ML20150B890

From kanterella
Jump to navigation Jump to search
Forwards Draft Rev 5 to ES-601, Administration of NRC Requalification Program Evaluations. W/O Encl
ML20150B890
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 06/23/1988
From: Wright G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Roy P
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
References
NUDOCS 8807120230
Download: ML20150B890 (1)


Text

. ,a .

JUN I 31999 Docket No. 50-331 Iowa Electric Light and Power Company Duane Arnold Energy Center ATTN: Mr. Paul Roy Training Department P. O. Box 351 Cedar Rapids, IA 52406

SUBJECT:

REQUALIFICATION EXAMINATIONS

Dear Mr. Roy:

Region III has completed a pilot requalification exam at the Perry facility utilizing the new requalification examination methodology.

In order to provide you with the le";t, although not necessarily final, procedure and guidance on the requi..ification process the following information is being provided for your information.

1. Draft of ES601 Rev 5 "Administration of NRC Requalification Program Evaluations".
2. Written Exam from Perry
3. Selected Simulator Scenarios from Perry
4. Selected Job Performance Measures (JPM) from Perry.

If you have any questions on the present status of the process please contact me at (312) 790-5695.

Sincerely.

DR10lNAL. SIGNED BY. GE0ffREY C. WRIGHI Geoffrey C. Wright, Chief Operations Branch

Enclosures:

As stated cc w/ enclosures:

Duane Arnold, SRI cc w/o enclosures:

1 Jackiw, DRP RJII

/W g /mc ggn18BaR818ej}gt ps"/A