Ack Receipt of 861202 Proposed Amend to Facility Physical Security Plan in Response to Miscellaneous Amends & Search Requirements.Response to Request for Addl Info & Revs Requested within 30 Days of Ltr Receipt
ML20235B090
Person / Time
Site: Duane Arnold 
Issue date: 09/15/1987
From: Cappucci A
Office of Nuclear Reactor Regulation
To: Leslie Liu
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
References
NUDOCS 8709230538
Download: ML20235B090 (9)


Text

.

Docket No. 50-331 Mr, Lee Liu SEP 151987 Chairman of the Board b

and Chief Executive Officer Iowa Electric Light & Power Company P.O. Box 351 Cedar Rapids, Iowa 52406

Dear Mr. Liu:

SUBJECT:

MISCELLANEOUS AMENDMENTS / SEARCH REQUIREMENTS DUANE ARNOLD ENERGY CENTER (TAC # 65173)

This is to acknowledge receipt of the Iowa Electric Light and Power Company letter, dated December 2, 1986, which transmitted a proposed amendment to the Duane Arnold Energy Center Physical Security Plan, in response to the Miscellaneous Amendments and Search Requirements.

The submitted document has been reviewed and we have determined that additional information and revisions to the plan are required prior to our approval.

The enclosed comments are based upon pertinent NRC regulations and published guidance describing methods, acceptable to the NRC staff, for implementing specific parts of those regulations.

It is requested that you provide your response to these comments within 30 days from receipt of this letter.

The reporting and/or record keeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.

Should you have any questions concerning the enclosed comments, please contact the reviewer, Robert Skelton, at (301) 492-4533.

Sincerely, Anthony J. Cappucci, Jr., Project Manager Project Directorate III - 1 Division of Reactor Projects III, IV, V and Special Projects Office of Nuclear Reactor Regulation

Enclosure:

DISTRIBUTION W/ ENCLOSURES:

Physical fecurity Plan Comments RSGB rf Sec rf RSkelton CBuracker (2) cc w/ enclosure:

Region III RIngram i

See next page ACappucci

, Docket' File 50-331'>

8709230538 870915 Case File NRC PDR PDR ADOCK 05000331 RErickson wo/ enc 1 Local PDR F

PDR LBush wo/ enc 1 t[

1 0FC :RSGB D: RSGB

RSGB 4
RS
PD III-1 TII-1 u ----- :pp g -j

-- p y

NAME$RSkeItn

$CBurdck9r

LBush
RE-son
Ring pucci
g1/;rgi \\ie DATE

/ /8h

. / /8h

/

/hh

/l /87

$3/1/87

/ /8h fb 7

c Docket No. 50-331 i

! a COMMENTS ON PHYSICAL SECURITY PLAN CHANGES (MISCELLANEOUS AMENDMENTS AND SEARCH REQUIREMENTS)

DUANE ARNOLD ENERGY CENTER Provide a schedule for implementing the amended safeguards requirements within 180 days after Commission approval of the proposed security plan.

Reference 10 CFR 73.55.

Stipulate that in a plant safety emergency, reasonable action may be taken to suspend any saf guards measures in accordance with 10 CFR 50.54(x) and (y) when this action is immediately needed to protect the public health and safety.

Reference 10 CFR 73.55(a) and Generic Letter 87-08 (Q&A #2).

State that vital area access controls will not be dropped for life threatening situations not involving public health and safety.

Reference 10 CFR 50.54(x) and (y) and Generic Letter 87-08 (Q&A #3).

Provide a commitment that a physical pat-down search of an individual shall be conducted if there is cause to suspect that an individual is attempting to bring firearms, explosives, or incendiary devices into the protected area.

Reference 10 CFR 73.55(d)(1).

Provide a commitment that in the case of an individual's involuntary termination for cause, the individual's unescorted facility access will be revoked, and identification badge and other entry devices shall be retrieved prior to or simultaneously upon notification of termination.

Reference 10 CFR 73.55(d)(7)(1)(C).

Revise the commitment on page 3-13 and 3-14 to ensure prompt access to vital equipment to accommodate the potential need for rapid ingress or egress of individuals during emergency conditions or situations.

Indicate how this prompt access will be eisured (e.g., by issuing override keys to appropriate operators and security force members at the start of each shift, or by other acceptable means).

Reference 10 CFR 73.55(d)(7)(ii) and Generic Letter 87-08 (Q&A #6).

Revise the commitment on page 14-1 to periodically (annually) review physical security and contingency plans and procedures to evaluate their potential impact on plant and personnel safety.

Reference 10 CFR l

73.55(d)(7)(ii)(B) and Regulatory Guide 5.65.

Indicate what additional components of the secondary power supply system will be protected as vital.

Reference 10 CFR 73.55(e)(1) and Generic Letter 87-08 (Q&A #18).

4 Provide a commitment to maintain a log indicating name, badge number, time of entry, and time of exit of all individuals granted access to a vital area except those individuals entering or exit ing the reactor control room.

j Reference 10 CFR 73.70(d).

Section 13 6 should be rewritten to remove the j

terminology of " unoccupied" vital areas.

)

1 l

x

~~

Y Mr. Lee Liu Iowa Electric, Light and. Power Company Duane Arnold Energy Center ac:

Jack Newman, Esquire Kathleen H. Shea, Esquire Newman and Holtzin'ger-1615 L Street, N.W.

Washington, D.C.

20036 Office for Planning and Programming 523 East 12th Street Des Moines', Iowa 50319

-Chairman, Linn County Board of Supervisors-Cedar Rapids, Iowa 52406 Iowa Electric Light and Power Company ATTN:

R. Hannen

' Post Office Box 351 Cedar. Rapids Iowa 52406 U.S. Nuclear Regulatory Commission Resident Inspector's Office Rural Route #1 Palo, Iowa 52324 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 l

Mr. Thomas Houvenagle Regulatory Engineer Iowa Commerce Commission Lucas State Office Building Des Moines,-Iowa 50319 1

1 l

l

a T @pM"%k UNITED STATES i.w-NUCLEAR REGULATORY COMMISSION t L. J-s wasmNGTON. D. C. 20066

"?g.

-)

.. 4

' SEP.15 BW 0:cket No. 50-331 Mr. Lee Liu Chairman of the Board'

- and Chief' Executive Officer.

Iowa Electric Light & Power Company P.O. Box 351 Cedar Rapids, Iowa 52406

Dear Mr. Liu:

SUBJECT:

-MISCELLANEOUS AMENDMENTS / SEARCH REQUIREMENTS DUANE ARNOLD ENERGY CENTER (TAC # 65173)

This is to acknowledge receipt of the Iowa Electric Light and Power Company l

' letter,. dated December 2,1986, which transmitted a proposed amendment to the Duane Arnold Energy Center Physical Security Plan, in response to the

' Miscellaneous Amendments and Search Requirements.

~The submitted document has been reviewed and we have determined that additional information and revisions to the plan are required prior to our approval.

The enclosed comments are based upon pertinent NRC regulations and published guidance describing methods, acceptable to the NRC staff, for implementing specific parts of-those regulations.

It is requested that you provide your response to these comments within 30 days from receipt of this letter.

The reporting and/or record keeping requirements contained in this letter I

affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.

Should you have any questions concerning the enclosed p mments, please contact the reviewer, Robert Skelton, at (301) 492-4533.

Sinc 1,

r Anthony J. Cappucci, Jr., Project Manager Project Directorate III - 1 Div;sion of Reactor Projects III, IV, V and Special Projects Office of Nuclear Reactor Regulation

Enclosure:

Physical Sei:urity Plan Comments cc w/ enclosure:

See next page I

f-

.o-p;'

t(

Mr.--Lee Liu Iowa Electric-Light and Power Company Duane Arnold Energy. Center

'cc:

Jack Newman, Esquire

'Kathleen H..Shea, Esquire Newman and Holtzinger 1615 L Street, N.W.

Washington, D.C.

20036 Office for Planning and Programming 523 East'12th Street Des Moines, Iowa 50319 Chairman, Linn County Board of Supervisors Cedar Rapids, Iowa 52406 Iowa Electric Light and Power Company ATTN:

R. Hannen Post Office Box 351 Cedar Rapids, Iowa 52406 U.S. Nuclear Regulatory Commission Resident Inspector's Office Rural Route #1

-Palo, Iowa 5.2324 Regional Administrator, Region III

'U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

'l Mr.-Thomas Houvenagle Regulatory Engineer Iowa Commerce Commission Lucas State Office Building Des Moines, Iowa 50319

)

Dockot No. 50-331 y;

't COMMENTS ON PHYSICAL SECURITY PLAN CHANGES (MISCELLANEOUS AMENDMENTS AND SEARCH REQUIREMENTS)

DUANE ARNOLD ENERGY CENTER Provide a schedule for implementing the amended safeguards requirements within 180 days after Commission approval of the proposed security plan.

Reference 10 CFR 73.55.

i Stipulate that in a plant safety emergency, reasonable action may be taken-to suspend any safeguards measures in accordance with 10 CFR 50.54(x) and (y)'when this action is immediately needed to protect the public health and safety.

Reference 10 CFR 73.55(a) and Generic Letter 87-08 (Q&A #2).

State that vital area access controls will not be dropped for life threatening situations not involving public health and safety.

Reference 10 CFR 50.54(x) and (y) and Generic Letter 87-08 (Q&A #3).

Provide a commitment that a physical pat-down search of an individual shall be conducted if there is cause to suspect that an individual is attempting to bring firearms, explosives, or incendiary devices into the protected area.

Reference 10 CFR 73.55(d)(1).

Provide a commitment that in the case of an individual's involuntary termination for cause, the individual's unescorted facility access will be revoked,.and identification badge and other entry devices shall be retrieved prior to or simultaneously upon notification of termination.

Reference 10 CFR 73.55(d)(7)(i)(c).

Revise the commitment on page 3-13 and 3-14 to ensure prompt access to vital equipment to accommodate the potential need for rapid ingress or egress of individuals during emergency conditions or situations.

Indicate how this prompt access will be ensured (e.g., by issuing override keys to appropriate operators and security force members at the. start of each shift, or by other acceptable means).

Reference 10 CFR 73.55(d)(7)(ii) and Generic Letter 87-08 (Q&A #6).

Revise the commitment on page 14-1 to periodically (annually) review physical security and contingency plans and procedures to evaluate their potential impact on plant and personnel safety.

Reference 10 CFR 73.55(d)(7)(ii)(B) and Regulatory Guide 5.65.

Indicate what additional components of the secondary power supply system will be protected as vital.

Reference 10 CFR.73.55(e)(1) and Generic Letter 87-08 (Q&A #18).

Provide a commitment to maintain a log indicating name, badge number, time of entry, and time of exit of all individuals granted access to a vital area except those individuals entering or exiting the reactor control room.

Reference 10 CFR 73.70(d).

Section 13.6 should be rewritten to remove the terminology of " unoccupied" vital areas.

^

f " %+,%

.j UNITED STATES O

' './#

NUCLEAR REGULATORY COMMISSION o

5 I

WASHINGTON, D. C. 20655

%.2.....-]

SEP 15 387 D:cket No. 50-331 Mr. Lee Liu Chairman of the Board and Chief Executive Officer Iowa Electric Light & Power Company P.O. Box 351 Cedar Rapids, Iowa 52406

Dear Mr. Liu:

SUBJECT:

MISCELLANEOUS AMENDMENTS / SEARCH REQUIREMENTS DUANE ARNOLD ENERGY CENTER (TAC # 65173)

This is to acknowledge receipt of the Iowa Electric Light and Power Company letter, dated December 2, 1986, which transmitted a proposed amendment to the j

Duane Arnold Energy Center Physical Security Plan, in response to the n

Miscellaneous Amendments and Search Requirements.

The submitted document has been reviewed and we have determined that additional information and revisions to the plan are required prior to our approval.

The enclosed comments are based upon pertinent NRC regulations and published guidance describing methods, acceptable to the NRC staff, for implementing specific parts of those regulations.

{

It is requested that you provide your response to these comments within 30 days l

from receipt of this letter, i

The reporting and/or record keeping requirements contained in this letter j

affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.

i l

Should you have any questions concerning the enclosed comments, please contact l

the reviewer, Robert Skelton, at (301) 492-4533.

Sinc 1,

I I

}

\\

V

(

Anthony J. Cappucc i, Jr., Project Manager Project Directorate III - 1 Division of Reactor Projects III, IV, V and Special Projects Office of Nuclear Reactor Regulation

Enclosure:

j Physitti Security Plan Comments li cc w/ enclosure:

I l

See next page 1

i i

'f Mr. Lee Liu Iowa Electric Light and Power Company Duane Arnold Energy Center CC:

Jack Newman, Esquire i

Kathleen H. Shea, Esquire Newman and Holtzinger 1615 L Street, N.W.

Washington, D.C.

20036 i

Office for Planning and Programming 523 East 12th Street Des Moines, Iowa. 50319 1

1 Chairman, Linn County Board of Supervisors Cedar Rapids, Iowa 52406 Iowa Electric Light and Power Company ATTN:

R. Hannen Post Office Box 351 Cedar Rapids, Iowa 52406 U.S. Nuclear Regulatory Commission Resident Inspector's Office Rural Route #1 Palo, Iowa 52324 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Mr. Thomas Houvenagle Regulatory Engineer Iowa Commerce Commission Lucas State Office Building Des Moines, Iowa 50319

'f Docket No. 50-331

{

)

d

.s.

COMMENTS ON PHYSICAL SECURITY PLAN CHANGES

)

(MISCELLANEOUS AMENDMENTS AND SEARCH REQUIREMENTS) 1 DUANE ARNOLD ENERGY CENTER Provide a schedule for implementing the amended safeguards requirements i

within 180 days after Commission approval of the proposed security plan.

i Reference 10 CFR 73.55.

Stipulate that in a plant safety emergency, reasonable action may be taken to suspend any safeguards measures in accordance with 10 CFR 50.54(x) and l

(y) when this action is'immediately needed to protect the public health and 1

safety.

Reference 10 CFR 73.55(a) and Generic Letter 87-08 (Q&A #2).

)

)

State that vital area access controls will not be dropped for life l

threatening situations not involving public health and safety.

Reference 10 CFR 50.54(x) and (y) and Generic Letter 87-08 (Q&A #3).

Provide a commitment that a physical pat-down search of an individual shall

)

be conducted if there is cause to suspect that an individual is attempting to bring firearms, explosives, or incendiary devices into the protected area.

Reference 10 CFR 73.55(d)(1).

Provide a commitment that in the case of an individual's involuntary termination for cause, the individual's unescorted facility access will be revoked, and identification badge and other entry devices shall be retrieved prior to or simultaneously upon notification of termination.

Reference 10 CFR 73.55(d)(7)(1)(C).

Revise the commitment on page 3-13 and 3-14 to ensure prompt access to vital equipment to accommodate the potential need for rapid ingress or egress of individuals during emergency conditions or situations.

Indicate how this prompt access will be ensured (e.g., by issuing override keys to appropriate operators and security force members at the start of eat.h shift, or by other acceptable means).

Reference 10 CFR 73.55(d)(7)(ii) and Generic Letter 87-08 (Q&A #6).

Revise the commitment on page 14-1 to periodically (annually) review physical security and contingency plans and procedures to evaluate their potential impact on plant and personnel safety.

Reference 10 CFR 73.55(d)(7)(ii)(8) and Regulatory Guide 5.65.

Indicate what additional components of the secondary power supply system will be protected as vital.

Reference 10 CFR 73.55(e)(1) and Generic Letter 87-08 (Q&A #18).

Provide a commitment to maintain a log indicating name, badge number, time of entry, and time of exit of all individuals granted access to a vital area except those individuals entering or exiting the reactor control room.

Reference 10 CFR 73.70(d).

Section 13.6 should be rewritten to remove the terminology of " unoccupied" vital areas.

t l..