NG-99-1378, Clarifies TS Change Requests for Revised Safety Limit Min Critical Power Ratio.Approval of 990510 & 0716 Application for Amends to License DPR-49 Requested Prior to Scheduled Start of Cycle 17 & Effective Date No Earlier than 991022

From kanterella
Jump to navigation Jump to search
Clarifies TS Change Requests for Revised Safety Limit Min Critical Power Ratio.Approval of 990510 & 0716 Application for Amends to License DPR-49 Requested Prior to Scheduled Start of Cycle 17 & Effective Date No Earlier than 991022
ML20217B105
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 10/04/1999
From: Peveler K
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
To:
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NG-99-1378, NUDOCS 9910120159
Download: ML20217B105 (2)


Text

h.

m, r ALUANT ENERGY- its utiiities ine.

Duane Arnold Energy Center

' October 4,1999 3277 DAEC Road Palo,IA 52324 9785 Office:319.851.7611 Fax: 319.851.7986 Office of Nuclear Reactor Regulation want-energy. corn U.S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station 0-Pl-17 Washington, DC 20555-0001

Subject:

. Duane Arnold Energy Center (DAEC)

Docket No: 50-331' Op. License No: DPR-49 Clarification of Technical Specification Change Requests for

" Revised Safety Limit Minimum Critical Power Ratio" 1

References:

1) Letter NG-99-0678, dated May 10,1999, Franz (IES) to NRC, TSCR-021: " Revised Safety Limit Minimum Critical Power Ratio"
2) Letter NG-99-0956, dated July 16,1999, Franz (IES) to NRC, i TSCR-021 A: " Revised Safety Limit Minimum Critical Power Ratio" File: A-117

Dear Sir (s):

i The above Reference 1 letter submitted a Technical Specification Change Request to revise the Safety Limit Minimum Critical Power Ratio (SLMCPR) for DAEC to accommodate the use of GE-12 fuel in Cycle 17, scheduled to begin in November 1999. In that letter, we stated that the analysis discussed in that letter was dependent on the final core loading pattern and that if the SLMCPR numerical values changed as a result of the analysis with the confirmed final core loading pattern, we would update the submittal. ,

U The Reference 2 letter updated the Reference I submittal because the SLMCPR values did change as a result of the analysis with the confirmed final core loading pattern. This was not a new Technical Specification Change Request,just an update. For the convenience of the Db\

NRC reviewers, all of the necessary information in the first letter was repeated in the second letter, along with the updated information. We did this so the reviewers would have the complete updated submittal in one document. The only changes were the updated SLMCPR numerical values and the General Electric attachment regarding the updated analysis.

We request approval of this application as soon as possible to ensure implementation prior to the ' scheduled start of Cycle 17. We also request that the effective date be no earlier than the date of shutdown for the Cycle 16/17 refuel outage, currently scheduled for October 22, 1999, to avoid unnecessary conflicts with the current cycle's (i.e., Cycle 16) operating limits.

^

'9910120159.991004 :

PDR ADOCK 05000331 P. PDR: .

p j

,- ' NG 99-1378 -

e, October 4,1999 Page 2 '

! Should you have any questions regarding this matter, please contact this office.

Sincerely, .

// Mb M' l

Kenneth E. Peveler

-Manager, Regulatory Performance JDK/jdk.

cc: J. Kerr E. Protsch

D. Wilson K. Putnam B. Mozafari (NRC-NRR)

J. Dyer (Region III)

P. Baig (State ofIowa)

NRC Resident Office Docu CTS Project -