p May 13,.1999 Mr. Eliot Protsch President IES Utilities Inc.
200 First Street, SE P.O. Box 351 Cedar Rapids, IA 52406-0351 l
SUBJECT:
SAFETY EVALUATION FOR RESPONSE TO GENERIC LETTER 95-07,
" PRESSURE LOCKING AND THERMAL BINDING OF SAFETY-RELATED POWER-OPERATED GATE VALVES," DUANE ARNOLD ENERGY CENTER (TAC NO. M93460)
Dear Mr. Protsch:
On August 17,1995, the U.S. Nuclear Regulatory Commission (NRC) issued Generic Letter
-(GL) 95-07, " Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves," to request that licensees take actions to ensure those safety-related power-operated
' gate valves that are susceptible to pressure locking or thermal binding are capable of performing their safety functions, in a letter of February 13,1996, IES Utilities submitted its 180-day response to GL 95-07 for
)
Duane Arnold Energy Center. The NRC staff reviewed the licensee's submittal and requested
. additional information in a letter dated May 31,1996. In a letter of July 3,1996, the licensee provided the additional information. In a letter dated November 20,1G98, the licensee supplemented its 180-day response. The NRC staff requested additional information in a letter dated April 1,1999, and the licensee provided the additional information in a letter dated April 28,1999.
The NRC staff has reviewed the licensee's submittals and finds that the licensee has adequately addressed the actions requested in GL 95-07, as discussed in the enclosed safety evaluation.
f j
This completes our efforts on TAC No. M93460, if you have any questions regarding this issue, please contact me at 301-415-2020.
\\
Sincerely, en ry Originalsigned by:
'gg hh,mr, bT I
Brenda L. Mozafari, Project Manager, Section 1 Project Directorate Ill.
Division of Licensing Project Management f[
- Office of Nuclear Reactor Regulation hIO/
Docket No. 50-331 D_istribution:
Enclosure:
As stated Docket File PUBLIC PD3-1 r/f i
RCN (SE only)
ACRS OGC cc:' See next page DTerao' STingen GGrant, Rlli DOCUMENT NAME: G:kPD3-3\\DUANEARN\\GL9507CL.wpd OFFICE PM:LPD3. a A1.A:LPD3 E
(A)SC:LPD3 8
NAME BMozafariW EBarnhillOW GDick DATE 5 /l$/99 5 //v/99 i '
5/ G /99 -
OFFICIAL RECORD COPY 99051900549905b' s
PDR ADOCK 05000331 P
PDR p
r
Mr. Eliot Protsch President k-lES Utilities Inc.
200 First Street, SE P.O. Box 351 Cedar Rapids, IA 52406-0351
SUBJECT:
. SAFETY EVALUATION FOR RESPONSE TO GENERIC LETTER 95-07,
" PRESSURE LOCKING AND THERMAL BINDING OF SAFETY-RELATED POWER-OPERATED GATE VALVES," DUANE ARNOLD ENERGY CENTER (TAC NO. M93460)
Dear Mr. Protsch:
On August 17,1995, the U.S. Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 95-07," Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves," to request that licensees take actions to ensure those safety-related power-operated gate valves that are susceptible to pressure locking or thermal binding are capable of performing _
their safety functions.
In a letter of February 13,1996, lES Utilities submitted its 180-dey response to GL 95-07 for Duane Amold Energy Center. The NRC staff reviewed the licensee's submittal and requested additional information in a letter dated May 31,1996. In a letter of July 3,1996, the licensee provided the additional information in a "NG-98-1927, Forwards Response to NRC 980923 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of SR Movs. List of Seventeen Valves Previously Removed from [[generic letter" contains a listed "[" character as part of the property label and has therefore been classified as invalid. Scope,Also Encl|letter dated November 20,1998]], the licensee supplemented its 180-day response. The NRC staff requested additional information in a letter dated April 1,1999, and the licensee provided the additional information in a letter dated
~ April 28,1999.
- The NRC staff has reviewed the licensee's submittals and finds that the licensee has adequately addressed the actions requested in GL 95-07, as discussed in the enclosed safety evaluation.
This completes our efforts on TAC No. M93460. If you have any questions regarding this issue, please contact ma at 301-415-2020.
Sincerely, Originalsigned by:
Brenda L. Mozafari, Project Managsr, Section 1 Project Directorate lli Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50 331 Distnbution:
Enclosure:
As stated Docket File PUBLIC PD3-1 r/f RCN (SE only)
ACRS OGC cc: See next page DTerso STingen GGrant, Rlll DOCUMENT NAME: G:\\PD3-3\\DUANEARN\\GL9507CL.wpd OFFICE PM:LPD3 no alA:LPD3 6
(A)SC:LPD3 G,
NAME BMozafariW EBamhillOM GDick DATE 5 /l$/99 5 //v/99 5//3 /99 OFFICIAL RECORD COPY
o%g g
1 UNITED STATES g
g NUCLEAR HGGULATORY COMMISSION WASHINGTON, D.C.== aaai
(
- e.,+
May 13, 1999 Mr. Eliot Protsch President IES Utilities Inc.
l 200 First Street, SE i
P.O. Box 351 l
Cedar Rapids, IA 52406-0351
SUBJECT:
SAFET( EVALUATION FOR RESPONSE TO GENERIC LETTER 95-07,
" PRESSURE LOCKING AND THERMAL BINDING OF SAFETY-RELATED POWER-OPERATED GATE VALVES," DUANE ARNOLD ENERGY CENTER (TAC NO. M93460)
Dear Mr. Protsch:
On August 17,1995, the U.S. Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 95-07," Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves," to request that licensees take actions to ensure those safety-related power-operated gate valves that are susceptible to pressure locking or thermal binding are capable of performing their safety functions.
In a letter of February 13,1996, IES Utilities submitted its 180-day respcnse to GL 95-07 for Duane Arnold Energy Center. The NRC staff reviewed the licensee's submittal and requested additional information in a letter dated May 31,1996. In a letter of July 3,1996, the licensee provided the additional information. In a "NG-98-1927, Forwards Response to NRC 980923 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of SR Movs. List of Seventeen Valves Previously Removed from [[generic letter" contains a listed "[" character as part of the property label and has therefore been classified as invalid. Scope,Also Encl|letter dated November 20,1998]], the licensee supplemented its 180-day response. The NRC staff requested additionalinformation in a letter dated April 1,1999, and the licensea provided the additional information in a letter dated April 28,1999.
The NRC staff has reviewed the licensee's submittals and finds that the licensee has adequately j
addressed the actions requested in GL 95-07, as discussed in the enclosed safety evaluation.
This completes our efforts on TAC No. M93460. If you have any questions regarding this issue, please contact me at 301-41o-2020.
Sincerely,
~
/
Brenda L. Mozafari, Project M na er, Section 1 Project D'eectorate !Il j
Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-331
Enclosure:
As stated cc: See next page
(
Mr. Eliot Protsch Duane Arnold Energy Center
)
IES Utilities Inc.
cc:
Jack Newman, Esquire Al Gutterman, Esquire
' Mor0an, Lewis, & Bockius 1800 M Street, NW.
Washington, DC. 20036-5869 Chainnan, Linn County Board of Supervisors Cedar Rapids, IA 52406 i
lES Utilities Inc.
j ATTN: Gary Van Middlesworth Plant Superintendent, Nuclear 3277 DAEC Road Palo,lA 52324 John F. Franz, Jr.
l Vice President, b'.-%ar J
Duane Arnold E. r*gy Center 3277 DAEC Road Palo,IA 52324 i
Ken Peveler Manager of Regulatory Performance Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324 -
U.S. Nuclear Regulatory Commission Resid6nt inspector's Office.
Rural Route #1 Palo,IA 52324 Regional Administrator, Rill i
U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4531 Parween Baig-Utilities Division Iowa Department of Commerce Lucas Office Building,5th floor Des Moines,IA 5031g j