ML20043F613

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-443/90-07 on 900305-09.No Violations Observed
ML20043F613
Person / Time
Site: Seabrook 
Issue date: 06/06/1990
From: Hodges M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Ellen Brown
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
Shared Package
ML20043F614 List:
References
NUDOCS 9006150152
Download: ML20043F613 (2)


See also: IR 05000443/1990007

Text

7

e

f,

i

. .

Q

JUll 0 01990

!

Docket No. 50-443

Public Service Company of New Hamp. hire

ATTN: Mr. Edward A.' Brown, President

and Chief Executive Off'cer

New Hampshire Yankee Divisien

Post Office Box 300

Seabrook, New Hampshiro 03874

Gentlemen:

Subject:- Inspection Report 50-443/90-07

This refers to the announced inspection conducted by Mr. Jacque P. Durr of this

office on March 5-9, 1990, at the Seabrook Station, Unit No.1, Seabrook, New

,

Hampshire.

The discussions of our findings were held by Mr. Durr with

!

Mr. T. C. Feigenbaum of.your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I.

inspection report which'is enclosed with this letter. Within.these areas, the

inspection: consisted of selective examinations of procedures and representative

'

records, interviews with personnel, and observations by the inspectors. The

report'also contains as enclosures several of our responses.to Congressional

i

queries concerning construction activities at the Seabrook site.

Within the scope of this inspection, no violations were observed.-

No reply to this letter is required. Your cooperation with us in this matter

I

is appreciated.

Sincerely,

Original G.cncd tly:

Marvin W. Hodges

Marvin W. Hodges, Director

_

Division of Reactor Safety-

Enclosure: NRC Region I Inspection Report Number 50-443/90-07

,

!

0FFICIAL RECORD COPY

IR 50-443/90-07 - 0001.0.0

05/04/90

9006.150152 900606

Ig

PDR

ADOCK 0500044:3

1

O

PDC

g. O)

l

.

-

-

,

[

'

JUN 0 01990

,

..

Public Service Company

2

of New Hampshire

cc w/ encl:

L. E. Maglathlin, Jr., President and Chief Executive Officer, PSNH

T. C. Feigenbaum, Senior Vice President and Chief Operating Officer, NHY

-

J. M. Peschel, Regulatory Compliance, NHY

R. M. Kacich, Manager of Generation Facilities Licensing, NUSCO

J. F. Opeka, Execu+.ive Vice President, NU

G. Garfield, Esquire

D. E. Moody, Station Manager, NHY

T. Harpster, Director of Licensing Services

R. Hallisey, Director, Dept. of Public Health, Commonwealth of Massachusetts

S. Woodhouse, Legislative Assistant

Public Document Room (PDR)

l

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New Hampshire, SLO

Commonwealth of Massachusetts, SLO Designee

Seabrook Hearing Service List

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

R. Bellamy, DRSS

E.'McCabe, DRP

J. Johnson, DRP

N. Dudley, SRI - Seabrook (w/ concurrences)

K. Abraham, PA0 (20) SALP Report and (2) All Inspection Reports

,

J. Caldwell, EDO

V. Nerses, NRR

. - .

.--

-

--

&

{}

f

fp)

RI:DRS

RI:DRP

RI

RP

.DRS

4

Durr

Fuhrme}4ter

Ceptfe

Johnson

Hodges

l/

5/4,/90

5/G /90

5/f7/90

5/))/90

5/jj/90

RIf.RA

Mfrtin

5/ /90

i

0FFICIAL RECORD COPY

SB JD - 0001.0.0

06/07/90