Forwards Insp Rept 50-461/98-29 on 981214-990217.No Violations Noted.Insp Conducted to Review Circumstances Surrounding Unsatisfactory Licensed Operator Performance That Staff Identified During Sept 1998 Operator Exam
ML20204J507
Person / Time
Site: Clinton Constellation icon.png
Issue date: 03/24/1999
From: Dapas M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Mcelwain J
ILLINOIS POWER CO.
Shared Package
ML20204J512 List:
References
50-461-98-29, NUDOCS 9903300105
Download: ML20204J507 (3)


See also: IR 05000461/1998029

Text

_

..

.

March 24,1999

Mr. John P. McElwain

Chief NuclearOfficer

. Clinton Power Station

Illinois Power Company

Mail Code V-275

P. O. Box 678 -

Clinton,IL 61727.

SUBJECT:

NRC INSPECTION REPORT 50-461/98029(DRS)

j

Dear Mr. McElwain:

On February 17,1999, the NRC completed a licensed operator requajiiication program

inspection at your Clinton Nuclear Power Station. The purpose of this inspection was to review

the circumstances surrounding the unsatisfactory licensed operator performance that your staff

identified during the September 1998 annual licensed operator requalification examination.

During this inspection, the inspectors also evaluated remedial actions taken by your staff and

observed your training personnel administer and evaluate dynamic simulator scenario

examinations for all licensed operators. The enclosed report presents the results o' this

inspection.

During the dynamic simulator scenario portion of the September 1998 annuallicensed

operator requalification examinations, your training staff identified unsatisfactory operator

performance for 4 of 7 crews and 35 of 56 operators. Your staff identif!sd operator

performance deficiencies regarding emergency operating procedure usage, communications,

command and control, and teamwork. In the root cause analysis for these performance

, deficiencies, your staff identified that weaknesses in licensed operator requalification training

(LORT) practices were a contributing factor to the poor operator performance. The inspectors

reviewed the weaknesses identified by your staff in the LORT program, including: (1) use of

feedback, (2) training quality, (3) simulator training time, (4) change management, (5)

examination results documentation, (6) use of examination sample plans, and (7) trending of

operator performance in the simulator. Two primary causes identified in your staff's root cause

analysis were a lack of leadership in the LORT program and a low priority for the LORT

program. We determined that your staff's root cause analysis was thorough and that the

remedial actions implemented to address the identified weaknesses were appropriate.

Although your staff identified the operator performance and training issues, we are concerned

that it took a large number of operator and crew failures during your annual licensed operator

requalification examinations before your staff realized that operator performance and

l

programmatic weaknesses existed.

)

J

The inspectors observed your training staff conduct dynamic simulator scenario examinations

for all licensed operators and crews on January 4 - February 12,1999. Overall operator

performance was good. The examination material was challenging; however, because it

consisted primarily of off-normal and emergency events, the inspectors did not draw any

9903300105 990324

"

PDR

ADOCK 05000461

G

PDR

,

4

J. McElwain

-2-

I

,

specification usage. The inspectors identified some instances where your staff did not identify

operator performance deficiencies.

In accordance with 10 CFR 2.700 of the NRC's " Rules of Practice," a copy of this letter and its

- enclosures will be placed in the NRC Public Document Room. We will gladly discuss any

,

questions you have conceming this inspection.

Sincerely,

Original Signed by Garc L. Dapas

Marc L. Dapas, Deputy Director

Division of Reactor Projects

Docket No.:

50-461

License No.: NPF-62

Enclosures:

1. Inspection Report 50-461/98029(DRS)

2. Simulation Facility Report

cc w/encis:

G. Hunger, Station Manager

R. Phares, Manager, Nuclear Safety

and Performance improvement

J. Sipek, Director- Licensing

M. Aguilar, Assistant Attomey General

G. Stramback, Regulatory Licensing

Services Project Manager

General Electric Company

Chairman, DeWitt County Board

State Liaison Officer

Chairman, Illinois Commerce Commission

l

l

DOCUMENT NAME: G:DRSV'.Ll98029.WPD

t.pa. . em .,w e.co none in o we e co m .a.ct

w.acau,. -r c= * .a.em.anaemor. w %em

OFFICE

Ril

l

Rlli

lC Rlli

Rlli

-

-

NAME

Mullerjp /Ytt_

Hills #rA

KozaP A

Dapas M

DATE

03/W/99

03A1/99

03/4h9

03tEfJ9~

OFFICIAL RECORD COPY

m

t

J. McElwain

-3-

.

Distribution:

RPC (E-Mail)

Project Mgr., NRR w/encls

J. Caldwell, Rill w/encls

B. Clayton, Rill w/encls

SRI Clinton w/encls

DRP w/encls

4

TSS w/encls

!

DRS (2) w/encls

Rlli PRR w/encls

{

' PUBLIC IE-42 w/encls

Docket File w/encls

GREENS

LEO (E-Mail)

DOCDESK (E-Mail)

M. Bies, Rill w/encls

'

/

t

.

300070