Forwards Insp Rept 50-331/99-04 on 990414-0525.One Violation of NRC Requirements Identified Involving Inadequate Testing of Standby Liquid Control Sys Valves & Being Treated as non-cited Violation
ML20195F218
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 06/09/1999
From: Leach M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Franz J
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
Shared Package
ML20195F222 List:
References
50-331-99-04, 50-331-99-4, NUDOCS 9906140226
Download: ML20195F218 (3)


See also: IR 05000331/1999004

Text

.

4

ps razog%

UNITED STATES

4

NUCLEAR REGULATORY COMMISSION

[

$

REGION lli

5

y

801 WARRENVILLE ROAD

,

e

LISLE. ILLINotS 605324351

tg***** ,o

June 9,1999

Mr. John F. Franz, Jr.

Vice President, Nuclear

Alliant Tower

200 First Street S.E.

P. O. Box 351

Cedar Rapids, lA 52406-0351

SUBJECT:

DUANE ARNOLD INSPECTION REPORT 50-331/99004(DRP)

Dear Mr. Franz:

This refers to the routine safety inspection conducted on April 14 through May 25,1999, at the

Duane Arnold Energy Center (DAEC) facility. The purpose of the inspection was to determine

l

whether activities authorized by the license were conducted safely and in accordance with NRC

requirements. At the conclusion of the inspection, the findings were discussed with those

members of your staff identified in the enclosed report.

During this 6-week inspection period, your conduct of activities at the DAEC facility was

j

characterized by safety-conscious operations. Specifically, we observe <l control room operators

perform an error-free shutdown to allow repair of an intermittent main generator field ground

alarm. In addition, we observed your maintenance and engineering staffs affectively identify

and repair the ground alarm.

j

However, based on the results of this inspection, the NRC has determined that a violation of

'

'

NRC requirements occurred involving inadequate testing of standby liquid control system

l

valves. The violation is being treated as a Non-Cited Violation (NCV), consistent with

Appendix C of the Enforcement Policy. - The NCV is described in the subject inspection report.

If you contest the violation or severity level of the NCV you should provide a response within

30 days of the date of this inspection report, with the basis for your denial, to the Nuclear

Regulatory Commission. ATTN: Document Control Desk, Washington, D.C. 20555-0001, with

.

copies to the Regional Administrator, Region Ill, and the Director, Office of Enforcement, United

l

States Nuclear Regulatory Commission, Washington, D.C. 20555-0001.

l

l

l

9906140226 990609

PDR

ADOCK 05000331

PDR

0

.

o

..

. ..

J. Franz, Jr.

-2-

In accordance with 10 CFR Part 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosure and your response (if you choose to provide one) will be placed in the NRC Public

Document Room.

Sincerely,

/s/ M. N. Leach

Melvyn N. Leach, Chief

Reactor Projects Branch 2

q

Docket No. 50-331

License No. DPR-49

Enclosure:

Inspection Report 50-331/99004(DRP)

cc w/ encl:

E. Protsch, Executive Vice President,

Energy Delivery Alliant

President, IES Utilities, Inc.

G. Van Middlesworth, Plant Manager

K. Peveler, Manager, Regulatory Performance

State Liaison Officer

,

Chairperson, Iowa Utilities Board

I

Distribution:

RPC (E-Mail)

Project Mgr., NRR w/enci

I

J. Caldwell, Rlli w/enct

B. Clayton, Rlli w/encI

SRI Duane Arnold w/ encl

DRP w/ enc!

DRS w/ enc!

Rlli PRR w/enct

PUBLIC IE-01 w/enci

Docket File w/enci

j

GREENS

LEO (E-Mail)

j

DOCDESK (E-Mail)

j fj d ( 6

DOCUMENT NAME: G:\\DUAN\\DUA99004.DRP

  • See previous concurrences

To receive a copy of this document, Indicate In the box:"C" = Copy without enclosure "E's Copy with enclosure"N*s No copy

OFFICE

  • Rlli

Rlli

l

l

NAME

Jackiw/djp

Leach # 4 /J.

DATE

06/07/99

06/09/99

i

OFFICIAL RECORD COPY

<

.

.

,

,

, .

J. Franz, Jr.

-2-

In accordance with 10 CFR Part 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosure and your response (if you chdose to provide one) will be placed in the NRC Public

Document Room

Sincerely,

/s/ I. N. Jackiw for

Melvyn N. Leach, Chief

Reactor Projects Branch 2

Docket No. 50-331

License No. DPR-49

Enclosure:

Inspection Report 50-331/99004(DRP)

cc w/ encl:

E. Protsch, Executive Vice President,

Energy Delivery Alliant

President, IES Utilities, Inc.

G. Van Middlesworth, Plant Manager

K. Peveler, Manager, Regulatory Performance

State Liaison Officer

Chairperson, Iowa Utilities Board

Distribution:

RPC (E-Mail)

'

Project Mgr., NRR w/enci

J. Caldwell, Rlli w/enct

B. Clayton, Rlli w/enct

SRI Duane Arnold w/encI

DRP w/ encl

DRS w/ encl

Rlli PRR w/ encl

PUBLIC IE-01 w/ encl

Docket File w/enci

GREENS

LEO (E-Mail)

DOCDESK (E-Mail)

DOCUMENT NAME: G:\\DUAN\\DUA99004.DRP

To receive a copy of this document, Indicate in the box:"C" = Copy without enclosure "E"= Copy with enclosure"N"= No copy

OFFICE

Rlil

l4 Rill

6

l

l

NAME

Jackiw/chgr4t9

Leact/' M f)

DATE

06/c)/99

/

06/c7/99 '

/

'

OFFICIAL RECORD COPY

1