ML20151Z848

From kanterella
Jump to navigation Jump to search
Confirms Arrangements for Written & Oral Exams Scheduled for Wk of 881219,per Telcon.Encl 1, Ref Matl Requirements for Reactor/Senior Reactor Operator Licensing Exam, Will Have to Be Furnished Prior to Exam in Order to Meet Schedule
ML20151Z848
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 08/23/1988
From: Wright G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Leslie Liu
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
References
NUDOCS 8808300200
Download: ML20151Z848 (10)


Text

.. .-. . .

. AljG 2 3 M89 Docket No. 50-331 Iowa Electric Lignt and Power Company ATTN: Mr. Lee Liu President and~ Chief Executive Officer IE Towers P. O. Box 351 Cedar Rapids, IA 52406 Gentlemen:

SUBJECT:

OPERATOR AND SENIOR OPERATOR LICENSING EXAMINATIONS In a telephone conversation on August 19, 1988, between Mr. John Bjorgen, and Mr. Paul Roy, arrangements were made for the' administration of examinations at the Ouane Arnold Energy Center.

The written and oral examinations are scheduled for the week-of December 19, 1988.

In order for us to meet this schedule, it wil*, be necessary for the facility to furnish the approved reference material listed in Enclosure 1 "Reference Material Requirements for Reactor / Senior Reactor Operator Licensing Examinations" at least 60 days prior to the e.: amination date. Any delay in ,

receiving properly bound and indexed reference material will result in a delay in administering the examinations. 'Our examinations are scheduled far in advance with considerable planning to best utilize our limited examiner manpower and to meet the examination dates requested by the various facilities.  ;

Therefore, missing the deadline, even by a few days, will likely result in a  :

long delay since it may not be possible to reschedule examinations at other facilities. Mr. Roy has been advised of our reference material requirements, the number of reference material sets that are required, and~the examiners' i names and addresses where each set is to be mailed. I The facility management is responsible for providing adequate space and accommodations in order to properly conduct the written examinations.

Enclosure 2, "Administration of Reactor / Senior Reactor Operator Licensing Written Examinations," describes our requirements for conducting these examinations. Mr. Roy has also been informed of there requirements.

Enclosure 3 contains the Rules and Guidance ' hat will be in effect during the administration of the written examination. The facility maragement is responsible for ensuring that all candidates are aware of these Rules.

. - - - ._ .= -

' AUS 2 s 190g Iowa Electric Light and Power 2 l

' Company j

l

-l All reactor operator and senior reae. tor operator license app 1'ications )

should normally be submitted at least 60 days prior to the first examination dates so that we wi', ce able to review.the training and experience of the candidates, process the. medical certifications, and prepare final examiner. assignments after candidate. eligibility has been determined. If the applications are not received at least 30 days prior to the examination dates, it is likely that o postponement will be necessary.

This request for information was approved by.the Office of Management and Budget under Clearance Number 3150-0101, which expires May 31, 1989.

Comments on burden and duplication may be directed to the Office of Management and Budget, Reports Managems.-nt Room 3208, New Executive Office Building, Washington, D.C. 20503.

The facility staff review of the written examination will be conducted in accordance with requirements specified in Enclosure 4, "Requirements for Facility Review of Written Examination." Mr. Roy has been informed of these requirements.

Thank you for your consideration in this matter. If you have u y questions regarding the examination procedures and requirements, please contact John Bjorgen at (312) 790-5559.

Sincerely,

'1ClljAL S!GilED IlY. GE0FREy, C. }yalGilI 1

Geoffrey C. Wright, Chief i Operations Branch

Enclosures:

1. Reference Material Requirements for Reactor / Senior Reactor Operator 3 Licensing Examinations
2. Requirements fo' Administration of Written Examinations
3. NRC Pules and Ouidelines For License Examinations
4. Facility Review Requirements See Attached Distribution RIII III RI t l B' gen / jaw pe khr Jordan Wri

'l 1

AUG 2 3 1989

' Iowa Electric Light nd Power 3 Company Distribution cc w/ enclosures:

R. Hannen, Plant Superintendent - Nuclear R.-Salmon, Technical. Services Superintendent nCD/DCB(RIDS)

Licensing Fee Management Branch Resident Inspector, RIII John A. Eure, Iowa Department of Public Health P. Roy, Plant Training Manager cc w/o enclosures:

1 J, Hall, Project Manager, NRR '

J. Hannon, Branch Chief, OLB I. N. Jackiw, Section Chief, DRP i

i a

l l

l i

I

ENCLOSURE 1 Reference Material Requirements for Reactor / Senior Reactor Operator Licensing Examinations

1. Failure to provide complete, properly bound and indexed plant reference-material will result in canceling and rescheduling of the examinations.
2. Training material should include all substantive written material used for preparing candidates for initial R0 and SR0 licensing.
3. The written material should include learning objectives and the details presented during lectures, rather than outlines- .
4. T.aining material and procedures should be identified by plant and unit along with appropriate indexes or table of contents.
5. The reference material and' procedures should be approved, final issues, and should be so marked.
6. If the facility is in the process of revising some of the material, the material received by the Commission will be used for the examination.
  • Any material under r 9 vision, upon receipt of +.his letter, must be finalized when the recuired material is submitted, t
7. The following training. materials shall be orovided:
a. System descriptions.

System descriptions should include descriptions of all operationally relevant fiow paths, components, controls, and instrumentation.

b. Existing system learning objectives and lesson plans. ,

System training material should draw parallels to the actual  !

procedures used for operating the applicable system.

c. Complete and operationally useful descriptions of all safety-system  !

interactions. l

d. Where available, Balance-of-Plant systam interactions under emergency and abnormal conditions, in luding consequences of anticipated operator error, maintenar<:e error, and equipment failure, j
e. Comprehensive theory material that includes fundamentals in the l area of theory of reactor operations, heat transfer and fluid flow, and specific application to actual in plant components.

f

Enclosure 1- 2-a ,

. Thermodynamics learning objectives and. lesson plans. .  ;

For example, mechanical theory material onipumps should include pump +.heory as well as descriptions-of how these principles ac' ' illy apply to' major-plant pumps and. systems in which they are !nstalled i.e., Reactor Coolant pumps, all ECCS ~ pumps, Recirculation pumps, Feedwater pumps, and Emergency Feedwater..'

pumps.

Reactor theory learning objectives.and lesson plans',

~

For example, Reactor Theory material should include  !

descriptions that draw explicit ties betwien the fundamentals and actual operating limits followed in the plant i.e...

reactor theory material should contain explanations of.how-principles relate to the actual curves used by operators to verify shutdown margin or calculate an ECP.

f. Training manuals.
g. Plant orientation manual. ,
h. Training material and learning objectives used to clarify and strengthen understanding of emergency o'perating-procedures.
1. Procedure index (alphabetical by subject).

J. All applicable reactor operating and safety administrative procedures,

k. A table of contents for all facility administrative procedures,
1. All integrated plant operating procedures (normal and general operating procedures).
m. Emergency procedures (emergency instructions, abnormal or special-procedures).
n. Standing orders (important orders that are safety-related and may supersede the regular procedure).
o. Fuel handling and core loading procedures (initial core loading procedures, when appropriate).
p. Annunciator procedures (alarm procedures, including set points).

Enclosure 1 3

q. Radia' a protection manual (radiation control manual or procedure).
r. Emergency plan implementing procedures.
s. Yschnical specifications,
t. Systee operating procedures.
u. Piping diag.ams or flow charts.
v. Instrumentation diagrams or flow charts,
w. Electrical diagrams or flow charts.
x. Technical data book and/or plant curve information as.used by operators.
y. Facility precautions, limitations and set points.
z. Questions and answers specific to.the facility training program which may be used in the written examination or operating test, respectively (voluntary by the facility),

aa. ECCS system and Operations Department Surveillance procedures required by Technical Specifications.

8. Additional material required by the examiners to develop examinations that meet the requirements of these standards and the regulations. '

i l

l l

1

ENCLOSURE 2 Requirements for Administration of T'ritten Examinations Operator Licensing Branch requirements are:

1. A single room shall be provided for completing the written examination.

The location of this room and supporting restroom facilities shall be such as to prevent contact with all other facility and/or contractor personnel during the duration of the written examination. If necessary, the facility should make arrangements for the use of a suitable room at-a local school, motel, or other building. Obtaining this room is the responsibility of the licensee.

2. Minimum spacing is required to ensure examination integrity as determined by the chief examiner. Minimum spacing should be one candidate per table, with 3 foot spacing between tables. No wall charts, models, and/or other training materials shall be present in the examination room.
3. Suitable arrangements are to be made by the facility if the candidates are to have lunch, coffee, etc. These arrangements shall comply with Item 1 above. These arrangements will be reviewed by the examiner and/or proctor.
4. The facility staff shall be provided a copy of the written examination and answer key after the last candidate has completed and handed in his written examination. The f acility staff shall then have five working days to provide formal written comments with supporting documentation on the examination and answer key to the chief examiner or to the regional office section chief.
5. The facility licensee will provide pads of 8-1/2 x 11" lined paper in unopened packages for each candidate's use in completing the examination.

The examiner will distribute these pads to the candidates. All reference material needed to complete the examination will be furnished by the

, examiner. Candidates can bring pens, pencils, calculators or slide rules into the examination room and no other equipment or reference material will be allowed.

6. Only black ink or dark pencils should be used for writing answers to questions.

l

ENCLOSURE 3 NRC Rules and Guidelines for License Examinations During the administration of this examination the following rules apply:

1. Cheating on the examination means an automatic denial of your application and could result in more severe penalties.

a 2. Restroom trips are to be limited and only one candidate at a time may leave. You must avoid all contacts with anyone outside the examination room to avoid even the appearance or possibility of cheating.

3. Use black ink or dark pencil only to facilitate legible reproductions.
4. Print your name in the blank provided on the cover sheet of the examination.
5. Fill in the date on the cover sheet of the examination (if necessary).
6. Use only the paper provided for answers.
7. Print your name in the upper right-hand corner of the first page of each section of the answer sheet.
8. Consecutively number each answer sheet, write "End of Category ___" as appropriate, start each category on a new page, write on only one side of the paper, and write "Last Page" on the last answer sheet.  !

i

9. Number each answer as to category and number, for example,1.4, 6.3. I
10. Skip at least three lines between each answer. l
11. Separate answer sheets from pad and place finished answer sheets face ,

down on your desk or table.

l

, 12. Use abbreviations only if they are commonly used in facility literature.

13. The point value for each question is indicated in parentheses after the question and can be used as a guide for the depth of answer required.
14. Show all calculations, methods, or assumptions used to obtain an answer to mathematical problems whether indicated in the question or not.
15. Partial credit may be given. Therefore, ANSWER ALL PARTS OF THE QUESTION  ;

AND DO NOT LEAVE ANY ANSWERS BLANK.

16. If parts of the examination are not clear as to intent, ask questions of the examiner only.

j l,

l

-- , . n- --

n.

Enclosure 3 , 2-

17. LYou must sign the statement on.the cover sheet that indicates that the ,

work is your own and you have not received or been given assistance;in completing.the examination. This must be done after the examination has been completed.

18. When you complete your examination, you shall:
a. Assemble your examination as follows:

(1) Exam questions on top.

(2) Exam aids - figures, tables, etc.

(3) Answer pages including figures which are a part of the answer.

b. Turn in your copy of the examination and all pages used to answer the examination questions.
c. Turn in all scrap paper and the balance of the paper that you did not use for answering the questions.
d. Leave the examination area, as defined by the examiner. If after leaving, you are found in this area while the examination is still in progress, your license may be denied or revoked.

4 a

, e r= - . - r e- , -, - - - - ,r----- .- r , --y r,om- - =m- , ----- - --

'l *

' i ENCLOSURE'4 l l

Requirements for Facility Review of. Written Examination l l

1. There shall be no review of the written examination by the facility staff before or during the administration of the. examination. Following the- i adtrinistration of the written examination, the facility staff shall be l provided a marked-up copy of the examination and the answer key.

)

2. The facility will have five (5) working days from the day of the written {

examination is given to provide formal comment submittal. . The submittal i will be made to the responsible Regional Office by the highest level of management for plant operations, e.g., Plant Manager. A copy of the- ,

submittal will be forwarded to the chief examiner, as appropriate. '

Comrcents not submitted within five (5) working days will be considered for inclusion in the grading process on a case by case basis by the Regional Office section chief. Should the comment submittal deadline not be met, a long delay for finalization of the examination results may occur.

3. The following format should be adhered to for submittal of specific comments:
a. Listing of NRC Question, answer.and reference,
b. Facility comment
c. Supporting documentation NOTES: (1) No change to the examination will be made without submittal of complete, current, and approved reference material.

(2) Comments made without a concise facility recommendation a

will not be addressed.

!