ML20154P736

From kanterella
Jump to navigation Jump to search
Requests That Util Initiate Investigation in Order to Fully Analyze Allegation Involving Individuals Working at Plant & to Determine If Allegation Substantiated or Not.Encl Withheld (Ref 10CFR2.790)
ML20154P736
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 09/28/1988
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Leslie Liu
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
References
NUDOCS 8810030165
Download: ML20154P736 (2)


Text

\

k a 9 f "r SEP 2 81989 Docket No. 50-331 Iowa Electric Light and Power ,

Company  !

ATTN: Mr. Lee Liu t President and Chief Executive Officer IE Towers P. O. Box 351 Cedar Rapids, IA 52406 Gentlemen:

NRC Region III recently received an allegation involving two individuals who work at the Duane Arnold Nuclear Power Plant. The enclosure to this letter describes the allegation received, and the identity of the persons allegedly involved. This "Fitness for Duty" issue was given to Ms. Diane Englehart of .

your staff on September 8,1988.

We reauest that you initiate an investigation in order to fully analyze the alleg. 1 and determine if the allegation is substantiated or not; determine if tL as any impact on safety related equipment; and review the quality of  ;

work performed by the individuals identified in the enclosure to this letter.

We also request that a written report of the results of your review and the disposition of this matter be provided to us within 30 days of receipt of this letter.

The enclosure to this letter should be strictly controlled and distribution  ;

limited to personnel with a "need-to-know." The enclosure to this letter is  !

considered as Exempt From Public Disclosure in accordance with Title 10, Code ,

of Federal Regulations, Part 2.790(d). A copy of this letter, excluding the l enclosure, will be placed in the Public Document Room as required by f 10 CFR 2.790, r The response directed by this letter is not subject to the clearance procedure of the Office of Management and Budget as required by the Paperwork Reduction  ;

Act of 1980, PL 96-511.

0 f6 1 8010030165 000920 PDR ADOCK 05000331 G PNU ENCLOSUP2 CONTAINS 10CFR2. 790 INF0EMATION UPON SEPARATION THIS PAGF IS DE60NTROLLED I

~

!{,, ,

SEP 2 81993 Iowa Electric Light and Power 2 Company Your cooperation with us is appreciated. Should you have any questions regarding this matter, please contact me or Mr. James R. Creed of my staff (312)790-5643.

l Sincerely, ORIGINAL Slggg M C. E. MM Charles E. Norelius, Director

< Division of Radiation Safety and Safeguards

Enclosure:

Summary of Allegation (10 CFR 2.790 INFORMATION) cc w/ enclosure:

R. Hannen, Plant '

Superintendent - Nuclear NRR/DRIS/SGB l NRR/DRIS/S1B i NRR/DLPQ/PEB Resident Inspector, RIII

cc w/o enclosure:
R. Salmon, Technical Services

! Superintendent l DCD/DCB (RIDS) i Licensing Fee Management Branch l John A. Eure, Iowa Department of Public Health EIS Coordinator, USEPA Region 5 Office 1

'W fl5 RI 1 pil RIII ei ENCLOSURE CONTAINS Cw Ill 10cFR2,790 INFORMATION iceb/mb 1

ed

(

eg y.

M 1 ett g ye< ,1 g UPON SEPARATION THIS gq ACE IS DE70!iTROLLED gg

,