Ack Receipt of ,Transmitting Rev 6 to Emergency Plan,Effective on 861121.Rev Unacceptable.Resubmittal of Rev 6 Requested,Including Previously Omitted Emergency Action Levels in Table D-2 of Section D
ML20212R678
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 01/21/1987
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Leslie Liu
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
References
NUDOCS 8702030040
Download: ML20212R678 (2)


Text

- .

Y

-h 4 J A N 21 1987.

Docket No. 50-331 Iowa Electric Light and Power Company ATTN: Mr. Lee Liu President and Chief Executive Officer IE Towers P.O. Box 351 Cedar Rapids, IA 52406 Gentlemen:

This is to acknowledge receipt of a letter dated November 25, 1986, which transmitted the Revision 6 to the Duane Arnold Energy Center (DAEC) Emergency Plan, effective as of November 21, 1986. This revision was received in our office on December 9, 1986.

We have completed our review of Revision 6 to the DAEC Emergency Plan and have concluded that one of the changes made from the previous Revision 5 was unacceptable. The Emergency Action Levels (EALs) in Table D-2 of Section D of the plan have been omitted from Revision 6. This omission decreases the effectiveness of the plan. A licensee's emergency plan should include a standard emergency classification and action level scheme, the bases of which include facility system and effluent This is a planning standard stipulated in 10 CFR Part 50.47(b)(4) parameters. .

This omission has been discussed with the Manager, Nuclear Licensing and Emergency Planning, and with your Emergency Planning, Coordinator during the recent inspection of January 5-9, 1987. An informal agreement between Mr. James P. Patterson of my staff and your two representatives has been made, that Revision 6 to DAEC Emergency Plan will be reissued and sent to Region III for review within 60 days of the date of this letter.

In addition to the EAL tables, some other items of concern in the plan were addressed in Inspection Report No. 50-331/87003 as a result of the January 5-9, 1987 inspection. If these minor plan changes are made as a result of the i

inspection, as indicated by the Emergency Planning Coordinator, we will have no further questions.

A correction is needed on Page H-7, Section 2.6.3.b., Containment Instrumenta-tion, as observed in our plan review, namely; "Drywell to Torus P" and " Torus to Rx Building P" should be changed to add AP to each of these containment instrumentation items as previously identified in Revision 5 to the plan.

/

/

s 8702030040 B70121 PDR F ADOCK 05000331 pgg

l l

Iowa Electric Light and Power 2 JAN21Jgg-Company Please be reminded that 10 CFR 50.54(q) requires NRC approval of any changes to your plan which may decrease the effectiveness of the plan. However, ,

if your safety review indicates no decrease in emergency preparedness l effectiveness, then changes can be made without prior NRC approval. In all cases, you must furnish copies of each proposed change to the NRC in accordance with 10 CFR 50.54(q). Also, any changes to the Emergency Plan Implementing Procedures should be made in accordance with the requirements of 10 CFR Part 50, Appendix E, Section V (Implementing Procedures).

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter will be placed in the NRC's Public Document Room.

Should you have any questions regarding this letter, please contact Mr. James P. Patterson of my staff at (312) 790-5536.

Sincerely, Yb J

W. D. Shafer, Chief lm Emergency Preparedness and Radiological Protection Branch cc: D. Mineck, Plant Superintendent Nuclear W. Miller, Assistant Plant Superintendent Technical Support DCS/RSB (RIDS)

Licensing Fee Management Branch Resident Inspector, RIII Thomas Houvenagle, Iowa State Commerce Commission D. Matthews, EPB, OIE R. Bissell FEMA, Region VII RIII ' RI I RI RIII gII gG / #W Patt son /mnj }Sm . h Snell W/ck w Shaerf JL