Text
..
UNITED STATES
. pa et49'o
NUCLEAR REGULATORY COMMISSION
g
[
REGION til
o
801 WARRENVILLE ROAD
g
,g
LISLE. ILLINOIS 60532-4351
g,4***j
August 26,1999
Mr. John F. Franz, Jr.
Vice President, Nuclear
Alliant Tower
4
200 First Street SE
P. O. Box 351
Cedar Rapids, lA 52406-0351
SUBJECT:
DUANE ARNOLD INSPECTION REPORT 50-331/99009(DRP)
Dear Mr. Franz:
This refers to the inspection conducted on July 8 through August 19,1999, at the Duane Arnold
Energy Center (DAEC) facility. The NRC conducted a routine safety inspection. The enclosed
report presents the results of this inspection.
During this 6-week inspection period, your conduct of activities at the DAEC facility was
characterized by safety-conscious operations. Specifically, we observed an event-free
downpower for routine surveillance test activities. In addition, we noted pro-active preparations
for potential flooding from the Cedar River.
However, based on the results of this inspection, the NRC has determined that a violation of
NRC requirements occurred. The violation was for failure to log entry into a Technical
Specification limiting condition for operation when power was lost to the drywell sump pump
level switches. This violation is being treated as Non-Cited Violation (NCV), consistent with
Appendix C of the Enforcement Policy. This NCV is described in the subject inspection report.
If you contest the violation or severity level of this NCV, you should provide a response within
30 days of the date of this inspection report, with the basis for your denial, to the Nuclear
Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001, with
copies to the Regional Administrator, Region 111, and the Director, Office of Enforcement, United
States Nuclear Regulatory Commission, Washington, DC 20555-0001.
1
1
9908310072 990826
ADOCK 05000331
e
II
e
!
O
. .
I
l
J. Franz
-2-
l
i
'
in accordance with 10 CFR Part 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosure, and your response, if you choose to provide one, will be placed in the NRC Public
Document Room.
Sincerely,
/s/ M. N. Idach
Melvyn N. Leach, Chief
Reactor Projects Branch 2
Docket No. 50-331
License No. DPR-49
l
Enclosure:
Inspection Report 50-331/99009(DRP)
l
cc w/ encl:
E. Protsch, Executive Vice President -
Energy Delivery, Alliant;
President, IES Utilities, Inc.
l
G. Van Middlesworth, Plant Manager
K. Peveler, Manager, Regulatory Performance
l
State Liaison Officer
!
Chairperson, Iowa Utilities Board
l
i
!
!
!
i
'
l
t
DOCUMENT NAME: G:\\DUAN\\DUA99009DRP.WPD
v.
.
.,
-e,.wec
or.c
w.oorw.,
OFFICE
Rlll
M
Rlli
NAME
Prescott/coM
Leach N d e
DATE
08/M/99
08/24/99
- pGM
. OFFICIAL RECORD COPY
,
- . -
e
.
,
' J. Franz
-3-
Distribution:
RPC (E-Mail)
BLM (Project Mgr.) (E-Mail)
. J. Caldwell, Rlli w/ encl
B. Clayton, Rill w/enci
SRI Duane Amold w/enci
DRP w/ encl
DRS w/enci
Rlli PRR w/enci
PUBLIC IE-01 w/enci
Docket File w/enci
GREENS
LEO (E-Mail)
DOCDESK (E-Mail)
.
(
0 -
&
c_.'~
\\
\\
.