ML20058G168

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-461/90-22 on 901015-19.Noncited Violation Noted
ML20058G168
Person / Time
Site: Clinton Constellation icon.png
Issue date: 11/02/1990
From: Greger L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jamila Perry
ILLINOIS POWER CO.
Shared Package
ML20058G170 List:
References
NUDOCS 9011090448
Download: ML20058G168 (2)


See also: IR 05000461/1990022

Text

'

e

,

4880g

UNITO STATES

k

k

NUCLEAR REGULATORY COMMISSION'

l

"g

REGION Ill

e<

'

799 MooSEVELT RO AD

5

-

'

QLEN ELLYN, ILLINOtt 40137-

    • "*

Nov 0 21990

l

1

Docket No. 50-461

)

Illinois Power Comp 6ny_

ATTN:

J. S. Perry-

Vice President

j

Clinton Power Station

Mail Code V-275'

P. D. Box 678-

i

Clinton, IL 61727

l

Gentlemen:

This refers to the routine safety inspection conducted byL Mr.- W.;B. Grant

-

and others of -this office on October 1o-19,1990, of :etivities at the

i'

Clinton Power Station, Unit-1, tautnorized by NRC Operating License

No. NPF-62 and to the discussion of our: findings with you and others of;

your staff at the conclusion of the inspection.

s

The enclosed copy of our inspection report identifies . areas examined duringl

the inspection. Within these areas, the fins'pection consisted of a selective

examination of- procedures and. representative. records, observations,1 and.

!

interviews with personnel.-

-

1

i

During this inspection, certain of your activities appeared to be in' violation -

1

of NRC requirements, as ' described in the enclosed = inspection report.

However, .

- !

because the NRC wants to encourage and support licensee's initiatives.for self

d

identification and correction of problems. the NRC will not generally issue a

Notice of Violation for a violation that-meets the requirements'of 10.CFR 2',

j

'

Appendix C,Section V.A.

This'is the case with the' violation discussed in'

!

Section 7 of the enclosed inspection report. :No reply to theiviolation is-

I

required and we have no further questions' regarding. this matter at; this time.-

In accordance with-10 CFR 2.790 of the Commission's regulations, a copy of

3

this letter and the enclosed-inspection report'willibe placed in the NRC

Public Document Room.

,

. I

.

1

.

PDR

ADOCK 00000461 t

" * ts

/ hl

.

9011090448 902102

P

'

~

0

PNV IE .

i'>

4

. _ . .

j

,

.

j

.

.\\

-

a

-!

,,

.

Illinois Power Company _

W 0 1 1990

-2.

We will gladly discuss any questions you'have'concerning this inspection.

Sincerely,

-

.L.-Robert Greger, Chief

!

Reactor. Programs Branch

. Enclosure:

Inspection Report

.

No. 50-461/90022(DRSS)-

[

cc w/ enclosure:

J. Cook, Manager, Clinton Power Station

.,

F. Spangenberg, III, Manager -

Licensing and S .f-ety

3

DCD/DCB (RIDS) V

OC/LFOCB

Resident Inspector, RIII

J. Hickman, NRR, PM

l

.

J. McCaffrey, Chief,'Public

>

Vt111 ties Division

H. Taylor, Quality Assurance

Division, Sargent & Lundy

Engineers

L

Patricia O'Brien,. Governor's-

l

Office of Consumer Services

l

S.'Zabel, Esquire,.Schiff, Hardin,

!

l

& Waite

L. Larson, Project Manager,

L

General Electric Company

Chairman, DeWitt County Board

Illinois Department of

Nuclear Safety

Robert Newmann, Office of Public

Counsel, State of Illinois Center.

~

Perry SRI

'

.