ML20195G958

From kanterella
Jump to navigation Jump to search

Forwards Amend 227 to License DPR-49 & Safety Evaluation. Amend Revises DAEC TS by Adding New TS 3.7.9, Control Building/Standby Gas Treatment Sys (Cb/Sbgt) Instrument Air Sys
ML20195G958
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 06/09/1999
From: Mozafari B
NRC (Affiliation Not Assigned)
To: Protsch E
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
Shared Package
ML20195G964 List:
References
TAC-MA3868, NUDOCS 9906160235
Download: ML20195G958 (4)


Text

..

Distribution w/encis:

. June 9, 1999 Dock:t File GHill(2)

PUBLIC~ ' GGrant, Rill s

PD31 r/f WBeckner, TSB

.ACRS. JZwolinski/SBlack Mr. Eliot Protsch CCraig/CThomas OGC PresidentD RCN (SE onty) lES Utilities Inc.

200 First Street, SE.

. P.O.; Box 351 Cedar Rapids,' IA .52406-0351

SUBJECT:

DUANE ARNOLD ENERGY CENTER-ISSUANCE OF AMENDMENT RE: STANDBY GAS TREATMENT INSTRUMENT AIR (TAC NO. MA3868) f  %

Dear Mr. Protsch:

~

~

~

' The.U.S. Nuclear Regulatory Commission has issued the enclosed Amendment No.227 to Facility Operatins License No.' DPR-49 for the Duane Arnold Energy Center (DAEC). This amendment consists of changes to the Technical Specifications (TS) in response to your -

application dated October 15,1998, as supplemented December 21;'_1998.

The amendment revises the DAEC TS by adding'a new TS 3.7.9,'" Control Building / Standby Gas j

' Treatment System (CB/SBGT) instrument Air System."iThe amendment also revises TS 3.6.1.3, " Primary Containment isolation Valves (PCIVs)," Condition E, by adding a time limit for plant operation if a penetration flow path is isolated by a single purge valve with resilient seal.

' A copy of the related Safety Evaluation is also enclosed. Notice of issuance will be included in the Commission's next biweekly Eederal Reaister notice.

Sincerely, .

Original signed by:

Brenda L. Mozafari, Project Manager, Section 1 Project Directorate 111

. Division of Reactor Projects lil/IV Office of Nuclear Reactor Regulation Docket No. 50-331

Enclosures:

1.~ Amendment No,227to License No. DPR-49 P..; Safety Evaluation Ok cc w/encis: Sse next page '

DOCUMETH NAME: G:\PDill-1\DUANEARN\AMD3868.vgpel 1% Noinajcr chays bSE OFFICE PM:LPD3 - Ei LA:LPD3 6 O G_C / SC:LPD3, R.: SPL6 ,

NAME BMozafar42P4 EBarnhill fg C

. f A) MtCraig lf-- c,HaLLaulf DATE SM/99 (,/f /99 h/099 4/9/99 S//P/W OFFICIAL RECORD COPY /

l 9906160235 99060931 PDR ADOCK O m

y

-* Distribution w/encis:

h*2 1 June 9, 1999 GHill(2) .

Docket File

- PUBlic GGrtnt, Rill ,

PD31 rA WBeckner, TSB L- JZwolinski/SBlack ACRS Mr. Eliot Protsch - .

CCraig/CThomas OGC

. President' ' RCN (SE only)

lES Utilities Inc. *
200 First Street, SE..

P.O. Box 351 .

. Cedar Rapids, IA 52406-0351-

SUBJECT:

DUANE ARNOLD ENERGY CENTER -ISSUANCE OF AMENDMENT RE: STANDBY GAS TREATMENT INSTRUMENT AIR (TAC NO. MA3868)

Dear Mr. Protsch:

l The U.S. Nuclaar Regulatory Commission has issued the enclosed Amendment No.227 to l

Facility Operating License No. DPR-49 for the Duane Amold Energy Center (DAEC). This -

amendment consists of changes to the Technical Specifications (TS) in response to your l application dated October 15,1998, as supplemented December 21,1998.

j The amendment revises the DAEC TS by adding a new TS 3.7.9, " Control Building / Standby Gas '

' Treatment System (CB/SBGT) Instrument Air System." The amendment also revises TS 3.6.1.3, " Primary Containment Isolation Valves (PCIVs)," Condition E, by adding a time limit for plant operation if a penetration flow path is isolated by a single purge valve with resilient seal.

~ A copy of the related Safety Evaluation is also enclosed. Notice of issuance will be included in l the Commission's next biweekly Federal 3mgiater notice.

Sincerely, Original signed by:

- Brenda L. Mozafari, Project Manager, Section 1 Project Directorate lli Division of Reactor Projects fil/IV Office of Nuclear Reactor Regulation Docket No. 50-331 ,

Enclosures:

1. Amendment No.227to License No. DPR-49
2. Safety Evaluation cc w/encis: See next page DOCUMENT NAME: G:\PDill-1\DUANEARNWMD3868.wpd  % Ne msr chuye b5E!

SC:LPD3 , Jc.: SPLB ,

OFFICE PM:LPD3 - Ei LA:LPD3 6 OGC/

BMozafar42PA EBarnhill ff/' . Mf) {e CCraig '/df-- G h u ml%

NAME DATE- SQf/99 (,If/99 (g/Q/99 4/9/99 s/ft/M I

OFFICIAL RECORD COPY i

p i*

+wsq p k, UNITED STATES

~

! r* 1

} NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 30006 4001 f

.*****j' '

J me 9,.1999 Mr. Eliot Protsch -

President -

IES Utilities Inc.

l 200 First Street, SE.

. P.O. Box 351 Cedar Rapids, IA 52406-0351

SUBJECT:

DUANE ARNOLD ENERGY CENTER - ISSUANCE OF AMENDMENT RE: STANDBY GAS TREATMENT INSTRUMENT AIR (TAC NO. MA3868)

I

Dear Mr. Protsch:

The U.S. Nuclear Regulatory Commission has issued the enclosed Amendment No. 227 to

' Facility Operating License No. DPR-49 for the Duane Arnold Energy Center (DAEC). This 1

amendment consists of changes to the Technical Specifications (TS) in response to your application dated October 15,1998, as supplemented December 21,1998. l The amendment revises the DAEC TS by adding a new TS 3.7.9, ' Control Building / Standby Gas Treatment System (CB/SBGT) Instrument Air System." The amendment also revises TS

. 3.6.1.3, " Primary Containment isolation Valves (PCIVs)," Condition E, by adding a time limit for i plant operation if a penetration flow path is isolated by a single purge valve with resilient seal. ,

A copy of the Safety Evaluation is also enclosed. Notice of Issuance will be included in the Commission's next biweekly Federal Reaister notice.

Sincerely, f ;

r Brenda L. Mozafs:1, Project Manager, Section 1 '

Project Directorate 111 Division of Licensing Project Management I

Office of Nuclear Reactor Regulation L Docket No.' 50-331 l.

Enclosures:

1. Amendment No. 22To -

f f License No. DPR-49

2. Safety Evaluation cc w/encis: See next page o i

Mr. Eliot Protsch Duane Amold Energy Center IES Utilities Inc.

oc-

' Jack Newman, Esquire Al Gutterman, Esquire -

Morgan, Lewis, & Bockius

'1800 M Street, NW.-

Washington, DC 20036 586g -

Chairman, Linn County Board of Supervisors Cedar Rapids,IA 52406 IES Utilities Inc.

ATTN: Gary Van Middlesworth

. Plant Euperintendent, Nuclear 3277 DAEC Road Palo, IA 52324 -

- John F. Franz, Jr.

Vice President, Nuclear Duane Amold Energy Center 3277 DAEC Road Palo,IA 52324 Ken Peveler.

Manager of Regulatory Performance Duane Amold Energy Center 3277 DAEC Road Palo,IA 52324 ,

U.S. Nuclear Regulatory Commission '

Resident inspector's Office Rural Route #1 Palo,IA 52324 Regional Administrator, Rlli U.S. Nuclear Regulatory Commission .

801 Warr.enville Road

' Lisle, IL 80532-4531 Parwoon Baig Utilities Division

. Iowa Department of Commerce Lucas Office Building,5th floor Des Moines,IA 5031g