Forwards Audit Rept on Y2K Contingency Planning Program at Duane Arnold Energy Center Conducted on 990615-16 as follow-up to NRC GL 98-01
ML20210B716
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 07/20/1999
From: Mozafari B
NRC (Affiliation Not Assigned)
To: Protsch E
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
Shared Package
ML20210B719 List:
References
GL-98-01, TAC-MA1834, NUDOCS 9907230211
Download: ML20210B716 (4)


Text

{{#Wiki_filter:' w. ;o - s July 20,.19h9.,

    -I' Mr. Eliot Protsch '                               .

e President en' /

                  . lES Utilities Inc.-
                   - 200 First Street, SE                                                  ,             ,

4 P.O. Box 351 J ' L Cedar Rapids, IA 52406,0351 , 4

SUBJECT:

~ AUDIT REPORT ON THE YEAR 2000 CONTINGENCY PLANNING PROGRAM, DUANE ARNOLD ENERGY CENTER (TAC .NO. MA1834)

Dear Mr. Protsch:

                  ' On' June 15-16,I 1999, the U.S. Nuclear' Regulatory Commission (NRC) staff conducted an audit of the Year 2000 (Y2K) c9ntingency planning program at the Duane Arnold Energy Center
                  ' (DAEC) as a follow-up to' NRC Generic Lettsr (GL) 98-01, " Year 2000 Readiness of Computer Systems at Nuclear Power Plants," issued on May 'li,1998, The enclosed report presents the results of the audit. The results of this audit and subsequent audit 3 of other selected nuclear power plants will be used by the NRC staff to determine the need for 6dditional action, if any, on Y2K readiness for nuclear power plants.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice,'. & copy of this letter and its enclosure will be placed in the NRC Public Document Room. Please feel free to contact me at -

                   ;301- 415-2020 if you have any questions or comments on the enclosed audit report.

I Sincerely, 1 Original. signed by: Brenda L. Mozafari, Project Manager, Section1 )

Project Diractorate ill Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket 'No. 50-331 l- i

Enclosure:

As stated . cc w/ encl: ' See next page'-

                 - DISTR:BUTION.

Docket File PUBLIC JCalvo '- PD3-1 Reading ' . GGrant, Rlli JZwolinski/SBlack

                  ' ABryant L                         OGC                         ACRS                                   ,

MGareri . DSpaulding CThomas/CCraig DOCUMENT NAME: G:\PD3-3\DUANEARN\MA1834hr.wpd

                     ~hO FGCE     PM:PD31 r j     E. LA:PD31
                                                              ~

E SC:PD}1 ,, E

                                                                                                                             ]

I}AME: BMozafaridMU EBrnhill 9]k CCraig(R 0 l

                 . JDATE:          7ti h t$ '       4 7 /JO/99                  7/OCy99

( o :, , OFFICIAL RECORD COPY j

                            , g ,,, .m M
                                                                                                                             )

l L. .

July 20, 1999 Mr. Eliot Protsch - j President ./ l IES Utilities Inc. 200 First Street, SE P.O. Box 351 1 Cedar Rapids, IA 52406-0351 , l

SUBJECT:

AUDIT REPORT ON THE YEAR 2000 CONTINGENCY PLANNING PROGRAM, DUANE ARNOLD ENERGY CENTER (TAC NO. MA1834)

Dear Mr. Protsch:

On June 15-16,1999, the U.S. Nuclear Regulatory Commission (NRC) staff conducted an audit of the Year 2000 (Y2K) contingency planning program at the Duane Amold Energy Center (DAEC) as a follow-up to NRC Generic Letter (GL) 98-01 " Year 2000 Readiness of Computer Systems at Nuclear Power Plants," issued on May 11,1996. The enclosed report presents the results of the audit. The results of this audit and subsequent iridits at other selected nuclear

,     power plants will be used by the NRC staff to determine the need for additional action, if any, on Y2K readiness for nuclear power plants.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its enclosure will be placed in the NRC Public Document Room. Please feel free to contact me at 301- 415-2020 if you have any questions or comments on the enclosed audit report. Sincerely, Original signed by: Brenda L. Mozafari, Project Manager, Section1 Project Directorate ill Division of Licensing Project Management Office of Nue! ear Reactor Regulation Docket No. 50-331 I

Enclosure:

As stated cc w/ encl: See next page DISTRIBUTION Docket File PUBLIC JCalvo  ! I PD3-1 Reading GGrant, Rlli JZwolinski/SBlack ABryant OGC ACR3 J MGareri USpaulding CThomas/CCraig DOCUMENT NAME: G:\PD3-3\DUANEARN\MA1834ftr.wpd OFFICE FM:PD31 nm E LA:PD31 m E SC:PDS1 , ,, E NAME BMozafarQFlU EBarnhill 9W CCraigQ$AC DATE 7/ M 9 ' 7 /)C/99 , 7/dCY99 OFFICIAL RECORD COPY c , 7,- ,

parary g & UNITED STATES

 ;r j

2 NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20086 000) b{**@4[ ***" July 20, 199 Mr. Eliot Protsch President IES Utilities Inc. 200 First Street, SE P.O. Box 351 - Cedar Rapids, IA 52406-0351 c.  ;

SUBJECT:

AUDIT REPORT ON THE YEAR 2000 CONTINGENCY PLANNING PROGRAM, DUANE ARNOLD ENERGY CENTER (TAC NO. MA1834) ,

Dear Mr. Protsch:

On June 15-16,1999, the U.S. Nuclear Regulatory Commission (NRC) staff conducted an audit of the Year 2000 (Y2K) contingency planning program at the Duane Amold Energy Center (DAEC) as a follow-up to NRC Generic Letter (GL) 98-01, " Year 2000 Readiness of Computer Systems at Nuclear Power Plants," issued on May 11,1998. The enclosed report presents the ( results of the audit. The results of this audit and subsequent audits at other selected nuclear power plants will be used by the NRC staff to determine the need for additional action, if any, on 4 Y2K readiness for nuclear power plants. 1 In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its  ;

                                                                                                            ~

enclosure will be placed in the NRC Public Document Room. Please feel free to contcot me at 301- 415-2020 if you have any questions or comments on the enclosed audit report. Sincerely, Brenda L. Mozafari, Proje banager, Section 1 Project Directorate 111 Division of Licensing Project Management Office of Nuclear Reactor Regulation

                                                                                                              ]

Docket No. 50-331

Enclosure:

As stated cc w/ encl: See next page

e-  : Mr. Eliot Protsch Duane Amold Energy Center IES Utilities Inc. cc: Jack Newman, Esquire Al Gutterman, Esquire Morgan, Lewis, & Bockius 1800 M Street, NW. Washington, DC 20036-5869 Chairman, Linn County Board of Superwors Cedar Rapids,IA 52406 . . IES Utilities Inc. ATTN: Gary Van Middlesworth Plant Superintendent, Nuclear 3277 DAEC Road Palo,IA 52324 1 l John F. Fran2., Jr. -{ Vice President, Nuclear i Duane Arnold Energy Center 3277 DAEC Road . Palo,IA 52324

                                                                          ~'

Ken Peveler Manager of Regulatory Performance Duane Arnold Energy Center 3277 DAEC Road Palo,lA 52324 U.S. Nuclear Regulatory Commission Resident inspector's Office Rural Route #1 Palo, IA 52324 - Regional Administrator, Rill . U.S. Nuc! ear Regulatory Commission j 801 Warrenville Road Lisle, IL 60532-4531

  . Daniel McGhee Utilities Division                                                      ;

lowa Department of Commercs  ! Lucas Office Building,5th floor Des Moines, IA 50319 1

                                              -                .~ -}}