ML20149G486
| ML20149G486 | |
| Person / Time | |
|---|---|
| Site: | Duane Arnold |
| Issue date: | 02/12/1988 |
| From: | Wright G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Denise Wilson IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT |
| References | |
| NUDOCS 8802180278 | |
| Download: ML20149G486 (1) | |
Text
_. -
FEB 12 M88 Docket No. 50-331 Iowa. Electric. Light and Power Company ATTN: Mr. David L. Wilson Training Superintendent 3363 DAEC Road Palo, IA 52324 Gentlemen:
In anticipation of the resumption of requalification testing later this year I felt that it might be helpful to you to have a copy of the pilot requalification exam given at H. B. Robinson.
You will note that the style of the questions is considerably different than in the past as they are intended to be open book type questions. As I indicated at the last MNTA meeting, the responsibility for generating the questions now rests with each utility. Estimates of the time necessary to assemble the H. B.
Robinson exam ranged from 35 to 45 person weeks (NRC plus utility). Given this level of resource expenditure I encourage you to begin reviewing your programs and manpower commitments, to accommodate the effort necessary to generate appropriate questions for use on upcoming requalification exams.
If you have any questions please contact either myself (312/790-5695) or T.Burdick(312/790-5566).
Sincerely, OitlGlHAL SIGNED BY. GE0ffREY C. WRIGNI Geoffrey C. Wright, Chief l
Operations Branch
Enclosures:
1.
H. G. Robinson Requalification Exam 2.
Sample Exam cc w/ enclosures:
Resident Inspector, RIII cc w/o enclosures:
Lee Liu, President and Chief R. Hannen, Plant Superintendent - Nuclear R. Salmon, Technical Services Superintendent DCD/DCB (RIDS)
Licensing Fee Management Branch Thomas Houvenagle, Iowa State Comerce Comission RIII 8802100278 880212 PDR ADOCK 05000331 h /mc V
PDR f
---