief Examiner, as appropriate. Comments not submitted-within the required time frame'will be considered for. inclusion in the grading process on a case-by-case basis by the Regional' Office Section
' Chief. Should the comment submittal' deadline not be met, a.long delay-
' in grading the examinations may occur.
- 3. The following format should be adhered to for submittal of specific' comments:
.a. Listing of NRC Question, answer and reference
- b. Facility comment / recommendation
- c. Reference (to support facility comment)
NOTES: 1. No change to the examination will be made without submittal of a; reference to support ~the facility 'omment.
~c Any supporting documentation that was not previously supplied, should be provided.
- 2. -Comments'made without a concise facility recommendation will not be addressed.
2
- - _ _ - _ . _ _ _ _ _ _ _ _ _ _ _- - _ _ _ . _ _ - _ _ . . _ _ _ _ -