Forwards RAI on Third 10 Yr ISI Interval ISI Relief Requests.Addl Info Necessary to Complete Review of Request for Relief NDE-R035 Should Be Provided within 30 Days of Date of Ltr
ML20195D263
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 06/07/1999
From: Mozafari B
NRC (Affiliation Not Assigned)
To: Protsch E
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
References
TAC-MA4151, NUDOCS 9906090106
Download: ML20195D263 (5)


Text

{{#Wiki_filter:~ Q f. e'

                                                                                                                    )
                                                         ' June 7,~1999-
 "~

Mr. Eliot Protsch ,

           . President fIES Utilities Inc.                                          "'
200 First Street, SE.
          ' P.O. Box 351:

Cedar Rapids llA 52406-0351

                                             ' .' i?      '
                                                                 ~"
                               ;         a 4   SUBJECTr IAEQUEST FOR ADDITIONAL INFORMATION ON THIRD 10-YEAR INSERVICE tNSPECTION INTERVAL ISI RELIEF REQUESTS - DUANE ARNOLD ENERGY -

3 CENTER (TAC NO. MA4151); . L

Dear Mr. Protsch:

In a lettsr date$' October 30,1998, IES ' Utilities (the licensee) requested, pursuant to 10 CFR 50.55a,lhet the U.S._ Nuclear Regulatory Commission (NRC) grant relief from certain provisions j of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code I (Code), Section XI, at the Duane Amold Energy Center. The NRC staff has reviewed the licensee's submittal regarding the relief requests, and has determined that additional information is necessary to complete our review of the request for relief No. NDE-R035. We request that you provide the additional information as identified in the enclosure within 30 days of the date of this letter. This RAI and the schedule have been discussed with Robert Murrell cf your staff. If you have any questions regarding this issue, please contact me at 301-415-2020. Sincerely Original _ signed by: Brenda L. Mozafari, Project Manager, Section 1 /'/ Project Directorate lil Divisio'n of Licensing Project Management

                                                                                                              '/'

Office of Nuclear Reactor Regulation

                                                                                                                  /

Docket No. 50-331 -

Enclosure:

As stated DISTRIBUTION Docket File ACRS cc w/ encl:L See next page . PUBLIC ^ STingen PD3-1 Reading JZwolinski

                                                     - GGrant, Rlli            OGC DOCUMENT NAME!G:\PDlIl-1\DUANEARN\DA4151.WPD
          - "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy OFFICE - PM:LPD3          _

C LA:LPD3' _C SC:LPD3 C BC:EMChr NAME BMozafarLfFEBarnhill & CCraigh Jn WBatenG#t-T 7- 6/% /99 DATE 6/ 3 /99 6 /.3 /99 6/f /99 OFFICIAL RECORD COPY-t _PDR ADOCK 05000331 P. PDR , 1 I

e

  • June 7, 1999 4 Mr. Eliot Protsch

-( President - IES Utilities Inc. 200 First Street, SE

                                                                                                     ~

P.O. Box 351 Cedar Rapids, IA 52406-0351

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION ON THIRD 10-YEAR INSERVICE INSPECTION INTERVAL ISI RELIEF REQUESTS - DUANE ARNOLD ENERGY CENTER (TAC NO. MA4151)

Dear Mr. Protsch:

in a letter dated October 30,1998, IES Utilities (the licensee) requested, pursuant to 10 CFR 50.55a, that the U.S. Nuclear Regulatory Commission (NRC) grant relief from certain provisions of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code), Section XI, at the Duane Arnold Energy Center. The NRC staff has reviewed the licensee's submittal regarding the relief requests, and has determined that additional information is necessary to complete our review of the request for relief No. NDE-R035. We request that you provide the additionalinformation as identified in the enclosure within 30 days of the date of this letter. This RAI and the schedule have been discussed with Robert Murrell of your staff. If you have any questions regarding this issue, please contact me at 301-415-2020.- Sincerely Original signed by: Brenda L. Mozafari, Project Manager, Section.1 Project Directorate Ill. Divisio'n of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-331

Enclosure:

As stated DISTRIBUTION Docket File ACRS cc w/ encl: See next page PUBLIC STingen PD3-1 Reading JZwolinski GGrant, Rlli OGC DOCUMENT NAME:G:\PDill-1\DUANEARN\DA4151.WPD "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy OFFICE PM:LPD3 C LA:LPD3 .C SC:LPD3 C BC:EMCf$n NAME BMozafariMfEBamhill & CCraig& AWBaterik@rrT 1 DATE '# ' 6/ A /99 6 /3 /99 6/f /99 6/1- /99 OFFICIAL RECORD COPY l _ _ _ . Z'r . . . = .

7*:0 y 'k UNITED STATES -{ g j NUCLEAR REGULATORY COMMISSION ' o ( WASHINGTON, D.C. 30seH001 June 7, 1999 4 I l Mr. Eliot Protsch j President l lES Utilities Inc. ' 200 First Street, SE P.O. Box 351' Cedar Rapids, IA 52406-0351

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION ON THIRD 10-YEAR INSERVICE I I INSPECTION INTERVAL ISI RELIEF REQUESTS - DUANE ARNOLD ENERGY CENTER (TAC NO. MA4151)

Dear Mr. Protsch:

In a letter dated October 30,1998, IES Utilities (the licensee) requested, pursuant to 10 CFR l 50.55a, that the U.S. Nuclear Regulatory Commission (NRC) grant relief from certain provisions of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code), Section XI, at the Duane Arnold Energy Center. The NRC staff has reviewed the licensee's submittal regarding the relief requests, and has determined that additional information is necessary to complete our review of the request for relief No. NDE-R035. We request that you provide the additionalinformation as identified in the j enclosure within 30 days of the date of this letter. This RAI and the schedule have been i discussed with Robert Murrell of your staff. If you have any questions regarding this issue, please contact me at 301-415-2020. j l Sincerely L//

                                                                                            /

Brenda L. Mozafari, Project Manager, Section 1 l Project Directorate lll Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-331

Enclosure:

As stated cc w/ encl: See next page

7 , ,  :.

    '9'

( Mr. Eliot Protsch Duane Amold Energy Center IES Utilities Inc. cc: Jack Newman, Esquire -

                      ~ Al Gutterman, Esquire Morgan, Lewis, & Bockius -

1800 M Street, NW. Washington, DC 20036-5869 Chairman, Linn County - Board of Supervisors Cedar Rapids,IA 52406

                     ' IES Utilities Inc.

ATTN: Gary Van Middlesworth

                     - Plant Superintendent, Nuclear 3277 DAEC Road                                ,

Palo, IA._52324 John F. Franz, Jr. Vice President, Nuclear Duane Amold Energy Center

                    - 3277 DAEC Road Palo,IA 52324' Ken Peveler Manager of Regulatory Performance Duane Amold Energy Center 3277 DAEC Road -
                     'Palo,IA 52324 U.S. Nuclear Regulatory Commission
Resident inspector's' Office Rural Route #1'-

Palo,IA 52324 Regional Administrator, Rlli

                    ; U.S. Nuclear Regulatory Commission 801 Warrenville Road I

Lisle, IL ~ 60532-4531 Parween Baig.-

                    - Utilities Division Iowa Department of Commerce Lucas Office Building,5th floor
j. Des Moines, IA . 50319 l
 ,                                _     < _ . _ , ----.m.___,_,._,c_   4 -

k REQUEST FOR ADDITIONAL INFORMATION REGARDING INSERVICE INSPECTION ALTERNATIVE EXAMINATION NUMBER NDE-035 FOR THE DUANE ARNOLD ENERGY CENTER DOCKET NO. 50-331 Request for Alternative NDE-R035 proposes the use of American Society of Mechanical Engineers (ASME) Bo~ler and Pressure Vessel Code (Code), Section XI, Code Case N-598,

          ' Alternative Requirements to Required Percentages of Examinations" for Class 1,2, and 3 components. The Cod a Case and Code both require the same minimum percentage of examinations be com;:leted each inspection period, but the Code Case allows a greater maximum percentage of examinations for the first and second periods. This allows more examinations to be performed early in the interval. However, the use of this Code Case will establish a new sequence of component examinations. To authorize this alternative, the licensee must commit to repeating the newly established sequence of component examinations g         during successive inspection intervals. Confirm that the sequence of component examinations will be repeated for successive inspection intervals.

O ra

                                          *d muusiem vW%+}}