79,
-
. . , .
. . '
.-
Docket No. 50-461
OCT i 1989
i
111'inois Power Company
j
ATTN: Mr. D. P. Hall
1
. Senior Vice President
l
Clinton Power Station-
-
Mail Code V-275
!
P. O. Box 678
Clinton, IL 61727
Gentlemen:
This refers to the routine safety inspection conducted by Mr. Joseph M. Ulie
!
of this office on September 11-15, 1989, of activities at Clinton Power Station
~
'
authorized by NRC Operating License No. NpF-62, and to the discussion of our
.
findings with Mr. J.
S.. Perry.at the conclusion of the inspection. The
purpose of this inspection was to review the implementation of.the. licensee's
-i
The enclosed' copy of our inspection report identifies areas examined during
the inspection. .Within these areas, the. inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be_ in violation
!
of NRC requirements, as described in the enclosed Notice. The inspection
!
.showed that actions had been taken to correct the identified violation and
i
to prevent recurrence. Our understanding of your corrective actions is
i
described in Paragraph 4 of the enclosed inspection report.
Consequently,
no reply to the violation is required and we have no further questions
regarding this matter at this time.
In_accordance with 10 CFR 2.790 of the Commission's regulations, a' copy of
!
this letter and the enclosed inspection report will be placed in the NRC
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
l
Sincerely,
ORIGINAL SIGNED BY R. N. GARDNER (FOR)
R. W. Cooper, II, Chief
Engineering Branch
L
Enclosures:
1.
2.
Inspection Report
i
No. 50-461/89028(DRS)
]
!
See Attached Distribution
!
I
1
RIII
RIII
RI
RI I
)
%
0
I P 'r
C
Ulie sm
ardner
Rin
Cooper
goAM
t c^\\ @
ySZ
t
s910110147 891003
I l
ADOCK0500tjgdg1
FDR
._.
_ _ -
-
_ _ - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _
,:
.
..
t
,4
-
.,
Illinois Power Company
2
OCT 5
1939
s
4
!
Distribution
cc w/ enclosures:
J. S. Perry, Assistant
~
Vice President
g
F. A. Spangenberg,, Manager
Licensing and Safety Department
DCD/DCB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
J. W. McCaffrey, Chief, Public
Utilities Division
H. S. Taylor,- Quality Assurance
Division, Sargent & Lundy
Engineers
David Rosenblatt, Governor's
Office of Consumer Services
Sheldon Zabel, Esquire,
Schiff, Hardin, & Waite
L. Larson, Project Manager,
General Electric Company
Chairman of DeWitt County
Illinois Department of
Nuclear Safety
D. Schopfer, Project Manager,
Sargent & Lundy Engine 6rs