Letter Sequence Other |
---|
|
|
MONTHYEARML20205D5201999-03-31031 March 1999 Requests Addl Info on GL 95-07, Pressure-Locking & Thermal- Binding of Safety-Related Power-Operated Gate Valves, Per Util 960213 Response.Response Should Provide Addl Info as Identified in Encl within 30 Days of Ltr Date Project stage: Other ML20205G2541999-04-0101 April 1999 Forwards RAI Re GL 95-07, Pressure-Locking & Thermal- Binding of Safety-Related Power-Operated Gate Valves. Response Requested within 30 Days from Date of Ltr Project stage: RAI ML20206N7491999-05-13013 May 1999 Forwards Safety Evaluation Accepting Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves Project stage: Approval 1999-04-01
[Table View] |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217N5521999-10-21021 October 1999 Forwards Operator Licensing Exam Rept 50-331/99-302(OL) for Tests Administered During Wk of 990920.Six Applicants Passed All Sections of Exam & Were Issued Operating Licenses ML20217H8921999-10-18018 October 1999 Forwards SER Accepting Eight of Licensee Relief Requests, NDE-R001,(Part a & B),NDE-R027,NDE-R028,NDE-R029,NDE-R030, NDE-R032 & NDE-R035,one Request Relief NDE-R036,denied & Relief Request NDE-R034 Unnecessary ML20217F4801999-10-14014 October 1999 Provides Individual Exam Results for Applicants Who Took Sept 1999 Initial License Exam.Informs That Info Considered Proprietary & That Listed Info,Supplements & Exam Rept Will Be Issued Shortly NG-99-1405, Informs That Util Has Completed Addl Review to Ensure That All Related Requirements for Repair/Replacements Have Been Addressed,Per Util Requesting Approval of Several Inservice Insp Relief Request1999-10-0808 October 1999 Informs That Util Has Completed Addl Review to Ensure That All Related Requirements for Repair/Replacements Have Been Addressed,Per Util Requesting Approval of Several Inservice Insp Relief Request NG-99-1383, Forwards Response to NRC 990930 RAI on TS Change Request TSCR-010 Re Excess Flow Check Valve SRs1999-10-0808 October 1999 Forwards Response to NRC 990930 RAI on TS Change Request TSCR-010 Re Excess Flow Check Valve SRs ML20217F7221999-10-0707 October 1999 Forwards Insp Rept 50-331/99-11 on 990820-0930.No Violations Noted ML20212L0411999-10-0505 October 1999 Informs That Privacy Info Identified in Util Re Duane Arnold Energy Center Emergency Telephone Book,Rev 61 Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(a)(6) & Section 103(b) of Atomic Energy Act NG-99-1358, Forwards DAEC plant-specific Response to 990927 RAI Re TS Change Request on Excess Flow Check Valve Surveillance requirements.TSTF-334,included1999-10-0505 October 1999 Forwards DAEC plant-specific Response to 990927 RAI Re TS Change Request on Excess Flow Check Valve Surveillance requirements.TSTF-334,included NG-99-1378, Clarifies TS Change Requests for Revised Safety Limit Min Critical Power Ratio.Approval of 990510 & 0716 Application for Amends to License DPR-49 Requested Prior to Scheduled Start of Cycle 17 & Effective Date No Earlier than 9910221999-10-0404 October 1999 Clarifies TS Change Requests for Revised Safety Limit Min Critical Power Ratio.Approval of 990510 & 0716 Application for Amends to License DPR-49 Requested Prior to Scheduled Start of Cycle 17 & Effective Date No Earlier than 991022 NG-99-1327, Forwards IST Relief Request VR-24 Re Excess Flow Check Valve Test Frequency,Per 10CFR50.55a(a)(3)(i),for NRC Approval1999-10-0404 October 1999 Forwards IST Relief Request VR-24 Re Excess Flow Check Valve Test Frequency,Per 10CFR50.55a(a)(3)(i),for NRC Approval ML20212J8761999-09-30030 September 1999 Forwards RAI Re Util 990412 Request to Revise Duane Arnold Energy Ctr TS SR 3.6.1.3.7 to Allow Representative Sample of Reactor Instrumentation Line EFCV to Be Tested Every 24 Months,Instead of Testing Each EFCV Every 24 Months ML20217A9331999-09-30030 September 1999 Informs That NRC Plan to Conduct Addl Insp by Resident Inspectors Beyond Core Insp Program Over Next 7 Months to Assess Preparation for Implementation of Refuel Outage Activities.Historical Listing of Plant Issues Encl ML20212H2121999-09-27027 September 1999 Forwards Request for Addl Info Re 990412 Licensee Request to Revise DAEC TS SR 3.6.1.3.7 to Allow Representative Sample of Reactor Instrumentation Line EFCV to Be Tested Every 24 Months,Instead of Testing Each EFCV Every 24 Months ML20212H2151999-09-22022 September 1999 Forwards Amend 228 to License DPR-49 & Safety Evaluation. Amend Revises DAEC TS SR 3.4.3.1, Safety/Relief Valves & Safety Valves NG-99-1262, Forwards License Renewal Application for G Thullen,License SOP 30232-2.Thullen Has Completed Requalification Program for Daec.Encls Withheld,Per 10CFR2.790(a)(6)1999-09-20020 September 1999 Forwards License Renewal Application for G Thullen,License SOP 30232-2.Thullen Has Completed Requalification Program for Daec.Encls Withheld,Per 10CFR2.790(a)(6) NG-99-1214, Forwards Voluntary Info Requested in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Re Estimated Number of Operator Licensing Exams & Applicants for Years 2000 Through 20031999-09-15015 September 1999 Forwards Voluntary Info Requested in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Re Estimated Number of Operator Licensing Exams & Applicants for Years 2000 Through 2003 NG-99-1278, Forwards Corrected TS Page 3.3-52 Re TS Change Request TSCR-003,removing Requirements for Hpcis & Rcics Isolation Manual Initiation Instrumentation.Page Indicates Deletion of Condition G as Well as or G from Condition H1999-09-15015 September 1999 Forwards Corrected TS Page 3.3-52 Re TS Change Request TSCR-003,removing Requirements for Hpcis & Rcics Isolation Manual Initiation Instrumentation.Page Indicates Deletion of Condition G as Well as or G from Condition H ML20212A8711999-09-14014 September 1999 Informs That 990716 Application Which Submitted Affidavit & Attachment Re Addl Info Re Cycle Specific SLMCPR for Plant Cycle 17, June 1999,marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) NG-99-1249, Requests Exemption from Certain Requirements Applicable to ECCS Evaluation Models Performed IAW App K to 10CFR50 for DAEC1999-09-10010 September 1999 Requests Exemption from Certain Requirements Applicable to ECCS Evaluation Models Performed IAW App K to 10CFR50 for DAEC NG-99-1252, Informs That There Is No Longer Need for Any Waiver Associated with Senior Operator License Application for MR Pettengill Due to Completion of All Five Manipulations1999-09-0909 September 1999 Informs That There Is No Longer Need for Any Waiver Associated with Senior Operator License Application for MR Pettengill Due to Completion of All Five Manipulations NG-99-1192, Forwards marked-up Copies of Affected Tables & Ref Matl Which Supports Changes Re DAEC Reactor Vessel Integrity Database (Rvid),As Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity1999-09-0808 September 1999 Forwards marked-up Copies of Affected Tables & Ref Matl Which Supports Changes Re DAEC Reactor Vessel Integrity Database (Rvid),As Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20211M5621999-09-0202 September 1999 Forwards Insp Rept 50-331/99-08 on 990712-16 & 0810-12.No Violations Noted.Insp Consisted of Review of Source Term Reduction & Integration of ALARA Into Work Planning & Execution,Calibration & Maint NG-99-1216, Requests Waiver to Allow MR Pettengill to Participate in Upcoming Senior Operator Examination on 990920.Util Intends to Ensure That Pettengill Completes All Five Required Manipulations as Soon as Possible1999-09-0101 September 1999 Requests Waiver to Allow MR Pettengill to Participate in Upcoming Senior Operator Examination on 990920.Util Intends to Ensure That Pettengill Completes All Five Required Manipulations as Soon as Possible NG-99-1182, Forwards Certified License Applications IAW Provisions of Examiner Standard (ES)-201 for SA Arebaugh,Sd Bahnsen,Jd Kalamaja,Ja Miell,Bd Musel & MR Pettengill.Encls to Ltr Withheld Per 10CFR2.790(a)(6)1999-08-31031 August 1999 Forwards Certified License Applications IAW Provisions of Examiner Standard (ES)-201 for SA Arebaugh,Sd Bahnsen,Jd Kalamaja,Ja Miell,Bd Musel & MR Pettengill.Encls to Ltr Withheld Per 10CFR2.790(a)(6) ML20211M5811999-08-31031 August 1999 Forwards Proprietary Version of Rev 61 to DAEC Emergency Telephone Book. Proprietary Encl Withheld NG-99-1205, Forwards FFD Rept of Program Performance Info for DAEC During Six Month Period from 990101-06301999-08-30030 August 1999 Forwards FFD Rept of Program Performance Info for DAEC During Six Month Period from 990101-0630 ML20211F7831999-08-26026 August 1999 Forwards Insp Rept 50-331/99-09 on 990708-0819.Violation Re Failure to Log Entry Into TS Limiting Condition for Operation When Power Lost to Drywell Sump Pump Level Switches,Noted & Being Treated as NCV ML20210V1231999-08-17017 August 1999 Forwards Insp Rept 50-331/99-10 on 990802-06.No Violations Noted.Insp Examined Activities Conducted Under Emergency Preparedness Program ML20211A8731999-08-16016 August 1999 Ack Receipt of 990212 & 0402 Ltrs,Which Transmitted Changes Identified as Revs 39 & 40 to DAEC Security Plan,Submitted Under Provisions of 10CFR50.54(p).NRC Review Comments for Subject Plans,Encl NG-99-1146, Forwards Validated Exam Matls for Initial License Exam to Be Administered at Facility,Wk of 990920,IAW Guidelines in NUREG-1021,Rev 8,dtd April 19991999-08-16016 August 1999 Forwards Validated Exam Matls for Initial License Exam to Be Administered at Facility,Wk of 990920,IAW Guidelines in NUREG-1021,Rev 8,dtd April 1999 NG-99-1126, Submits Rept Re Changes in Calculated Peak Cladding Temp for Daec,Iaw 10CFR50.46(a)(3)(ii),guidance in NRC Info Notice 97-015 & Suppl 1.Rept Covers Period from Last Annual Rept Through June 19991999-08-13013 August 1999 Submits Rept Re Changes in Calculated Peak Cladding Temp for Daec,Iaw 10CFR50.46(a)(3)(ii),guidance in NRC Info Notice 97-015 & Suppl 1.Rept Covers Period from Last Annual Rept Through June 1999 NG-99-1050, Informs That Recommendation in BWRVIP-18,incorrectly Interpreted During RFO 15 & 25% of Creviced Welds Examined. All of Inspected Creviced Welds Were Found to Be Acceptable1999-07-28028 July 1999 Informs That Recommendation in BWRVIP-18,incorrectly Interpreted During RFO 15 & 25% of Creviced Welds Examined. All of Inspected Creviced Welds Were Found to Be Acceptable ML20210L8311999-07-27027 July 1999 Forwards Insp Rept 50-331/99-05 on 990601-0701.Violations Noted.Insp Included Assessment & Evaluation of Engineering Support,Design Change & Mod Activities Including 10CFR50.59 Safety Evaluations,Applicability Reviews & C/As ML20210E9781999-07-26026 July 1999 Informs That Info Submitted by Ltr (Nep 99-0067), Ies Utilities,Inc,Will Be Withheld from Public Disclosure, Per 10CFR2.790(a)(6) ML20210E1431999-07-22022 July 1999 Provides Summary of 990715 Meeting with Alliant Utilities & Duane Arnold Energy Ctr Mgt Re Recent Plant Performance Review Issued by NRC for Duane Arnold Energy Ctr.Associated Meeting Summary & Alliant Utilities Meeting Handout Encl NG-99-0993, Submits Amend to Commitment Contained in Util 990623 Response to NRC RAI Re Third ten-year Interval ISI Relief Requests.Licensee Now Commits to Meeting Code Requirement of Asme,Section XI,1989 Edition,Paragragh IWB/IWC-2420(a)1999-07-21021 July 1999 Submits Amend to Commitment Contained in Util 990623 Response to NRC RAI Re Third ten-year Interval ISI Relief Requests.Licensee Now Commits to Meeting Code Requirement of Asme,Section XI,1989 Edition,Paragragh IWB/IWC-2420(a) ML20210B7161999-07-20020 July 1999 Forwards Audit Rept on Y2K Contingency Planning Program at Duane Arnold Energy Center Conducted on 990615-16 as follow-up to NRC GL 98-01 ML20210B5271999-07-16016 July 1999 Forwards Insp Rept 50-331/99-07 on 990526-0707.Two Violations Being Treated as Noncited Violations NG-99-0989, Provides Estimate of Number of Licensing Requests That Will Be Submitted in FY00 & 01,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates1999-07-16016 July 1999 Provides Estimate of Number of Licensing Requests That Will Be Submitted in FY00 & 01,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates ML20209E8401999-07-13013 July 1999 Discusses Completion of NRC GL 97-04, Assurance of Sufficient Net Positive Suction Head for Emergency Core Cooling & Containment Heat Removal Pumps for Plant NG-99-0990, Forwards License Renewal Applications for Ta Zimmerman SOP 30772 & Ba Westcot SOP 30771.Encls Withheld,Per 10CFR2.7901999-07-13013 July 1999 Forwards License Renewal Applications for Ta Zimmerman SOP 30772 & Ba Westcot SOP 30771.Encls Withheld,Per 10CFR2.790 ML20209G4991999-07-12012 July 1999 Forwards Insp Rept 50-331/98-05 on 990622-24.No Violations Noted ML20207H6741999-07-0606 July 1999 Forwards Operating Licensing Exam Rept 50-331/99-301(OL) on 990525.Staff Administered Written Exam to One Reactor Operator Applicant Previously Demonstrating Unsatisfactory Results During Jul 1998 Exam NG-99-0928, Forwards Response to NRC 980902 Comments Re Design Basis NPSH Analyses as Requested by GL 97-041999-07-0101 July 1999 Forwards Response to NRC 980902 Comments Re Design Basis NPSH Analyses as Requested by GL 97-04 NG-99-0859, Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants,Per GL 98-01.Y2K Readiness Disclosure for Plant Encl1999-06-25025 June 1999 Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants,Per GL 98-01.Y2K Readiness Disclosure for Plant Encl ML20212J4521999-06-25025 June 1999 Discusses Closure of TAC MA1188 Re Response to RAI to GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity NG-99-0880, Informs That Util Commits to Repeating Newly Established Sequence of Component Exams During Successive Insp Intervals for NDE-R035,in Response to NRC Re Inservice Insp Relief Requests1999-06-23023 June 1999 Informs That Util Commits to Repeating Newly Established Sequence of Component Exams During Successive Insp Intervals for NDE-R035,in Response to NRC Re Inservice Insp Relief Requests ML20196F9531999-06-21021 June 1999 Forwards Proprietary Rev 60 to Duane Arnold Energy Center Emergency Telephone Book.Proprietary Info Withheld ML20196A1431999-06-18018 June 1999 Confirms Discussion Between Members of Staffs to Have Meeting on 990715 at Training Ctr at Duane Arnold Energy Ctr to Discuss Results of Plant Performance Review Process ML20212J0541999-06-17017 June 1999 Responds to Requesting That NRC Staff ...Allow BWR Plants Identified to Defer Weld Overlay Exams Until March 2001 or Until Completion of NRC Staff Review & Approval of Proposed Generic Rept,Whichever Comes First 1999-09-09
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217N5521999-10-21021 October 1999 Forwards Operator Licensing Exam Rept 50-331/99-302(OL) for Tests Administered During Wk of 990920.Six Applicants Passed All Sections of Exam & Were Issued Operating Licenses ML20217H8921999-10-18018 October 1999 Forwards SER Accepting Eight of Licensee Relief Requests, NDE-R001,(Part a & B),NDE-R027,NDE-R028,NDE-R029,NDE-R030, NDE-R032 & NDE-R035,one Request Relief NDE-R036,denied & Relief Request NDE-R034 Unnecessary ML20217F4801999-10-14014 October 1999 Provides Individual Exam Results for Applicants Who Took Sept 1999 Initial License Exam.Informs That Info Considered Proprietary & That Listed Info,Supplements & Exam Rept Will Be Issued Shortly ML20217F7221999-10-0707 October 1999 Forwards Insp Rept 50-331/99-11 on 990820-0930.No Violations Noted ML20212L0411999-10-0505 October 1999 Informs That Privacy Info Identified in Util Re Duane Arnold Energy Center Emergency Telephone Book,Rev 61 Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(a)(6) & Section 103(b) of Atomic Energy Act ML20212J8761999-09-30030 September 1999 Forwards RAI Re Util 990412 Request to Revise Duane Arnold Energy Ctr TS SR 3.6.1.3.7 to Allow Representative Sample of Reactor Instrumentation Line EFCV to Be Tested Every 24 Months,Instead of Testing Each EFCV Every 24 Months ML20217A9331999-09-30030 September 1999 Informs That NRC Plan to Conduct Addl Insp by Resident Inspectors Beyond Core Insp Program Over Next 7 Months to Assess Preparation for Implementation of Refuel Outage Activities.Historical Listing of Plant Issues Encl ML20212H2121999-09-27027 September 1999 Forwards Request for Addl Info Re 990412 Licensee Request to Revise DAEC TS SR 3.6.1.3.7 to Allow Representative Sample of Reactor Instrumentation Line EFCV to Be Tested Every 24 Months,Instead of Testing Each EFCV Every 24 Months ML20212H2151999-09-22022 September 1999 Forwards Amend 228 to License DPR-49 & Safety Evaluation. Amend Revises DAEC TS SR 3.4.3.1, Safety/Relief Valves & Safety Valves ML20212A8711999-09-14014 September 1999 Informs That 990716 Application Which Submitted Affidavit & Attachment Re Addl Info Re Cycle Specific SLMCPR for Plant Cycle 17, June 1999,marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20211M5621999-09-0202 September 1999 Forwards Insp Rept 50-331/99-08 on 990712-16 & 0810-12.No Violations Noted.Insp Consisted of Review of Source Term Reduction & Integration of ALARA Into Work Planning & Execution,Calibration & Maint ML20211F7831999-08-26026 August 1999 Forwards Insp Rept 50-331/99-09 on 990708-0819.Violation Re Failure to Log Entry Into TS Limiting Condition for Operation When Power Lost to Drywell Sump Pump Level Switches,Noted & Being Treated as NCV ML20210V1231999-08-17017 August 1999 Forwards Insp Rept 50-331/99-10 on 990802-06.No Violations Noted.Insp Examined Activities Conducted Under Emergency Preparedness Program ML20211A8731999-08-16016 August 1999 Ack Receipt of 990212 & 0402 Ltrs,Which Transmitted Changes Identified as Revs 39 & 40 to DAEC Security Plan,Submitted Under Provisions of 10CFR50.54(p).NRC Review Comments for Subject Plans,Encl ML20210L8311999-07-27027 July 1999 Forwards Insp Rept 50-331/99-05 on 990601-0701.Violations Noted.Insp Included Assessment & Evaluation of Engineering Support,Design Change & Mod Activities Including 10CFR50.59 Safety Evaluations,Applicability Reviews & C/As ML20210E9781999-07-26026 July 1999 Informs That Info Submitted by Ltr (Nep 99-0067), Ies Utilities,Inc,Will Be Withheld from Public Disclosure, Per 10CFR2.790(a)(6) ML20210E1431999-07-22022 July 1999 Provides Summary of 990715 Meeting with Alliant Utilities & Duane Arnold Energy Ctr Mgt Re Recent Plant Performance Review Issued by NRC for Duane Arnold Energy Ctr.Associated Meeting Summary & Alliant Utilities Meeting Handout Encl ML20210B7161999-07-20020 July 1999 Forwards Audit Rept on Y2K Contingency Planning Program at Duane Arnold Energy Center Conducted on 990615-16 as follow-up to NRC GL 98-01 ML20210B5271999-07-16016 July 1999 Forwards Insp Rept 50-331/99-07 on 990526-0707.Two Violations Being Treated as Noncited Violations ML20209E8401999-07-13013 July 1999 Discusses Completion of NRC GL 97-04, Assurance of Sufficient Net Positive Suction Head for Emergency Core Cooling & Containment Heat Removal Pumps for Plant ML20209G4991999-07-12012 July 1999 Forwards Insp Rept 50-331/98-05 on 990622-24.No Violations Noted ML20207H6741999-07-0606 July 1999 Forwards Operating Licensing Exam Rept 50-331/99-301(OL) on 990525.Staff Administered Written Exam to One Reactor Operator Applicant Previously Demonstrating Unsatisfactory Results During Jul 1998 Exam ML20212J4521999-06-25025 June 1999 Discusses Closure of TAC MA1188 Re Response to RAI to GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20196A1431999-06-18018 June 1999 Confirms Discussion Between Members of Staffs to Have Meeting on 990715 at Training Ctr at Duane Arnold Energy Ctr to Discuss Results of Plant Performance Review Process ML20212J0541999-06-17017 June 1999 Responds to Requesting That NRC Staff ...Allow BWR Plants Identified to Defer Weld Overlay Exams Until March 2001 or Until Completion of NRC Staff Review & Approval of Proposed Generic Rept,Whichever Comes First ML20195G9581999-06-0909 June 1999 Forwards Amend 227 to License DPR-49 & Safety Evaluation. Amend Revises DAEC TS by Adding New TS 3.7.9, Control Building/Standby Gas Treatment Sys (Cb/Sbgt) Instrument Air Sys ML20195F2181999-06-0909 June 1999 Forwards Insp Rept 50-331/99-04 on 990414-0525.One Violation of NRC Requirements Identified Involving Inadequate Testing of Standby Liquid Control Sys Valves & Being Treated as non-cited Violation ML20195D2631999-06-0707 June 1999 Forwards RAI on Third 10 Yr ISI Interval ISI Relief Requests.Addl Info Necessary to Complete Review of Request for Relief NDE-R035 Should Be Provided within 30 Days of Date of Ltr ML20207G4931999-06-0707 June 1999 Discusses OI Rept 3-1998-023 Conducted by NRC to Determine Whether Quality Control Inspector,Employed by Spec Insp Was Discriminated Against by Being Laid Off at Plant After Raising Safety Concern ML20207G4281999-06-0707 June 1999 Forwards Synopsis from Investigation Conducted by NRC Office of Investigations to Determine Whether Quality Control Inspector Was Discriminated Against by Being Laid Off at Duane Arnold Energy Center After Raising Safety Concern ML20207F1431999-06-0303 June 1999 Provides Individual Exam Results for Applicant Who Took 990525 Initial License Retake Exam.Encls Withheld ML20207B5821999-05-25025 May 1999 Advises That Rept Entitled, Criticality SE of Sf Storage Racks in Duane Arnold Energy Ctr for Max Enrichment Capability, & Holtec Rept HI-971708,dtd Aug 1997,marked Proprietary Will Be Withheld from Public Disclosure ML20207A7981999-05-20020 May 1999 Informs That During 990319 Telcon Between K Young & M Bielby,Arrangements Were Made for Administration of Licensing Exams at Duane Arnold Energy Center for Week of 990920 ML20206N7491999-05-13013 May 1999 Forwards Safety Evaluation Accepting Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20206N4531999-05-12012 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization, Division of Licensing Project Management Created. Reorganization Chart Encl ML20206G4821999-05-0404 May 1999 Informs That NRC Reviewed Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions & Accepts Resolution for Issue of Thermally Induced Pressurization ML20206G5271999-05-0404 May 1999 Informs That by ,Ies Utilities,Inc Provided Changes to QA Program in Ufsar,Rev 20 for Daec.Nrc Approval Not Required Prior to Implementation of Proposed Changes ML20205T6011999-04-23023 April 1999 Forwards Insp Rept 50-331/99-03 on 990303-0413.No Violations Noted.Inadequate Implementation of Mod to a Reactor Water Cleanup Pump Installed Resulted in Insufficient Oil Level & Subsequent Bearing Failure ML20205G2541999-04-0101 April 1999 Forwards RAI Re GL 95-07, Pressure-Locking & Thermal- Binding of Safety-Related Power-Operated Gate Valves. Response Requested within 30 Days from Date of Ltr ML20205D5201999-03-31031 March 1999 Requests Addl Info on GL 95-07, Pressure-Locking & Thermal- Binding of Safety-Related Power-Operated Gate Valves, Per Util 960213 Response.Response Should Provide Addl Info as Identified in Encl within 30 Days of Ltr Date ML20205A6291999-03-26026 March 1999 Informs of NRC Planned Insp Effort Resulting from Duane Arnold Energy Ctr Plant Performance Review for Period 970928-990131.Historical Listing of Plant Issues & Details of Insp Plan for Next 8 Months Encl ML20204J7341999-03-24024 March 1999 Forwards Insp Rept 50-331/99-01 on 990113-0302.No Violations Noted ML20204D1831999-03-16016 March 1999 Discusses Review of Revision 20 to Section H of Plant Energy Ctr Emergency Plan ML20207H9451999-03-11011 March 1999 Discusses Review of Rev 20 to Portions of Plant Emergency Plan.Rev Submitted Per 10CFR50.54(q) ML20207G0111999-03-0303 March 1999 Discusses GL 96-05 Issued on 960918 & Ies Utilities,Inc Responses ,970317,980513 & 981120 for Duane Arnold Energy Center.Concludes That Licensee Established Acceptable Program to Verify design-basis Capability of MOVs ML20203F1301999-02-10010 February 1999 Forwards Insp Rept 50-331/98-15 on 981125-990112 & NOV Re Failure to Review & Implement Applicable Procedure Requirements,Due to Sense of Urgency by Quality Control Inspector to Complete Work ML20203F2541999-02-10010 February 1999 Informs That Beginning 990216,DE Hills Will Be Chief of Operations Branch Which Includes Operator Licensing Function ML20202G4191999-02-0101 February 1999 Forwards Insp Rept 50-331/99-02 on 990119-21.No Violations Noted.Inspector Concluded That Staff Had Been Effective in Implementing C/As for Items Reviewed ML20202B3671999-01-26026 January 1999 Forwards Safety Evaluation Addressing Thermo-Lag Related Ampacity Derating Issues & Technical Evaluation of Duane Arnold Energy Ctr Analysis of Ampacity Loads for Fire Barrier Clad Power Cables. Technical Evaluation Rept Encl ML20202B4231999-01-26026 January 1999 Forwards Safety Evaluation of Request for Approval to Use ASME Code Case N-508-1 in ISI Program for Duane Arnold Energy Ctr.Request Authorized 1999-09-30
[Table view] |
Text
.
.p/aur .
UNITED STATES E
NUCLEAR REGULATORY COMMISSION E WASHINGTON, D.C. 2066H001 k f
...../ March 31, 1999 Mr. Eliot Protsch President IES Utilities Inc.
200 First Street, SE P.O. Box 351 Cedar Rapids, IA 52406-0351
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION ON GENERIC LETTER 95-07,
" PRESSURE-LOCKING AND THERMAL-BINDING OF SAFETY-RELATED POWER-OPERATED GATE VALVES," DUANE ARNOLD ENERGY CENTER (TAC NO. M93460)
Dear Mr. Protsch:
On August 17,1995, the NRC issued Generic Letter (GL) 95-07, " Pressure Locking and Thermal Binding of Safety-Relate d Power-Operated Gate Valves," to request that licensees take actions to ensure those safety-related power-operated gate valves that are susceptible to pressure locking or thermal binding are capable of performing their safety functions.
In a letter dated February 13,1996, IES Utilities (the licensee) submitted its 180-day response to GL 95-07 for Duane Arnold Energy Center (DAEC). The NRC staff reviewed the licensee's submittal and requested additional information in a letter dated May 31,1996. By letter dated July 3,1996, the licensee provided the additional information.
The NRC staff has reviewed the licensee's submittals regarding GL 95-07 for DAEC, and has determined that additional information is necessary to complete our review. We request that you provide the additional information as identified in the enclosure within 30 days of the date of this letter. !
/
dQ e wn "
?!84
" $88 F 83888521 g ggg3&"81 1
J
Mr. Eliot Protsch Your timely response to the request for additional information (RAl) will assist us in .neeting our schedule. This RAI and the schedule have been discussed with Robert Murrell of your staff. If yeu have any questions regarding this issue, please contact me at 301-415-2020.
Sincerely,
/o Brenda L. Mozafari, Project Manager Project Directorate lll-1 Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-331
Enclosure:
As stated !
cc w/ encl.: See next page a
e..+-g
s . .
March 31, 1999
! ~ Mr. Eliot Protsch Your timely response to the request for additional information (RAI) will assist us in meeting our schedule. This RAI and the schedule hase been discussed with Robert Murrell of your staff. If you have any questions regarding this issue, please contact me at 301-415-2020.
Sincerely, Original signed by:
Brenda L. Mozafari, Project Manager
. Project Directorate lll-1 Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-331
Enclosure:
As stated j cc w/ encl.: See next page i DISTRIBUTION Docket File ACRS PUEUC TScarbrough PD3-3 Reading JZwolinski GGrant, Rlli OGC PD3-1 r/f l 1
l DOCUMENT NAME: DUANEARN\DA934601.WPD OFFICE PM:PD31 . E LA:PD31 E NAME BMozafari &f EBarnhill 9M
_DATE 3 /$l /99 ~ 3 50/99 OFFICIAL RECORD COPY
Mr. Eliot Protsch March 31,-1999 Your timely response to the request for additional information (RAl) will assist us in meeting our schedule. This RAI and the schedule have been discussed with Robert Murrell of your staff. If you have any questions regarding this issue, please contact me at 301-415-2020.
Sincerely, Original signed by:
Brenda L. Mozafari, Project Manager I .? ject Directorate lil-1 Division of Licensing Project Management Office of Nuclear Reactor Regulation l Docket No. 50-331
Enclosure:
As stated cc w/ encl.: See next page DISTRIBUTION Docket File- ACRS PUBLIC TScarbrough PD3-3 Reading JZwolinski GGrant, Rill OGC ;
PD3-1 r/f DOCUMENT NAME: DUANEARN\DA934601.WPD OFFICE - PM:PD31 . E LA:PD31 E ,
NAME BMozafari &# EBarnhill 9k DATE 3 /3ll49 ~ 3 R0/99 ~
OFFICIAL RECORD COPY
Mr. Eliot Protsch Duane Amold Energy Center IES UtilitiesInc. ;
I cc: l l
Jack Newman, Esquire Al Gutterman, Esquire Morgan, Lewis, & Bocklus 1800 M Street, NW. I Washington, DC 20036-5869 !
)
Chairman, Linn County
' Board of Supervisors Cedar Rapids,IA 52406 IES Utilities Inc.
ATTN: Gary Van Middlesworth Plant Superintendent, Nuclear 3277 DAEC Road Palo,IA 52324 John F. Franz, Jr.
Vice President, Nuclear Duane Amold Energy Center 3277 DAEC Road Palo,IA 52324 1
Ken Peveler l Manager of Regulatory Performance i Duane Amold Energy Conter 3277 DAEC Road Palo,IA 52324 U.S. Nuclear Regulatory Commission Resident inspector's Office Rural Route #1 Palo,IA 52324 Regional Administrator, Rlli U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4531 Parween Balg Utilities Division iowa Department of Commerce Lucas Office Building,5th floor Des Moines,IA 50319
~~
._ J _ . . . . T~ ~ ~ ~ ~ - ...J
1 REQUEST FOR ADDITIONAL INFORMATION REGARDING GENERIC LETTER 96-05 RESPONSE FOR THE DUANE ARNOLD ENERGY CENTER DOCKET NO. 50-331
- 1. In NRC Inspection Report No. 50-331/95011, the NRC staff closed its review of the motor-operated valve (MOV) program implemented at the Duane Amold Energy Center (DAEC) in response to Generic Letter (GL) 89-10, " Safety-Related Motor-Operated Valve Testing and Surveillance." In the inspection report, the NRC staff noted certain aspects of the licensee's MOV program that would be addressed over the long term. For example, the NRC staff noted that (1) the licensee would be expected to review applicable information fcilowing completion of the NRC staff's evaluation of the Electric Power Research Institute (EPRI) MOV Performance Prediction Methodology and to take appropriate action, as necessary; and (2) the licensee would need to supplement its test data regarding its assumptions for stem lubricant degradation and load sensitive behavior as part of its long-term MOV program. Since then, the NRC staff has completed its review of the EPRI MOV program as described in a safety evaluation (SE) dated March 15,1996, and an SE supplement dated February 20,1997.
I Describe the actions taken to address the specific long-term aspects of the MOV program at DAEC that were noted in the NRC inspection report.
- 2. In a letter dated June 25,1996, to the licensee, the NRC staff provided its SE related to the licensee's removal of 17 MOVs from the GL 89-10 program at DAEC. Those 17 MOVs have safety-related functions but are normally in their safety position. In the SE, the NRC staff concluded that the 17 MOVs are subject to the requirement that they be capable of retuming to their safety position (if they are out of their safety position for surveillance or testing) or the provisions of the appropriate Technical Specifications (TS) for the systems (or trains) out of service must be followed. The NRC staff also noted that the licensee needed to address any applicable containment isolation or pipe break isolation requirements for these MOVs. In the SE, the NRC staff concluded that the commitments made by the licensee as discussed in NRC Inspection Report 95011 and subsequent licensee letters provided adequate confidence that the licensee had demonstrated and would maintain capability of the 17 MOVs to retum to their safety position under accident conditions. The NRC staff noted that the licensee would be expected to take appropriate action according to its TS if plant or industry information revealed that these MOVs were not capable of retuming to their safety position. Finally, the NRC staff stated that the licensee would be expected to periodically evaluate the capability of these MOVs to retum to their safety position as part of its long-term MOV program. In its letter dated March 17,1997, in response to GL 96-05, the licensee reported that the periodic verification criteria for the 17 MOVs would be as follows:
(1) torque switch settings shall be maintained not less than previously tested values, (2) industry operating experience and data feedback will be evaluated to determine if Enclosure
_ __ J
1
, l 4
, any adjustments to control switch settings are required, and (3) if torque switch setting .
adjustments are required, adjustments will be performed during the next appropriate l scheduled maintenance activity, but periodic verification dynamic or static diagnostic l testing will not be performed on these MOVs. Although the NRC staff recognizes the low l risk significance of these MOVs, it is not apparent that the licensee's stated periodb verification criteria will provide confidence that these MOVs will be capable of returning to their safety position without (1) plans for performing required switch setting adjustments promptly, (2) any specified MOV operation under dynamic conditions, or (3) any future diagnostic testing.
Describe the bases for its confidence that (1) these MOVs will continue to be capable of retuming to their safety position, (2) any degradation in MOV performance will be identified prior to causing the MOVs to be incapable of returning to their safety position, and (3) any action necessary to ensure MOV capability will be taken in a timely manner.
- 3. The JOG program focuses on the potential age-related increase in the thrust or torque required to operate valves under their design-basis conditions. In the NRC SE dated October 30,1997, on the JOG program, the NRC staff specified that licensees are responsible for addressing the thrust or torque delivered by the MOV motor actuator and its potential degradation.
Describe the plan at Duane Amold for ensuring adequate MOV motor actuator output capability, including consideration of recent guidance in Limitorque Technical Update 98-01 and its Supplement 1.
- . __ _ ._.