Informs That by ,Ies Utilities,Inc Provided Changes to QA Program in Ufsar,Rev 20 for Daec.Nrc Approval Not Required Prior to Implementation of Proposed Changes
ML20206G527
Person / Time
Site: Duane Arnold, 050331O  NextEra Energy icon.png
Issue date: 05/04/1999
From: Mozafari B
NRC (Affiliation Not Assigned)
To: Protsch E
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
References
TAC-MA4333, NUDOCS 9905100045
Download: ML20206G527 (4)


Text

s May 4, 1999.

Mr. Eliot Protsch

' President IES Utilities Inc.

200 First Street, SE

> P.O. Box 351 Cedar Rapids, lA 52406-0351

SUBJECT:

CHANGES TO THE QUALITY ASSURANCE PROGRAM IN THE UPDATED FINAL SAFETY ANALYSIS REPORT, REV. 20, FOR THE DUANE ARNOLD ENERGY CENTER (TAC NO. MA4333)

Dear Mr. Protsch:

By letter dated November 24,1998, IES Utilities Inc. provided changes to the Quality Assurance Program Description (QAPD) for the Duane Arnold Energy Center (DAEC). You indicated that

' the information was provided in accordance with the requirements of 10 CFR 50.54(a)(3);

however, you stated that none of the changes involved a reduction in commitment. Section 50.54(a)(3) states, in part, that "[c)hanges to the quality assurance program description that do

-not reduce the commitments must be submitted to the NRC in accordance with the requirements of (section] 50.71(e) " The NRC staff has compared your proposed changes to the DAEC QAPD with existing commitments and confirmed that the changes do not constitute a reduction in commitments. Pursuant to 10 CFR 50.54(a)(3), NRC approval is not required prior to implementation of the proposed changes. This completes our activity on TAC No MA4333.

If you have any questions regarding this issue, please contact me at 301-415-2020.

Sincerely .

Original signed by Brenda L. Mozafari, Project Manager, Section 1 Project Directorate 111 Division of Licensing Project Management Docket No. 50-331'

~

Enclosure:

As stated '

s cc w/ encl.: See next page ,

, DISTRIBUTION l f Docket File - -ACRS GGrant, Rlli MB PD3-1 Reading .

GC TQua hb DOCUMEri NAME: G:\PD3-3\DUANEARN\DA4333.wpd "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy OFFICE PM:PD31 n. C LA:PD31 CL SC:PD3M , n E NAME BMozafariR4kEBarnhill fM GDick Al4/ L F

DATE 4/7/99 $/ 3/99 & d3/99 OFFICIAL RECORD COPY 9905100045 99650% '

PDR ADOCK 05000331 P PDR ,

. l May 4, 1999 Mr. Eliot Protsch 1*g President IES Utilities Inc.

200 First Street, SE P.O. Box 351 Cedar Rapids, IA 52406-0351

SUBJECT:

CHANGES TO THE QUALITY ASSURANCE PROGRAM IN THE UPDATED FINAL SAFETY ANALYSIS REPORT, REV. 20, FOR THE DUANE ARNOLD ENERGY CENTER (TAC NO. MA4333)

Dear Mr. Protsch:

By letter dated November 24,1998, IES Utilities Inc. provided changes to the Quality Assurance Program Description (QAPD) for the Duane Arnold Energy Center (DAEC). You indicated that the information was provided in accordance with the requirements of 10 CFR 50.54(a)(3); l however, you stated that none of the changes involved a reduction in commitment. Section l 50.54(a)(3) states, in part, that "[c]hanges to the quality assurance program description that do not reduce the commitments must be submitted to the NRC in accordance with the requirements of (section) 50.71(e)." The NRC staff has compared your proposed changes to the DAEC QAPD with existing commitments and confirmed that the changes do not constitute a reduction in commitments. Pursuant to 10 CFR 50.54(a)(3), NRC approvalis not required prior to implementation of the proposed changes. This completes our activity on TAC No. MA4333.

If you have any questions regarding this issue, please contact me at 301-415-2020.

Sincerely Original signed by Brenda L. Mozafari, Project Manager, Section 1 Project Directorate lll l Division of Licensing Project Management I Office of Nuclear Reactor Regulation l Docket No. 50-331 l

Enclosure:

As stated cc w/ encl.: See next page DISTRIBUTION Docket File ACRS GGrant, Rill PUBLIC '~ DDorman JZwolinski MBugg OGC TQuay PD3-1 Reading DOCUMENT NAME: G:\PD3-3\DUANEARN\DA4333.wpd "C" = Copy without enclosures "E" = Copy with enclosures "N" =,Ngcopy OFFICE PM:PD31 n, _C. LA:PD31 (L SC:PD314 , n F NAME BMozafar'MEBarnhill 9/M GDick )$ 4/M_  ;

DATE 4/7/99 F (/ 3/99 f/ 0J/99 OFFICIAL RECORD COPY

i SM4 g p 1 UN'TED STATE 8 i_ g ) NUCLEAR REQuLATORY COMMISSION WASHINGTON, D.C. *anas anaq o

          • May 4. 1999 Mr. Eliot Protsch President -

IES Utilities Inc.

200 First Street, SE P.O. Box 351 ,

Cedar Rapids, IA 52406-0351

SUBJECT:

CHANGES TO THE QUALITY ASSURANCE PROGRAM IN THE UPDATED FINAL ,

SAFETY ANALYSIS REPORT, REV. 20, FOR THE DUANE ARNOLD ENERGY j CENTER (TAC NO. MA4333) l

Dear Mr. Protsch:

l By letter dated November 24,1998, IES Utilities Inc. provided changes to the Quality Assurance I Program Description (QAPD) for the Duane Arnold Energy Center (DAEC). You indicated that j the information was provided in accordance with the requirements of 10 CFR 50.54(a)(3); '

however, you stated that none of the changes involved a reduction in commitment. Section 50.54(a)(3) states, in part, that "(c]hanges to the quality assurance program description that do not reduce the commitments must be submitted to the NRC in accordance with the requirements of (section] 50.71(e)." The NRC staff has compared your proposed changes to the DAEC QAPD with existing commitments and confirmed that the changes do not constitute a reduction in commitments. Pursuant to 10 CFR 50.54(a)(3), NRC approval is not required prior to implementation of the proposed changes. This completes our activity on TAC No. MA4333.

If you have any questions regarding this issue, please contact me at 301-415-2020.

Sincerely l

Brenda L. Mozafari, Project Manager, Section 1 Project Directorate lil Division of Licensing Project Management Office of Nuclear Reactor Regulation '

Docket No. 50-331

Enclosure:

As stated cc w/ encl.: See next page

5 f' Mr. Eliot Protsch IES Utilities Inc.

Duane Arnold Energy Center cc:

Jack Newman, Esquire Al Gutterman, Esquire Morgan, Lewis, & Bockius 1800 M Street, NW.

Washington, DC 20036-5869 Chairman, Linn County Board of Supervisors Cedar Rapids,lA 52406 j

IES Utilities Inc.

ATTN: Gary Van Middlesworth Plant Superintendent, Nuclear 3277 DAEC Road Palo,IA 52324 John F. Franz, Jr.

Vice President, Nuclear  !

Duane Arnold Energy Center 3277 DAEC Road Palo,IA 52324 Ken Peveler Manager of Regulatory Performance Duane Arnold Energy Center 3277 DAEC Road Palo,lA 52324 U.S. Nuclear Regulatory Commission Resident inspector's Office Rural Route #1 ,

Palo,IA 52324 Regional Administrator, Rlli U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4531 Parween Baig Utilities Division Iowa Department of Commerce Lucas Office Building,5th floor Des Moines,IA 50319

-.. -- .