Forwards Safety Insp Rept 50-461/85-32 on 850529-0709.No Violations or Deviations Noted
ML20132C824
Person / Time
Site: Clinton Constellation icon.png
Issue date: 07/25/1985
From: Warnick R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gerstner W
ILLINOIS POWER CO.
Shared Package
ML20132C827 List:
References
NUDOCS 8507310010
Download: ML20132C824 (1)


See also: IR 05000461/1985032

Text

, _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

O

.

h

'dDL 251985

Docket No. 50-461

Illinois Power Company

NITN: Mr. W. C. Gerstner

Executive Vice President

500 South 27th Strent

Decatur, Il 62525

.

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. T. P. Gwynn,

W. F. Christianson, and P. L. Hiland of this office on May 29, 1985 through

July 9, 1985, of activities at Clinton Power Station authorized by NRC

Construction Permit No. CPPR-137, and to the discussion of our findings with

Mr. D. P. Hall and others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations or deviations with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosure will be placed in the NRC's Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

" Original si:;ned Ly a. F. Virnick"

R. F. Warnick, Chief

Reactor Projects Branch 1

Enclosure: Inspection Report

No. 50-461/85032(DRP)

cc w/ enclosure:

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Richard Hubbard

Gary N. Wright, Manager

Nuclear Facility Safety

Jean Foy, Prairie Alliance 8507310010 850725

Allen Samelson, Assistant PDR ADOCK 05000461

Attorney General, G PDH

Environmental Control Division

H. S. Taylor, Quality Assurance

Yf3 '