ML20246K793
| ML20246K793 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 07/12/1989 |
| From: | Greger L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Gerstner W ILLINOIS POWER CO. |
| Shared Package | |
| ML20246K800 | List: |
| References | |
| NUDOCS 8907180269 | |
| Download: ML20246K793 (2) | |
See also: IR 05000461/1989020
Text
_ _ - .
w
JUL 121989
,
.
Docket No. 50-461
Illinois Power Company
ATTN:
Mr. W. C. Gerstner
Executive Vice President
s-
.500 South 27th Street
Decatur, IL 62525
Gentlemen:
This refers to the routine safety inspection conducted by Mr. T. Ploski and
others of this office on June 27-29, 1989, of activities at Clinton Power
Station, Unit 1, authorized by NRC Operating License No. NPF-62, and to the
discussion of our findings with Mr. J. S. Perry and others of your staff at
-the conclusion of the inspection.
,
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection.
A decision was made to terminate the annual emergency preparedness exercise
following an actual, unrelated reactor trip which resulted from a main
transformer problem.
Although the bulk of the exercise objectives were
demonstrated, onsite recovery planning and several challenging inplant damage
control activities could not be demonstrated prior to exercise termination.
Therefore, we expect that your 1990 exercise objectives would include those few
objectives which were not demonstrated before the 1989 exercise was terminated.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
0907100269 890712
gDR
ADOCK 05000461
PNu
/
ll2%
o
Greger, Chief
.
Reactor Programs Branch
Enclosure:
Inspection Report
No. 50-461/89020(DRSS)
/
See Attached Distribution
75
')
i
(t
Rg
s
it(n
RI
RI
/
RIII ,
RIII
g /Ims
i
?
<[nSnell
Ring
Il
ski
Patt
o
Pps
y
p
wn
i
!
L_______-_____
- . - - .
_
_
- .
,
d
,
c,
n.
b =h
i
' Illinois Power Company
2 'JUL 121989
)
i
'
Distribution
.o
cc w/ enclosure:
I
D.
P.. Hall, Vice President
J. S. Perry, Assistant
Vice President
R. D. Freetnan, Manager,
= Nuclear Station
Engineering Department
..
DCD/DC3 (RIDS)
Licensing Fee Management Branch-
.
Resident Inspector, RIII
Richard Hubbard
J. W. McCaffrey, Chief, Public
Utilities Division
H. S. Taylor,-' Quality Assurance
Division Sargent.& Lundy
Engineers
.
!
<
David Rosenblatt, Governor's-
Office of Consumer Services
Sheldon Zabei, Esquire,
Schiff,'Hardin & Waite
.L. Larson, Project Manager,
General Electric. Company
' Chairman of.DeWitt County
Illinois Department of
Nuclear. Safety .
.D. Schopfer, Project Manager,
Sargent & Lundy Engineers
W. Travers, EPB, NRR
D. Bement, FEMA, RV
1
. _ _ . _
_ . . _ . . _ _ _ . . _ . _ . _ _ _ _ _ . _ _ _ _ . _ _ -