ML20005G752

From kanterella
Jump to navigation Jump to search
Forwards Licensed Operator Proficiency Evaluation Insp Rept 50-443/89-15 on 891127-1201,1214 & 15.No Violations Noted. Six Crews Demonstrated Satisfactory Level of Performance During Operator Proficiency Evaluation
ML20005G752
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 01/08/1990
From: Gallo R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Ellen Brown
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
Shared Package
ML20005G753 List:
References
NUDOCS 9001230036
Download: ML20005G752 (2)


See also: IR 05000443/1989015

Text

-

-

--

-

-

'

i

l

.

'*

..

-

.

.

1

' JAN 0 8 $90 -

Docket'No.'50-443

,

Public Service Company'of New; Hampshire-

?

ATTN: Mrt Edward A. Brown, President

.. and Chief Executive Officer.

.

New Hampshire Yankee Division-

. Post Office Box 300

'

Seabrook, New Hampshire 03874

Gentlemen:

,

Subject:

Inspection Report No.' 50-443/89-15

This refers to the special--licensed operator proficiency evaluation inspection-

conducted by Mr. L.' Briggs of this office on November 27.through December 1,

1989. Also' discussed in this report areithe results'of the December 14 and 15,-

j

-

1989 inspection of your corrective actions taken to address certain Corrective-

"

Action Plan items'which resulted from~ the June 23, 1989-Confirmatory Action

Letter, 89-11.

Both portions of:the inspection were conducted at the simulator

training facility, Seabrook,-New Hampshire. Mr. Briggs discussed the results of-

this 'special inspection with Messrs, D. Moody and B. Drawbridge and others of

your staff on December 1.'and 15..respectively.

.

Areas examined during this inspection are described in the NRC Region I _Inspec-

i

tion Report which is enclosed with this letter. Within these areas, the in--

spection consisted of selective examinations of procedures and representative

records, interviews with personnel,-and observation of all six= operating crews-

performing simulator scenario exercises developed by -the NRC curing the operator

t

proficiency evaluation.

I

We have concluded that all six crews demonstrated a satisfactory level of

f

performance during the-operator proficiency evaluation.

Within the scope of this inspection, no violations were observed.

1

p<

No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

Sincerely,

I

U#iBira1 Sicaog 3 ,

7

!

Robert M. Gallo, Chief

Operations Branch

Division of Reactor Safety

i

Enclosure:

NRC Region I Inspection Report No. 50-443/89-15

,

'

90012 % $ h

f

b

l

_

_.

9

"

, .

,

,

' Public Service Company of New Hampshire 2

4

'

cc w/ enc 1:

- J. C. Duffett, President and Chief Executive Officer, PSNH

T. C. Feigenbaum, Senior Vice President and Chief Operating Officer, NHY

- J. M. Peschel, Operational Programs Manager, NHY

D. E. Moody, Station Manager, NHY

T. Harpster, Director of Licensing Services

R. Hallisey, Director, Dept. of Public Health, Commonwealth- of Massachusetts

S. Woodhouse,-Legislative Assistant

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New Hampshire, SLO

.

!

Commonwealth of Massachusetts, SLO Designee

Seabrook Hearing Service List

.

bec w/ enc 1:

- Region I Docket Room (with concurrences)

T Martin, DRA

',

M. Hodges, DRS

E. McCabe, DRP

J. Johnson,~DRP

SRI - Seabrook (w/ concurrences)

V. Nerses, NRR

K. Abraham, PA0 (20) SALP Reports and All Inspection Reports

'

P. Eselgroth, DRS

'

,

L. Brtgg, DRS

D. Silk, DRS

L. Sherfey, PNL

DRS Files (3)

bec w/o enc 1:

Management Assistant, DRMA

-

vv/

Q

DRS:Rhi[

'

DRS:RI

DR :RI

DRS:RI

DRS:RI.

D 1RI

Briggs /dmg/ajk Eselgro

Gal

'Johnston

Hodges

MartJn

01/.2/90

01/jl /90

-01/ /90

01/y/90

01/f/90 01/f /90

b

-

RA:RI

Russell

01/{/90

l

0FFICIAL RECORD COPY

BNIGGS/SEABROOK 50-443/89-15 - 0001.0.1

01/02/90

s

e

e