Forwards Safety Insp Rept 50-461/89-20 on 890627-29.No Violations Noted.Nrc Expects That Util 1990 Emergency Preparedness Exercise Objectives Would Include Objectives Not Demonstrated Before 1989 Exercise Was Terminated
ML20246K793
Person / Time
Site: Clinton Constellation icon.png
Issue date: 07/12/1989
From: Greger L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gerstner W
ILLINOIS POWER CO.
Shared Package
ML20246K800 List:
References
NUDOCS 8907180269
Download: ML20246K793 (2)


See also: IR 05000461/1989020

Text

_ _ - .

w

,

JUL 121989

.

Docket No. 50-461

Illinois Power Company

ATTN: Mr. W. C. Gerstner

Executive Vice President

s- .500 South 27th Street

Decatur, IL 62525

Gentlemen:

This refers to the routine safety inspection conducted by Mr. T. Ploski and

others of this office on June 27-29, 1989, of activities at Clinton Power

Station, Unit 1, authorized by NRC Operating License No. NPF-62, and to the

discussion of our findings with Mr. J. S. Perry and others of your staff at

, -the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

A decision was made to terminate the annual emergency preparedness exercise

following an actual, unrelated reactor trip which resulted from a main

transformer problem. Although the bulk of the exercise objectives were

demonstrated, onsite recovery planning and several challenging inplant damage

control activities could not be demonstrated prior to exercise termination.

Therefore, we expect that your 1990 exercise objectives would include those few

objectives which were not demonstrated before the 1989 exercise was terminated.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

0907100269 890712

gDR ADOCK 05000461

PNu / ll2%

. o Greger, Chief

Reactor Programs Branch

Enclosure: Inspection Report

No. 50-461/89020(DRSS)

/ ;

See Attached Distribution 75

RIII , RIII

')

Rg RI RI

i/

g ski/Ims Patt

(t

o

i sRing it(n  ?

Il

P

ps y <[nSnell

p wn i

!

L_______-_____

- . - - . _ _ - .

,

d

,

c, n.  ;

b =h

i

' Illinois Power Company 2 'JUL 121989 )

i

'

Distribution

.o

cc w/ enclosure: I

D. P.. Hall, Vice President

J. S. Perry, Assistant

Vice President

R. D. Freetnan, Manager,

= Nuclear Station

Engineering Department

..

DCD/DC3 (RIDS)

  • Licensing Fee Management Branch- .

Resident Inspector, RIII

Richard Hubbard

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor,-' Quality Assurance

Division Sargent.& Lundy

< Engineers .

!

David Rosenblatt, Governor's-

Office of Consumer Services

Sheldon Zabei, Esquire,

Schiff,'Hardin & Waite

.L. Larson, Project Manager,

General Electric. Company

' Chairman of.DeWitt County

Illinois Department of

Nuclear. Safety .

.D. Schopfer, Project Manager,

Sargent & Lundy Engineers

W. Travers, EPB, NRR

D. Bement, FEMA, RV

1

. _ _ . _ _ . . _ . . _ _ _ . . _ . _ . _ _ _ _ _ . _ _ _ _ . _ _ -