Monthly Operating Rept for May 1999 for DC Cook Nuclear Plant,Unit 2.With 990609 Ltr
ML17326A007
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 05/31/1999
From: Bakken A, Heurich R, Minor J
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9906160279
Download: ML17326A007 (8)


Text

ATEGORY 1 REGULAT RY INFORMATION DISTRIBUTION% SYSTEM (RIDS)

DOCKET FACIL:50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana 05000316

'a M

AUTO.NAME AUTHOR AFFILIATION MINOR,J.W. Indiana Michigan Power Co.

HEURICH,R.G. Indiana Michigan Power Co.

BAKKEN,A.C. Indiana Michigan Power Co.

RECIP.NAME RECIPIENT AFFILIATION SUB JECT: Monthly operat 1999 for DC Cook Nuclear Plant, Unit .With 990609 ltr.

DXSTRIBUTXON CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

E NOTES:

RECXPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL 0 LPD3-1 PD 1 1 STANG J 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 E CENTER 0 1 1 OC/DBA/PAD 1 1 RGN3 1 1 EXTERNAL: LMITCO MARSHALL 1 1 NOAC 1 1 NRC PDR 1 1 D

U M

NOTE TO ALL "RZDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9

Mgnan,M4%06 616 465 5901 N

INQISlMA NICNICQN PQWM U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 June 9, 1999 Gentlemen:

Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.8, the attached monthly operating report for May 1999 is submitted.

Sincerely, A. C. Bakken, III Site Vice President AB/drm Attachment ANINuclear Engineering Department INPO Records Center NRC Project Manager NRR NRC Region III NRC Resident Inspector P. A. Barrett G. T. Gaffney- Canton D. R. Hahn Department of Health S. Hamming Department of Labor G. John D. F. Kunsemiller B. Lewis McGraw-Hill Companies D. H. Malin T. P. Noonan D. W. Paul Lancaster R. P. Powers Regulatory Licensing Manager M. W. Rencheck W. H. Schalk D. G. Turner eS 0SSS0m9 ADGCK,050003i6 9~053'DR R "

PDR AEP: <<'tmerica's Eaergri'armer"

N.R.C. OPERATING DATA REPORT DOCKET NO. 50-316

~ DATE 6/8/99 COMPLETED BY JW Minor TELEPHONE 616465-5901 OPERATING STATUS

1. Unit Name D. C. Cook Unit 2 Notes:
2. Reporting Period May-99
3. Licensed Thermal Power (MWt) 3411
4. Name Plate Rating (Gross MWe) 1133
5. Design Electrical Rating (Net MWe) 1090
6. Maximum Dependable Capacity (GROSS MWe) 1100
7. Maximum Dependable Capacity (Net MWe) 1060
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
9. Power Level To Which Restricted. If Any (Net MWe)
10. Reasons For Restrictions.

This Mo. Yr. to Date Cumm.

11. Hours in Reporting Period 744.0 3624.0 187704.0
12. No. of Hrs. Reactor Was Critical 0.0 0.0 121771.0
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator on Line 0.0 0.0 118153.4
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Therm. Energy Gen. (MWH) 0.0 0.0 366007650.4
17. Gross Elect. Energy Gen. (MWH) 0.0 0.0 118584640.0
18. Net Elect. Energy Gen. (MWH) 0.0 0.0 114257779.0
19. Unit Service Factor 0.0 '.0 63.7
20. Unit Availability Factor 0.0 0.0 63.7
21. Unit Capacity Factor (MDC Net) 0.0 0.0 58.0
22. Unit Capacity Factor (DER Net) 0.0 0.0 56.5
23. Unit Forced Outage Rate 100.0 100.0 21.4
24. Shutdowns Scheduled over Next Si x Months (Type, Date,and Duration):
25. If Shut Down At End of Report Period, Est'ed Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION

f' I

'j,< ~ ~

)l ~l~

~ a Ct- /

I 8 Tj II

AVERAGE DAILYPOWER LEVEL (MWe-Net)

DOCKET NO. 50-316 UNIT TWO DATE 07-Jun-99 COMPLETED BY JW Minor TELEPHONE 616-465-5901 MONTH May-99 AVERAGE DAILY AVERAGE DAILY DAY POWER LEVEL DAY POWER LEVEL 5/1/99 5/17/99 5/2/99 5/18/99 5/3/99 5/19/99 5/4/99 5/20/99 5/5/99 5/21/99 5/6/99 5/22/99 5/7/99 5/23/99 5/8/99 5/24/99 5/9/99 5/25/99 5/10/99 5/26/99 5/11/99 5/27/99 5/12/99 5/28/99 5/13/99 '/29/99 5/14/99 5/30/99 5/15/99 5/31/99 5/16/99

I f I'.

I 4V ~

yt'4

DOCKET NO. 50-316 UNIT NAME D.C. Cook Unit 2 DATE June 7, 1999 COMPLETED BY RG Heurich TELEPHONE 616-697-5049 PAGE 1 of1 MONTHLYOPERATING ACTIVITIES - May 1999 The unit entered this reporting period in Mode 5 at 0% RTP.

The unit exited this reporting period in Mode 5 at 0% RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross electrical generation for the month of May was 0 MWh.

DEXBKG.

05/01/99 Unit remained shutdown the entire reporting period to resolve design basis questions discovered during the NRC Architect and Engineering (AE)

Inspection.

'll time entries are Eastern Standard Time (EST).

DOCKET NO. 50- 316 UNIT NAME D.C. Cook Unit 2 DATE June 7, 1999 COMPLETED BY RG Heurich TELEPHONE 616-697-5049 PAGE 1 of1 UNIT SHUTDOWNS AND POWER REDUCTIONS May 1999 METHOD OF SHUTI'ING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION O DATE TYPE'OURS REASONS REACTORs REPORT NO CODE'ODEs TO PREVENT RECURRENCE 335 010798 F 744.0 N/A N/A N/A The unit remained shutdown to resolve design basis questions discovered during the NRC Architect and Engineering (AE)

Inspection.

13ZEE: 2JK&SQH: 3bKlt!QD-': M4XSIEh1: IEIMEOHE F: Forced A: Equipment Failure (Explain) Manual Exhibit G - Instructions Exhibit I: Same Source S: Scheduled B: Maintenance or Test 2: Manual Scram for preparation of data C: Refueling 3: Automatic Scram entry sheets for Licensee D: Regulatory Restriction 4: Other (Explain) Event Report (LER) File E: Operator Training and (NUREG 0161)

License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)