NG-99-1278, Forwards Corrected TS Page 3.3-52 Re TS Change Request TSCR-003,removing Requirements for Hpcis & Rcics Isolation Manual Initiation Instrumentation.Page Indicates Deletion of Condition G as Well as or G from Condition H

From kanterella
Jump to navigation Jump to search
Forwards Corrected TS Page 3.3-52 Re TS Change Request TSCR-003,removing Requirements for Hpcis & Rcics Isolation Manual Initiation Instrumentation.Page Indicates Deletion of Condition G as Well as or G from Condition H
ML20212B978
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 09/15/1999
From: Peveler K
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
To: Mozafari B
NRC (Affiliation Not Assigned)
Shared Package
ML20212B982 List:
References
NG-99-1278, NUDOCS 9909210079
Download: ML20212B978 (2)


Text

[ ,

i A LLI ANT  !

] UTILITIES its nam ino Duane Arnnid 1.ncigv Crmer IES Utilities m7 D^tc n >.id e.an, a u u om Othce.3s9 M I.~01i f ax: 319 H".I 79 Mis www.alhantenergs corn September 15,1999 NG-99-1278 Ms. Brenda Mozafari Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission OWFN 13D18 Washington, DC 20555-0001

Subject:

Duane Arnold Energy Center Docket No: 50-331 Op. License No: DPR-49 Editorial Correction To Mark-up For Technical Specification Change Request (TSCR-003): " Removal Of Requirements For fligh Pressure Coolant Injection System and Reactor Core isolation Cooling System Isolation Manual Initiation Instrumentation" 1

Reference:

Letter, J. Franz (IES Utilities Inc.) to Office of Nuclear Reactor Regulation, .

Technical Specification Change Request (TSCR-003): " Removal Of l Requirements For Iligh Pressure Coolant Injection System and Reactor Core Isolation Cooling System isolation Manual Initiation Instrumentation", NG-99-0008, dated February 18,1999 File: A-117

Dear Ms. Mozafari:

Please find enclosed the corrected mark-up for page 3.3-52 for the referenced Technical Specification Change Request. The mark-up indicates deletion of CONDITION G as well as "or G" from CONDITION H. This correction is needed due to an administrative oversight during preparation of the referenced submittal. The referenced submittal Description of Changes indicates deletion of CONDITION G from page 3.3-52. No changes are required to the 10 CFR 50.92 Evaluation. Description of Changes, Safety Assessment, or Environmental Consideration.

No new commitments are made in this letter.

kb 9909210079 990915 PDR ADOCK 03000331 l

P pm L

. Sept:mber 15.1999 NG-99-1278 Page 2 of 2 Please contact this office if you require further information regarding this matter.

Sincerel>,

fo' r Kenneth E. Peveler Manager, Regulatory Performance Enclosure cc: D. Barta E. Protsch (w/o)

D. Wilson (w/o)

J. Dyer (Region 111)

P. Baig (State ofIowa)

NRC Resident Office

NRC Dodument Control Deski Docu CTS Project

, _ _ _ _ _ _ _ - _ _ - - - - - - -