ML20058G168

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-461/90-22 on 901015-19.Noncited Violation Noted
ML20058G168
Person / Time
Site: Clinton Constellation icon.png
Issue date: 11/02/1990
From: Greger L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jamila Perry
ILLINOIS POWER CO.
Shared Package
ML20058G170 List:
References
NUDOCS 9011090448
Download: ML20058G168 (2)


See also: IR 05000461/1990022

Text

'

e ,

4880g UNITO STATES

e<

k k"g NUCLEAR REGULATORY COMMISSION'

REGION Ill

l

'

5 - 799 MooSEVELT RO AD

'

QLEN ELLYN, ILLINOtt 40137-

    • "* Nov 0 21990 l

1

Docket No. 50-461 )

Illinois Power Comp 6ny_

ATTN: J. S. Perry-  ;

Vice President j

Clinton Power Station

Mail Code V-275'

P. D. Box 678- i

Clinton, IL 61727 l

Gentlemen:

This refers to the routine safety inspection conducted byL Mr.- W.;B. Grant

-

and others of -this office on October 1o-19,1990, of :etivities at the i'

Clinton Power Station, Unit-1, tautnorized by NRC Operating License

No. NPF-62 and to the discussion of our: findings with you and others of;

your staff at the conclusion of the inspection. s

The enclosed copy of our inspection report identifies . areas examined duringl

the inspection. Within these areas, the fins'pection consisted of a selective

examination of- procedures and. representative. records, observations,1 and.

-

!

interviews with personnel.- 1

i

During this inspection, certain of your activities appeared to be in' violation - 1

of NRC requirements, as ' described in the enclosed = inspection report. However, . -!

because the NRC wants to encourage and support licensee's initiatives.for self d

identification and correction of problems. the NRC will not generally issue a  ;

Notice of Violation for a violation that-meets the requirements'of 10.CFR 2',

'

j

Appendix C, Section V.A. This'is the case with the' violation discussed in'  !

Section 7 of the enclosed inspection report. :No reply to theiviolation is- I

required and we have no further questions' regarding. this matter at; this time.-  :

In accordance with-10 CFR 2.790 of the Commission's regulations, a copy of 3

this letter and the enclosed-inspection report'willibe placed in the NRC

Public Document Room.

,

. I

.

1

.

.

~

9011090448 902102 P

/ hl

'

PDR ADOCK 00000461 t  ; " * ts

0 PNV IE . *

i'> 4

. _ . .

,

.

j

j .

.\

-

a

,, .

-!

Illinois Power Company _ -2.

W 0 1 1990

We will gladly discuss any questions you'have'concerning this inspection.

Sincerely, -

.L.-Robert Greger, Chief  !

Reactor. Programs Branch

. Enclosure: Inspection Report .

No. 50-461/90022(DRSS)- [

cc w/ enclosure:

J. Cook, Manager, Clinton Power Station .,

F. Spangenberg, III, Manager -

Licensing and S3.f-ety

DCD/DCB (RIDS) V

OC/LFOCB

Resident Inspector, RIII

J. Hickman, NRR, PM

.

l

J. McCaffrey, Chief,'Public >

Vt111 ties Division

H. Taylor, Quality Assurance

Division, Sargent & Lundy

Engineers  :

L Patricia O'Brien,. Governor's-

l Office of Consumer Services

l S.'Zabel, Esquire,.Schiff, Hardin,  !

l & Waite  ;

L. Larson, Project Manager, L

General Electric Company

Chairman, DeWitt County Board

Illinois Department of

Nuclear Safety

Robert Newmann, Office of Public

~

Counsel, State of Illinois Center.

Perry SRI

'

.