ML20211F783

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-331/99-09 on 990708-0819.Violation Re Failure to Log Entry Into TS Limiting Condition for Operation When Power Lost to Drywell Sump Pump Level Switches,Noted & Being Treated as NCV
ML20211F783
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 08/26/1999
From: Leach M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Franz J
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
Shared Package
ML20211F789 List:
References
50-331-99-09, NUDOCS 9908310072
Download: ML20211F783 (3)


See also: IR 05000331/1999009

Text

!

..

UNITED STATES

.#pa et49'o NUCLEAR REGULATORY COMMISSION

g

[ o REGION til

g ,g 801 WARRENVILLE ROAD

g,4***j August 26,1999

Mr. John F. Franz, Jr.

Vice President, Nuclear

Alliant Tower 4

200 First Street SE

P. O. Box 351

Cedar Rapids, lA 52406-0351

SUBJECT: DUANE ARNOLD INSPECTION REPORT 50-331/99009(DRP)

Dear Mr. Franz:

This refers to the inspection conducted on July 8 through August 19,1999, at the Duane Arnold

Energy Center (DAEC) facility. The NRC conducted a routine safety inspection. The enclosed

report presents the results of this inspection.

During this 6-week inspection period, your conduct of activities at the DAEC facility was

characterized by safety-conscious operations. Specifically, we observed an event-free

downpower for routine surveillance test activities. In addition, we noted pro-active preparations

for potential flooding from the Cedar River.

However, based on the results of this inspection, the NRC has determined that a violation of

NRC requirements occurred. The violation was for failure to log entry into a Technical

Specification limiting condition for operation when power was lost to the drywell sump pump

level switches. This violation is being treated as Non-Cited Violation (NCV), consistent with

Appendix C of the Enforcement Policy. This NCV is described in the subject inspection report.

If you contest the violation or severity level of this NCV, you should provide a response within

30 days of the date of this inspection report, with the basis for your denial, to the Nuclear

Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001, with

copies to the Regional Administrator, Region 111, and the Director, Office of Enforcement, United

States Nuclear Regulatory Commission, Washington, DC 20555-0001.

1

1

I

l

9908310072 990826

PDR ADOCK 05000331

e PDR

II e

!

.

O .

I

l J. Franz -2-

i l

'

in accordance with 10 CFR Part 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosure, and your response, if you choose to provide one, will be placed in the NRC Public

Document Room.

Sincerely,

/s/ M. N. Idach

Melvyn N. Leach, Chief

Reactor Projects Branch 2

Docket No. 50-331

License No. DPR-49

l

Enclosure: Inspection Report 50-331/99009(DRP)

l

cc w/ encl: E. Protsch, Executive Vice President -

Energy Delivery, Alliant;

President, IES Utilities, Inc.

l G. Van Middlesworth, Plant Manager

K. Peveler, Manager, Regulatory Performance

l State Liaison Officer

! Chairperson, Iowa Utilities Board

l

i

!

!

!

!

!

!

i

'

l

l

t

DOCUMENT NAME: G:\DUAN\DUA99009DRP.WPD

v. . ., -e,.wec or.c w.oorw.,

OFFICE Rlll M Rlli #

NAME Prescott/coM Leach N d e

DATE 08/M/99 08/24/99

  • pGM . OFFICIAL RECORD COPY ,

- . -

e

.

,

' J. Franz -3-

Distribution:

RPC (E-Mail)

BLM (Project Mgr.) (E-Mail)

. J. Caldwell, Rlli w/ encl

B. Clayton, Rill w/enci

SRI Duane Amold w/enci

DRP w/ encl

DRS w/enci

Rlli PRR w/enci

PUBLIC IE-01 w/enci

Docket File w/enci