Ro:On 791219,during Analysis Described in IE Bulletin 79-14, Nonconformance Identified in Small Piping Sys.Caused by Discrepancy Between Piping Design & as-built Condition.Mod Being Implemented.Followup Rept Will Be Submitted by 800102
ML17326A452
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 12/20/1979
From: Shaller D
INDIANA MICHIGAN POWER CO.
To:
References
IEB-79-14, NUDOCS 8001070351
Download: ML17326A452 (4)


Text

REGULATORY OHMATION DISTRIBUTION SY M (RIOS)

ACCESSION NBR t 8001070351 DOC ~ DATE t 79/12/20 NOTAH IZED t NO DOCKET PACILt50 316 Donald 0 ~ Cook Nuclear Power Plantr Onit Zi Indiana 8 05000316 AO I H e NAME AUVHOA AFFILIATION SHACCERiD,V, InGiana L Hichigan Power Co ~

AEGIP,NA11E "HEtivIENr aFFIilATIDN

SUBJECT:

Q~ 791219rduring anal ysi nonconformance identified in s described in IK Bulletin small piping sy st Caused by 79 lrli discrepancy between piping design L as built condition,Mod being implementedrfollowup rept by 800102 DISTRIBUTION CQDEt A002S T I TLE: Incident Hepor t s COPIES RECEIVEDtLTH i ENCL aeo S I l- E .t aaeeoaeeeaaee

/

NO>rs ~ Sees W CuS w wwww&%%&&olww&gglw aC C man VZ

~wlow&wtltwwrwtretoksAAa&w4p&ooww'&%I%11~CIApw&~%t%e&w&&SHOIWAI&loswoowoa&

I RKC IP EN COPIES HECIPIKNr COPIES 1'D'CODE/NAME LTTR ENC ID CODE/NAME L'rTA ENCL ACTION: 05 BC OÃ84/

INTERNAL; 0 REG F 1 02 NRC PDR 1 09 2 11 MPA 3 14 TA/EOO 1 15 NOVAK/KNIEL 1 i6 FEB i i7 AD FUR ENGR 1 i8 PE,ANT SYS BH 1 i9 IKC SYS BH 20 AU PLAAT SY8 i HERC SAFf BR i 23 FNGA 'BR" 1 2q KREI'ER 25 PAR SYS BR 1 26 AD/SITE ANAL 1 i 27 OPERA L IC BR 1 28 ACDENT AALY8 1 29 AOX SYS BH E JORDAN/16 HANAOERgS, 1 IRELAND 3 STS CROUP LEADR 1 TM1~H STREET EXTERNALt 03 LPOR OQ NSIC 29 ACRS I S )980 TOTAL NUMBER OF COPIES REQUIRED: LTrR ENCL

I I C

t II I

II,'

I N

N h

Ill I

hh 11,

yet~ INDIANA & NICIIIGAN PD VER CONPA N Y DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 December 20, 1979 Mr. J.G. Keppler, Regional Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Operating License DPR-74 Docket No. 50-316

Dear Mr. Keppler:

This is to confirm our verbal report to NRC Region III Inspector, Mr. R.E. Masse, at 1620 hours0.0188 days <br />0.45 hours <br />0.00268 weeks <br />6.1641e-4 months <br /> on December 19, 1979.

At that time we reported that as part of the inspection and analysis process mandated by IE Bulletin 79-14, a significant non-conformance was identified in a small piping system of Unit 2 of the Cook Plant.

This significant non-conformance arose because of a discrepancy between the piping design analysis and the "as-built" condition. The piping involved is a 1.0" diameter line, connected between the primary piping and the excess let-down heat exchanger. Reanalysis indicated that the 1.0" diameter pipe would be stressed above the yield limit in the unlikely event that the Design Basis Earthquake occurs. The piping system was reanalyzed with two additional restraints and all the stresses were found to be within the code allowable limit. The modification is being imple-mented in the Unit.

A followup report will be submitted by January 2, 1980, as required by Technical Specification Section 6.9.1.8.

Sincerely, D.V. Shaller Plant Manager

/bab cc: J.E. Dolan G. Olson R.S. Hunter J.M. Hennigan R.W. Jurgensen PNSRC R.F. Kroeger J.F. Stietzel R. Kilburn E.L. Townley R.E. Masse RO:III Dir., IE (40 copies)