Text
L
,
.
August 17, 1999
,
t
i
Mr. John F. Franz, Jr.
. Vice President, Nuclear
Alliant Tower
200 First Street SE
P. O. Box 351
Cedar Rapids, IA;52406-0351
SUBJECT:
NRC EMERGENCY PREPAREDNESS INSPECTION REPORT
. 50-331/99010(DRS)
Dear Mr. Franz:
dn August 6,' 1999, the NRC completed an inspection at the Duane Amold Energy Center. The
enclosed report presents the results of that inspection. The inspection examined activities .
conducted under your emergency preparedness program. No violations of NRC requirements
were identified.
. Areas examined within your emergency preparedness program are identified in the report.
Within those areas, the inspection consisted of a selective examination of procedures and
representative records, interviews with personnel, and observation of activities in progress.
The objective of the inspection effort was to determine whether activities authorized by the
licenso were conducted safely and in accordance with NRC requirements.
During this inspechon our observation of your activities showed the emergency preparedness
program had been maintained in an effective state of operational readiness. In particular,
- emergency response facilities, equipment, and supplies were well-maintained. Management
support for the program continued to be a program strength. Emergency response personnel
were currently qualifitxf for their positions, and interviewed members demonstrated good
knowledge of their responsibilities and emergency procedures. Quality Assurance oversight of
the program was also very good.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and the
enclosed report will be placed in the NRC Public Document Room.
9908230059 990817
"i
.
ADOCK 05000331
G
pm
F
.
.
I
J. Franz
-2-
We will gladly discuss any questions you have conceming this inspection.
Sincerely,
Original /s/ G. L. Shear
Gary L. Shear, Chief
Plant Support Branch
Docket No. 50-331
License No. DPR-49
Enclosure:
Inspection Report 50-331/99010(DRS)
cc w/ encl:
E. Protsch, Executive Vice President -
Energy Delivery Alliant;
President, IES Utilities, Inc.
G. Van Middlesworth, Plant Manager
K. Peveler, Manager, Regulatory Performance
State Liaison Officer
!
Chairperson, Iowa Utilities Board
Distribution:
RPC (E-Mail)
Project Mgr., NRR w/ encl
J. Caldwell, Rlli w/enci
B. Clayton, Rlli w/ encl
SRI Duane Amold w/enci
DRP w/enci
DRS w/enci
Rlli PRR w/enci
PUBLIC IE-35 w/enci
Docket File w/ encl
i
i
'
GREENS
i
IEO (E-Mail)
i
DOCDESK (E-Mail)
DOCUMENT NAME: G:\\DRS\\DUA99010.WPD
v.
.,.,
.me,.we.com.a.c,mm
rc
.- -.r.=e.
OFFICE
Rill
6 R'll
4
Rlli
l#
l
NAME
DFunk:tb L)ff--
GShear 646
MLeach #4
DATE
8#9/99
8/g/99
8//719 9
OFFICIAL RECORD COPY
230019