ML20215M544
| ML20215M544 | |
| Person / Time | |
|---|---|
| Site: | Duane Arnold |
| Issue date: | 10/27/1986 |
| From: | Snell W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Leslie Liu IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT |
| References | |
| NUDOCS 8611030013 | |
| Download: ML20215M544 (1) | |
Text
_ - _ _ _ - _ _ _ _ _ _ _ _ _ _.
OCT 271986 Docket No. 50-331 Iowa Electric Light and Power Company ATTN: Mr. Lee Liu President and Chief Executive Officer IE Towers P. O. Box 351 Cedar Rapids, IA 52406 Gentlemen:
To facilitate planning for the Emergency Response Facility Appraisal Scheduled l
for November 17-21, 1986 at the Duane Arnold Energy Center, attached is a copy l
of the most recent revision (September 22,1986) of the NRC appraisal document.
If you have any questions on this pilot appraisal, please contact me or Mr. T. Ploski of my staff at (3I2) 790-5500, extensions 513 and 529, respectively.
Thank you for your cooperation.
Sincerely, L "nell"-
e I
" Original si p a W William Snell, Chief Emergency Preparedness Section
Attachment:
Draft Inspection Procedure 82412 cc w/o attachment:
D. Mineck, Plant Superintendent Nuclear W. Miller, Assistant Plant Superintendent Technical Support DCS/RSB(RIDS)
Licensing Fee Management Branch 10g[
Resident Inspector, RIII Thomas Houvenagle, Iowa State Commerce Commission i O RIII I RII g' A RIII RI w G.S Ploski/mj Boyd Snell d
r yES f
yn 8611030013 861027 PDR ADOCK 05000331 F
_ _ _ _ - _ _ _ _ _