Monthly Operating Rept for July 1999 for DC Cook Nuclear Plant,Units 2.With
ML17326A086
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 07/31/1999
From: Bakken A, Pratt M, Richardson S
AMERICAN ELECTRIC POWER CO., INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9908240071
Download: ML17326A086 (48)


Text

REGULA'Y INFORMATION.OISTRIBUTI SYSTEM (RIDS)

FACIL:50-316 Donald C.

Cook Nuclear Power Plant, Unit 2, Indiana M

AUTH.PARE,

~

AUTHOR AFFILIATION PRATT,WM.

American Electric Power Co., Inc.

RICHARDSON,S.A.

American Electric Power Co.', Inc.

BAKKEN,A.C.

American Electric Power Co., Inc.

RECIP.NAME RECIPIENT AFFILIATION DOCKET ¹ 05000316

SUBJECT:

Monthly operat'e t for 1999 for DC Cook Nuclear Plant, Units

.With 990812 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT ID CODE/NAME STANG,J COPIES LTTR ENCL 1

1 RECIPIENT ID CODE/NAME COPIES LTTR ENCL

,0 R

INTERNAL:

LE CENTER 01 1

1 R W/DRM~/OERAB 1

1 EXTERNAL: LMITCO MARSHALL 1

1 NRC PDR 1

1 OC/DBA/PAD RGN3 NOAC 1

1 1

1 1

1 D

0 M5$8L$8

'E NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. 'TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415"2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 8

ENCL 8

American Electric Pjggr Cook Nudear Plant One Cook Place Bridgman, Ml49106 6t64655901 August 12, 1999 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Document Control Manager:

Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for July 1999 is submitted.

Sincerely, Site Vice President ACB/bwo Attachment NRC Region III NRC Project Manager NRR NRC Resident Inspector ANI Nuclear Engineering Department INPO Records Center R. C.

Godley G. T.

Gaffney Canton D. R.

Hahn Department of Health S.

Hamming Department of Labor G.

John B.

Lewis McGraw-Hill Companies D. H.

Malin T. P.

Noonan D. W.

Paul Lancaster J.

E.

Pollock R. P.

Powers Regulatory Licensing Manager M. W.

Rencheck W. H.

Schalk D. G.

Turner 990824007i

'ir'ir073%

PDR,,ADQCK,, 050003ib PDR

N.R.C. OPERATING DATAREPOR DOCKET NO.

DATE COMPLETED BY TELEPHONE 50- 316 August 2, 1999 M. M. Pratt 616-465-5901 OPERATING STATUS

1. Unit Name
2. Reporting Period
3. Licensed Thermal Power (MWt)
4. Name Plate Rating (Gross MWe)
5. Design Electrical Rating (Net MWe)
6. Maximum Dependable Capacity (GROSS M
7. Maximum Dependable Capacity (Net MWe)

D. C. Cook Unit 2 July-99 3411 1133 1090 We) 1100 1060 Notes:

8. IfChanges Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:

9.

Power Level to Which Restricted, IfAny (Net MWe):

10. Reasons For Restrictions, IfAny:
11. Hours in Reporting Period
12. No. of Hrs. Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator on Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Gen. (MWH)
17. Gross Electrical Energy Gen. (MWH)
18. Net Electrical Energy Gen. (MWH)
19. Unit Service Factor
20. Unit AvailabilityFactor
21. Unit Capacity Factor (MDC Net)
22. Unit Capacity Factor (DER Net)
23. Unit Forced Outage Rate This Month 744.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Year-to-Date 5832.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Cumulative 189912.0 121771.0 0.0 118153.4 0.0 366007650.4 118584640.0 114257779.0 63.0 63.0 57.4 55.9 22.5
24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):

None

25. IfShut Down At End of Report Period, Estimated Date of Startup:

A ril2000

26. Units in Test Status (Prior to Commercial Operation):

INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION Forecast Achieved

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50- 316 D.C. Cook Unit 2 August 2, 1999 M. M. Pratt 616-465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)

July 1999 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 7/1/99 7/2/99 7/3/99 7/4/99 7/5/99 7/6/99 7/7/99 7/8/99 7/9/99 7/1 0/99 7/11/99 7/1 2/99 7/13/99 7/1 4/99 7/15/99 7/16/99 7/17/99 7/18/99 7/1 9/99 7/20/99 7/21/99 7/22/99 7/23/99 7/24/99 7/25/99 7/26/99 7/27/99 7/28/99 7/29/99 7/30/99 7/31/99

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50- 316 D.C. Cook Unit 2 August 5, 1999 S. A. Richardson 616-465-5901 1 of1 MONTHLYOPERATING ACTIVITIES-July 1999 HIGHLIGHTS The unit entered this reporting period in Mode 5 at 0% RTP.

The unit exited this reporting period with the core offloaded.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross electrical generation for the month of July was 0 MWh.

DETAILS 07/13/99 At 0110 hours0.00127 days <br />0.0306 hours <br />1.818783e-4 weeks <br />4.1855e-5 months <br />, completed draining of Reactor Coolant System to 619.5 foot elevation (1.5 feet below reactor vessel head flange elevation) in preparation for reactor vessel head removal and subsequent core off loading support activities.

07/13/99 07/15/99 07/24/99 07/27/99 At 1920 hours0.0222 days <br />0.533 hours <br />0.00317 weeks <br />7.3056e-4 months <br />, the unit entered Mode 6 as first reactor head stud was de-tensioned.

At 1630 hours0.0189 days <br />0.453 hours <br />0.0027 weeks <br />6.20215e-4 months <br />, completed flood up of the refueling cavity to support core off loading.

At 0945 hours0.0109 days <br />0.263 hours <br />0.00156 weeks <br />3.595725e-4 months <br />, last fuel assembly removed from the reactor vessel.

At 1845 hours0.0214 days <br />0.513 hours <br />0.00305 weeks <br />7.020225e-4 months <br />, both Train A and Train B Emergency Diesel Generators declared inoperable for Modes 5 and 6 due to inability to meet design basis.

The combustion air intake, combustion exhaust, ventilation intake and ventilation exhaust structures were deemed inadequate in regard to tornado generated missiles.

Alltime entries are Eastern Standard Time (EST).

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50 - 316 D.C. Cook Unit 2 August 5, 1999 S. A-. Richardson 616-46(-5901 1 of1 UNITSHUTDOWNS AND POWER REDUCTIONS July 1999 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT NO.

DATE TYPE'OURS REASON REACTOR REPORT NO.

SYSTEM CODE COMPONENT CODE CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE 333 090897 F

334

~ 101397 S

335 010798 F

162.0 582.0 744.0 97-003 97-004 97-005 N/A N/A N/A N/A N/A N/A N/A N/A The unit was shutdown to resolve design basis questions discovered during the NRC Architect and Engineering (AE) Inspection.

The scheduled refueling outage commenced while the unit has been shutdown to resolve design basis questions discovered during the NRC AE Inspection.

The refueling outage was declared complete, but the unit remained shutdown to resolve design basis questions discovered during the NRC AE Inspection.

1 TYPE:

F: Forced S: Scheduled 2 REASON:

A: Equipment Failure (Explain)

B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain) 3 METHOD:

1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:

Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:

Exhibit I: Same Source

Distribution Sheet Distri61.txt

~-9/(

z/jg+oob Priority: Normal From: Esperanza Lomosbog Action Recipients:

J Stang Internal Recipients:

RidsRgn3MailCenter RidsResDraaOerab RidsOcfoDpbaPab RidsManager RidsAcrsAcnwMailCenter RGN3 RES/DRAA/OERAB OCFO/D CENTER 01 ACRS External Recipients:

NOAC INEEL Marshall Copies:

Paper Copy 0

0 0

OK OK OK OK Paper Copy Paper Copy 0

OK Paper Copy 1

Paper Copy Paper Copy Paper Copy Paper Copy Total Copies:

Item: ADAMS Document Library: ML ADAMS"HQNTAD01 ID: 003694622:1

Subject:

Monthly operating report for February 2000 for D. C. Cook Nuclear Plant, Unit 2. With let ter dated 3/13/00.

Body:

ADAMS DISTRIBUTION-NOTIFICATION.

Electronic Recipients can RIGHT CLICKand OPEN the firstAttachment to View the Document in ADAMS. The Document may also be viewed by searching for Accession Number ML003694622.

Page 1

Distri61.txt lE24-Monthly Operating Report (per Tech Specs)

Docket: 05000316 Page 2

Indiana Michigan Power Company Cook Nuoiear Pearl Ore Cook Plaoo BodgmarL Ml49106 6164666961 INIilkiM NICHlaaQN POWM March 13, 2000 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Document Control Manager:

Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for February 2000 is submitted.

Sincerely, R. C. Godley Regulatory Affairs Director RCG/mbd Attachments ANI Nuclear Engineering Department A. C.

Bakken, III G. T.

Gaffney Canton D. R.

Hahn Department of Health S. Hamming Department of Labor RAF Harris INPO Records Center G.

John B.

Lewis McGraw-HillCompanies D. H.

Malin NRC Project Manager NRR NRC Region III NRC Resident Inspector T.

P.

Noonan D. W.

Paul Lancaster J.

E.

Pollock R. P.

Powers Regulatory Licensing Manager M. W.

Rencheck W. H.

Schalk AElr~Irrrericn's I'rreg> I'arlncr

RC OPERATING DATA REPORT DOCKET NO.

DATE COMPLETED BY TELEPHONE 50- 316 March 6, 2000 J. W. Minor 616-465-5901 OPERATING STATUS

1. Unit Name 2, Reporting Period
3. Licensed Thermal Power (MWt)
4. Name Plate Rating (Gross MWe)
5. Design Electrical Rating (Net MWe)
6. Maximum Dependable Capacity (GROSS M
7. Maximum Dependable Capacity (Net MWe)

D. C. Cook Unit2 Feb-2000 3411 1133 1090 We) 1100 1060 Notes:

8. IfChanges Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:

9.

Power Level to Which Restricted, IfAny (Net MWe):

10. Reasons For Restrictions, IfAny:
11. Hours in Reporting Period
12. No. of Hrs. Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator on Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Gen. (MWH)
17. Gross Electrical Energy Gen. (MWH)
18. Net Electrical Energy Gen. (MWH)
19. Unit Service Factor
20. Unit AvailabilityFactor
21. Unit Capacity Factor (MDC Net)
22. Unit Capacity Factor (DER Net)
23. Unit Forced Outage Rate This Month 696.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Year-to-Date 1440.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Cumulative 194730.0 121771.0 0.0 118153.4 0.0 366007650.4 118584640.0 114257779.0 61.4 61.4 55.9 54.5 24.7
24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):

None

25. IfShut Down At End of Report Period, Estimated Date of Startup:

April2000

26. Units in Test Status (Prior to Commercial Operation):

. INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION Forecast Achieved

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPMONE 50 - 316 D.C. Cook Unit 2 March 6, 2000 J. W. Minor 616-465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)

February 2000 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 2/1/2000 2/2/2000 2/3/2000 2/4/2000 2/5/2000 2/6/2000 2/7/2000 2/8/2000 2/9/2000 2/1 0/2000 2/1 1/2000 2/12/2000 2/13/2000 2/14/2000 2/1 5/2000 2/16/2000 0

0 0

0 0

0' 0

0 0

0 0

0 0

0 0

2/17/2000 2/1 8/2000 2/19/2000 2/20/2000 2/21/2000 2/22/2000 2/23/2000 2/24/2000 2/25/2000 2/26/2000 2/2?/2000 2/28/2000 2/29/2000

DOCKET NO.

UNITNAME DATE COMPLETED BY TELEPHONE PAGE 50 - 316 D.C. Cook Unit'2 March 6, 2000 MB Depuydt 616465-5901 1 of1 UNITSHUTDOWNS AND POWER REDUCTIONS February 2000 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT NO.

DATE TYPE" HOURS REASON>

REACTOR3 REPORT NO.

CODE4 CODE5 CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE 335 010798 F

696.0 N/A N/A N/A The unit remained shutdown to resolve design basis questions identified during the NRC Architect and Engineering (AE)

Inspection.

1 TYPE:

F: Forced S: Scheduled 2 REASON:

A: Equipment Failure (Explain)

B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain) 3 METHOD:

1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:

Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:

Exhibit I: Same Source

\\

Distribution Sheet Distri80.txt

~u/mls Priority: Normal From: Patricia Exum Action Recipients:

Internal Recipients:

RidsRgn3 MailCenter RidsResDraaOerab RidsManager RidsAcrsAcnwMailCenter RGN3 1

RES/DRAA/OERAB OCFOIDPBA

<FILE CENTER 01 ACRS 1

Copies:

1 0

Paper Copy OK OK 0

OK Paper Copy 1

Paper Copy Paper Copy Paper Copy Paper Copy External Recipients:

NOAC INEEL Marshall Paper Copy Paper Copy Total Copies:

Item: ADAMS Document Library: ML ADAMS"HQNTAD01 ID: 003685747:1

Subject:

Forward monthly operating report for January 2000, regarding Donald C. Cook Nuclear Plant unit 2 technical specification 6.9.1.8.

Body:

ADAMS DISTRIBUTION NOTIFICATION.

Electronic Recipients can RIGHT CLICKand OPEN the firstAttachment to View the Document in ADAMS. The Document may also be viewed by searching for Accession Number ML003685747.

Page 1

Distri80.txt lE24 - Monthly Operating Report (per Tech Specs)

Page 2

One Cook Pbce Ml49106 616465961 R

INQIANA NICHIGQN PQWM February 11, 2000 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Document Control Manager:

Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for January 2000 is submitted.

Sincerely,

/&pc+

R. C. Godley Regulatory Affairs Director RCG/mbd Attachments ANI Nuclear Engineering Department A. C.

Bakken, III G. T.

Gaffney Canton D. R.

Hahn Department of Health S. Hamming Department of Labor RAF Harris INPO Records Center G.

John B.

Lewis McGraw-HillCompanies D. H.

Malin NRC Project Manager NRR NRC Region III NRC Resident Inspector T.

P.

Noonan D. W.

Paul Lancaster J.

E.

Pollock R. P.

Powers Regulatory Licensing Manager M. W.

Rencheck W. H.

Schalk

NRC OPERATING DATAREPORT DOCKET NO.

DATE COMPLETED BY TELEPHONE 50 - 316 February 4, 2000 J. W. Minor 616465-5901 OPERATING STATUS

1. Unit Name D. C. Cook Unit 2
2. Reporting Period Jan-2000
3. Licensed Thermal Power (MWt) 3411
4. Name Plate Rating (Gross MWe) 1133
5. Design Electrical Rating (Net MWe) 1090
6. Maximum Dependable Capacity (GROSS MWe) 1100
7. Maximum Dependable Capacity (Net MWe) 1060 Notes:
8. IfChanges Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:

9.

Power Level to Which Restricted, IfAny (Net MWe):

10. Reasons For Restrictions, IfAny:
11. Hours in Reporting Period
12. No. of Hrs. Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator on Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Gen. (MWH)
17. Gross Electrical Energy Gen. (MWH)
18. Net Electrical Energy Gen. (MWH)
19. Unit Service Factor
20. UnitAvailabilityFactor
21. Unit Capacity Factor (MDC Net)
22. Unit Capacity Factor (DER Net)
23. Unit Forced Outage Rate This Month 744.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

.0.0 0.0 0.0 100.0 Year-to-Date 744.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Cumulative 194034.0 121771.0 0.0 118153.4 0.0 366007650.4 118584640.0 114257779.0 61.6 61.6 56.1 54.7 24.4

24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):

None

25. IfShut Down At End of Report Period, Estimated Date of Startup:

A ril 2000

26. Units in Test Status (Prior to Commercial Operation):

INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION Forecast Achieved

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50- 316 D.C. Cook Unit 2 February 4, 2000 J. W. Minor 616465-5901 AVERAGE DAILYPOWER LEVEL (INWe-Net)

January 2000 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 1/1/2000 1/2/2000 1/3/2000 1/4/2000 1/5/2000 1/6/2000 1/7/2000 1/8/2000 1/9/2000 1/10/2000 1/11/2000 1/12/2000 1/1 3/2000 1/14/2000 1/15/2000 1/1 6/2000 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 1/17/2000 1/1 8/2000 1/1 9/2000 1/20/2000 1/21/2000 1/22/2000 1/23/2000 1/24/2000 1/25/2000 1/26/2000 1/27/2000 1/28/2000 1/29/2000 1/30/2000 1/31/2000

DOCKET NO.

UNlTNAME DATE COMPLETED BY TELEPHONE PAGE 50 - 316 D.C. Cook Unit 2 February 8, 2000 MB Depuydt 616-465-5901 1 of1 UNITSHUTDOWNS AND POWER REDUCTIONS January 2000 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT NO.

DATE TYPE'OURS REASON REACTOR REPORT NO.

CODE CODE CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE 335 010798 F

744.0 N/A N/A N/A The unit remained shutdown to resolve design basis questions identified during the NRC Architect and Engineering (AE)

Inspection.

1 TYPE:

F: Forced S: Scheduled 2 REASON:

A: Equipment Failure (Explain)

B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain) 3 METHOD:

1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:

Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:

Exhibit I: Same Source

Distri28.txt Distribution Sheet Priority: Normal From:

Andy Hoy Action Recipients:

J Stang Internal Recipients:

RGN3.

RES/DRAA/OERAB 0

FO/'DP13 FILE CENTER 01 CR External Recipients:

NOAC INEEL Marshall Copies:

1 Paper Copy Paper Copy Paper Copy Paper Copy Paper Copy Paper Copy Paper Copy Paper Copy Total Copies:

Item:

ADAMS Document Library:

ML ADAMS"HQNTAD01 ID: 003677045

Subject:

Monthly operating report for December, 1999 for D C Cook, Unit 2. With letter dated January 14, 2000.

Body:

ADAMS DISTRIBUTION NOTIFICATION.

Electronic Recipients can RIGHT CLICK and OPEN the first Attachment to View the Document in ADAMS.

The Document may also be viewed by searching f or Accession Number ML003677045.

IE24 Monthly Operating Report (per Tech Specs)

Docket:

05000316 Page 1

~ ~

~

One Cook Race Mynen Mi49106 616466961 INlklM NICHIGQN JPQUPM January 14, 2000 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Document Control Manager:

Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for December 1999 is submitted.

Sincerely, R. C. Godley Regulatory Affairs D ctor RCG/mbd Attachments ANI Nuclear Engineering Department A. C.

Bakken, III G. T.

Gaffney-Canton D. R.

Hahn Department of Health S.

Hamming Department ofLabor INPO Records Center G.

John B.

Lewis McGraw-HillCompanies D. H.

Maiin NRC Project Manager NRR NRC Region III NRC Resident Inspector T. P.

Noonan D. W.

Paul Lancaster J.

E.

Pollock R. P.

Powers Regulatory Licensing Manager M. W.

Rencheck W. H.

Schalk D. G.

Turner

DOCKET NO.

DATE COMPLETED BY TELEPHONE 50 - 316 January 5, 2000 J. W. Minor 616-465-5901 OPERATING STATUS

1. Unit Name
2. Reporting Period
3. Licensed Thermal Power (MWt)
4. Name Plate Rating (Gross MWe)
5. Design Electrical Rating (Net MWe)
6. Maximum Dependable Capacity (GROSS M
7. Maximum Dependable Capacity (Net MWe)

D. C. Cook Unit2 Dec-99 3411 1133 1090 We) 1100 1060 Notes:

8. IfChanges Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:

9.

Power Level to Which Restricted, IfAny (Net MWe):

10. Reasons For Restrictions, IfAny:
11. Hours in Reporting Period
12. No. of Hrs. Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator on Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Gen. (MWH)
17. Gross Electrical Energy Gen. (MWH)
18. Net Electrical Energy Gen. (MWH)
19. Unit Service Factor
20. Unit AvailabilityFactor
21. Unit Capacity Factor (MDC Net)
22. Unit Capacity Factor (DER Net)
23. Unit Forced Outage Rate This Month 744.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Year-to-Date 8760.0 0.0 0.0.

0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Cumulative 193290.0 121771.0 0.0 118153.4 0.0 366007650.4 118584640.0 114257779.0 61.8 61.8 56.3 54.9 24.0

24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):

None

25. IfShut Down At End of Report Period, Estimated Date of Startup:

April2000

26. Units in Test Status (Prior to Commercial Operation):

INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION Forecast Achieved

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50- 316 D.C. Cook Unit 2 January 5, 2000 J. W. Minor 616-465-5901

. AVERAGE DAILYPOWER LEVEL (MWe-Net)

December 1999 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 12/1/99 12/2/99 12/3/99 12/4/99 12/5/99 12/6/99 12/7/99 12/8/99 12/9/99 12/10/99 12/11/99 12/12/99 12/13/99 12/14/99 12/15/99 12/16/99 12/17/99 12/18/99 12/19/99 12/20/99 12/21/99 12/22/99 12/23/99 12/24/99 12/25/99 12/26/99 12/27/99 12/28/99 12/29/99 12/30/99 12/31/99

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50- 316 D.C. Cook Unit 2 January 9, 2000 MB Depuydt 616-465-5901 1 of1 UNITSHUTDOWNS AND POWER REDUCTIONS December 1999 DURATION NO.

DATE TYPE'OURS METHOD OF SHUTTING LICENSEE DOWN EVENT SYSTEM COMPONENT REASON2 REACTOR3 REPORT NO.

CODEi CODE CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE 333 090897 F

334 101397 S

335 010798 F

162.0

  • 582.0
  • 744.0 97-003 97-004 97-005 N/A N/A N/A N/A N/A N/A N/A N/A The unit was shutdown to resolve design basis questions disc'overed during the NRC Architect and Engineering (AE)

Inspection.

The scheduled refueling outage commenced while the unit has been shutdown to resolve design basis questions discovered during =.

the NRC AE Inspection.

The unit remained shutdown to resolve design basis questions identified during the NRC Architect and Engineering (AE)

Inspection.

Historical values included for consistency with CNP Unit 1

~EK:

F: Forced S: Scheduled RJRE&SQH:

A: Equipment Failure (Explain)

B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain) 3JdJHHQD:

1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain)

~YGIEh1:

Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161)

Exhibit I: Same Source

1 1

T

i/lHj~o Distri47.txt Distribution Sheet Priority: Normal From: Esperanza Lomosbog Action Recipients:

J Stang Internal Recipients:

RGN 3

RES/DRAA/OERAB OCFO/DPB CENTER 0

External Recipients:

NOAC INEEL Marshall Copies:

1 1

1 1

1

-1 Not Found Not Found Not Found Not Found Not Found Not Found Not Found Not Found Total Copies:

Item:

ADAMS Document Library:

ML ADAMS"HQNTAD01 ID: 003678905

Subject:

Monthly operating report for December 1999 for DE C.

Cook Nuclear Plan t, Unit 2.

With letter dated 1/14/00.

Body:

Docket:

05000316, Notes:

N/A Page 1

Indiana hlichigan Power Company Cocktkdear Aant One Cock Race Mynan.ha 49106 616466690>

Z INDIANA MICHIGAN POWER January 14, 2000 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Document Control Manager:

Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for December 1999 is submitted.

Sincerely, R. C. Godley Regulatory Affairs D ctor RCG/mbd Attachments ANI Nuclear Engineering Department A. C.

Bakken, III G. T.

Gaffney Canton D. R.

Hahn Department of Health S.

Hamming Department of Labor INPO Records Center G.

John B.

Lewis McGraw-HillCompanies D. H.

Malin NRC Project Manager NRR NRC Region III NRC Resident Inspector T. P.

Noonan D. W. Paul-Lancaster J.

E.

Pollock R. P.

Powers Regulatory Licensing Manager M. W.

Rencheck W. H.

Schalk D. G.

Turner

NRC OPERATING DATAREPORT DOCKET NO.

DATE COMPLETED BY TELEPHONE 50- 316 January 5, 2000 J. W. Minor 616465-5901 OPERATING STATUS

1. Unit Name D. C. Cook Unit2
2. Reporting Period Dec-99
3. Licensed Thermal Power (MWt) 3411
4. Name Plate Rating (Gross MWe) 1133
5. Design Electrical Rating (Net MWe) 1090
6. Maximum Dependable Capacity (GROSS MWe) 1100 Notes:
7. Maximum Dependable Capacity (Net MWe) 1060
8. IfChanges Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:

9.

Power Level to Which Restricted, IfAny (Net MWe):

10. Reasons For Restrictions, IfAny:
11. Hours in Reporting Period
12. No. of Hrs. Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator on Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Gen. (MWH)
17. Gross Electrical Energy Gen. (MWH)
18. Net Electrical Energy Gen. (MWH)
19. Unit Service Factor
20. Unit AvailabilityFactor
21. Unit Capacity Factor (MDC Net)
22. Unit Capacity Factor (DER Net)
23. Unit Forced Outage Rate This Month 744.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Year-to-Date 8760.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Cumulative 193290.0 121771.0 0.0 118153.4 0.0 366007650.4 118584640.0 114257779.0 61.8 61.8 56.3 54.9 24.0
24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):

None

25. IfShut Down At End of Report Period, Estimated Date of Startup:

April2000

26. Units in Test Status (Prior to Commercial Operation):

INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION Forecast Achieved

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50-316 D.C. Cook Unit 2 January 5, 2000 J. W. Minor 616465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)

December 1999 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 12/1/99 12/2/99

. 12/3/99 12/4/99 12/5/99 12/6/99 12/7/99 12/8/99 12/9/99 12/10/99 12/11/99 12/12/99 12/13/99 12/14/99 12/15/99 12/16/99 12/17/99 12/18/99 12/19/99 12/20/99 12/21/99 12/22/99 12/23/99 12/24/99 12/25/99 12/26/99 12/27/99 12/28/99 12/29/99 12/30/99 12/31/99 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

DOCKET NO.

UNITNAME DATE COMPLETED BY TELEPHONE PAGE 50- 316 D.C. Cook Unit 2 January 9, 2000 MB Depuydt 616-465-5901 1 of 1 UNITSHUTDOWNS AND POWER REDUCTIONS December 1999 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT NO.

DATE TYPE~

HOURS REASONS REACTORs REPORT NO CODEi CODEs CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE 333 090897 F

334 101397 S

335 010798 F

162.0

'82.0 744.0 97-003 97-004 97-005 N/A N/A N/A N/A N/A N/A N/A NIA The unit was shutdown to resolve design basis questions discovered during the NRC Architect and Engineering (AE)

Inspection.

The scheduled refueling outage commenced while the unit has been shutdown to resolve design basis questions discovered during the NRC AE Inspection.

The unit remained shutdown to resolve design basis questions identified during the NRC Architect and Engineering (AE)

Inspection.

Historical values included for consistency with CNP Unit 1 i3ZEE:

F: Forced S: Scheduled 2JREEGQH:

A; Equipment Failure (Explain)

B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error {Explain)

H: Other (Explain)

XJBEEHQD:

1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain)

~YSIEM:

Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File

{NUREG 0161)

Exhibit I: Same Source

'i 1

Distribution Sheet Distri27.txt Priority: Normal From: Elaine Walker Action Recipients:

J Stang Internal Recipients:

RGN 3 RES/DRAA/OERAB OC/DB E CENTER 01 ACRS Copies:

Not Found Not Found Not Found 1

Not Found Not Found Not Found External Recipients:

NRC PDR NOAC INEEL Marshall Not Found Not Found Not Found Total Copies:

Item: ADAMS Document Library: ML ADAMS"HQNTAD01 ID: 993500238

Subject:

Monthly operating report for November 1999 for D. C. Cook Nuclear Plant, Unit 2. With 9 91208 letter.

Body:

PDR ADOCK 05000316 R Docket: 05000316, Notes: N/A Page 1

indiana Michigan Power Company Cook Nudeas Hant onecooa~

BMymn,Ml461 06 616 465 5901 Ni INQlkftM NlCHIGQN POMFJR December 8, 1999 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Document Control Manager:

Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for November 1999 is submitted.

Sincerely, Pm) UQ R. C. Godley Regulatory Affairs Director RCG/mbd Attachments ANI Nuclear Engineering Department A. C.

Bakken, III G. T.

Gaffney Canton D. R.

Hahn Department of Health S.

Hamming Department of Labor INPO Records Center G.

John B.

Lewis McGraw-HillCompanies D. H.

Malin NRC Project Manager NRR NRC Region III NRC Resident Inspector T. P.

Noonan D. W.

Paul Lancaster J.

E.

Pollock R. P.

Powers Regulatory Licensing Manager M. W.

Rencheck W. H.

Schalk D. G.

Turner

~ O~ pg)(D~L, Q.5QQ DB/4 AEI':America's Eneigl'nrlner

NRC OPERATING DATAREPORT DOCKET NO.

50 - 316 DATE December 3, 1999 COMPLETED BY J. W. Minor TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name
2. Reporting Period
3. Licensed Thermal Power (MWt)
4. Name Plate Rating (Gross MWe)
5. Design Electrical Rating (Net MWe)
6. Maximum Dependable Capacity (GROSS M
7. Maximum Dependable Capacity (Net MWe)

D. C. Cook Unit2 Nov-99 3411 1133 1090 We) 1100 1060 Notes:

8. IfChanges Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:

Power Level to Which Restricted, IfAny (Net MWe):

10. Reasons For Restrictions, IfAny:
11. Hours in Reporting Period
12. No. of Hrs. Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator on Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Gen. (MWH)
17. Gross Electrical Energy Gen. (MWH)
18. Net Electrical Energy Gen. (MWH)
19. Unit Service Factor
20. Unit AvailabilityFactor
21. Unit Capacity Factor (MDC Net)
22. Unit Capacity Factor (DER Net)
23. Unit Forced Outage Rate This Month 720.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Year-to-Date 8016.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Cumulative 192546.0 121771.0

~

0.0 118153.4 0.0 366007650.4 118584640.0 114257779.0 62.1 62.1 56.6 55.1 23.6

24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):

None

25. IfShut Down At End of Report Period, Estimated Date of Startup:

April2000

26. Units in Test Status (Prior to Commercial Operation):

Forecast INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION Achieved

I,

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50 - 316 D.C. Cook Unit 2 December 3, 1999 J. W. Minor 616-465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)

November 1999 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 11/1/99 11/2/99 11/3/99 11/4/99 11/5/99 11/6/99 11/7/99 11/8/99 11/9/99 11/10/99 11/11/99 11/12/99 11/13/99 11/14/99 11/15/99 11/16/99 0

0 0

0 0

0 0

0 0

0 0

,0 0

0 0

0 11/17/99 11/18/99 11/19/99 11/20/99 11/21/99 11/22/99 11/23/99 11/24/99 11/25/99 11/26/99 11/27/99 11/28/99 11/29/99 11/30/99

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50- 316 D.C. Cook Unit 2 December 6, 1999 S. Cherba 616-465-5901 1 of1 UNITSHUTDOWNS AND POWER REDUCTIONS November 1999 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT O.

DATE TYPE'OURS REASON2 REACTOR3 REPORT NO.

CODEi CODE5 CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE 333 090897 F

162.0 97-003 97-004 97-005 N/A N/A The unit was shutdown to resolve design basis questions discovered during the NRC Architect and Engineering (AE)

Inspection.

334 101397 S

582.0 N/A N/A N/A The scheduled refueling outage commenced while the unit has been shutdown to resolve design basis questions discovered during the NRC AE Inspection.

335 010798 F

720.0 N/A N/A N/A The unit remained shutdown to resolve design basis questions identified during the NRC Architect and Engineering (AE)

Inspection.

1 TYPE:

F: Forced S: Scheduled 2 REASON:

A: Equipment Failure (Explain)

B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain) 3 METHOD:

1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:

Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:

Exhibit I: Same Source

Cp

Distribution Sheet Distri21.txt Priority: Normal From: Stefanie Fountain Action Recipients:

J Stang Internal Recipients:

RGN 3.

RES/DRAA/OERAB OC/DB IPAD LEG~fg~

ACRS Copies:

Not Found Not Found 1

Not Found Not Found 1

Not Found Not Found External Recipients:

NRC PDR NOAC INEEL Marshall Not Found Not Found Not Found Total Copies:

Item: ADAMSDocument Library: ML ADAMS"HQNTAD01 ID: 993250002

Subject:

Monthly Operating Report for October 1999 for D. C. Cook Nuclear Plant, Unit 2.With No vember 9, 1999 Letter.

Body:

PDR ADOCK05000316 R Docket: 05000316, Notes: N/A Page 1

r'

One Ca%Place Ndgnan.ul 49106 6t6456901 g

'S INQlAN8l MfCNICRQM PQYi/M November 9, 1999 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Document Control Manager:

Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for October 1999 is submitted.

Sincerely, R. C. Godley Regulatory Affairs Director RCG/mbd Attachment NRC Region III NRC Project Manager-NRR NRC Resident Inspector ANI Nuclear Engineering Department INPO Records Center A. C.

Bakken, III G. T.

Gaffney-Canton D. R.

Hahn Department of Health S.

Hamming Department of Labor G.

John B.

Lewis McGraw-HillCompanies D. H.

Malin T. P.

Noonan D. W.

Paul Lancaster J.

E.

Pollock R. P.

Powers Regulatory Licensing Manager M. W.

Rencheck W. H.

Schalk D. G.

Turner g~Q hi4 I~

AEP:~Iirierlcn's Eaerg> Inrlner

NRC OPERATING DATAREPORT DOCKET NO.

DATE COMPLETED BY TELEPHONE 50- 316 November 4, 1999 J. W. Minor 616-465-5901 OPERATING STATUS

1. Unit Name
2. Reporting Period
3. Licensed Thermal Power (MWt)
4. Name Plate Rating (Gross MWe)
5. Design Electrical Rating (Net MWe)
6. Maximum Dependable Capacity (GROSS M
7. Maximum Dependable Capacity (Net MWe)

D. C. Cook Unit2 Oct-99 3411 1133 1090 We) 1100 1060 Notes:

8. IfChanges Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:

9.

Power Level to Which Restricted, IfAny (Net MWe):

10. Reasons For Restrictions, IfAny:
11. Hours in Reporting Period
12. No. of Hrs. Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator on Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Gen. (MWH)
17. Gross Electrical Energy Gen. (MWH)
18. Net Electrical Energy Gen. (MWH)
19. Unit Service Factor
20. Unit AvailabilityFactor
21. Unit Capacity Factor (MDC Net)
22. Unit Capacity Factor (DER Net)
23. Unit Forced Outage Rate This Month 744.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Year-to-Date 7320.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Cumulative 191850.0 121771.0 0.0 118153.4 0.0 366007650.4 118584640.0 114257779.0 62.3 62.3 56.8 55.3 23.3
24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):

None

25. IfShut Down At End of Report Period, Estimated Date of Startup:

April2000

26. Units in Test Status (Prior to Commercial Operation):

INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION Forecast Achieved

DOCKET NO.

UNITNAME DATE COMPLETED BY TELEPHONE 50- 316 D.C. Cook Unit 2 November 4, 1999 J. W. Minor 616-465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)

October 1999 DAY 10/1/99 10/2/99 10/3/99 10/4/99 10/5/99 10/6/99 10/7/99 10/8/99 10/9/99 10/10/99 10/11/99 10/12/99 10/13/99 10/14/99 10/15/99 10/16/99 AVERAGE DAILY POWER LEVEL DAY 10/17/99 10/18/99 10/19/99 10/20/99 10/21/99 10/22/99 10/23/99 10/24/99 10/25/99 10/26/99 10/27/99 10/28/99 10/29/99 10/30/99 10/31/99 AVERAGE DAILY POWER LEVEL 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

DOCKET NO.

UNITNAME DATE COMPLETED BY TELEPHONE PAGE L

50- $18 D.C. Cook Unit 2 November 5, 1999 S. A. Richardson 616465-5901 1 of1 UNITSHUTDOWNS AND POWER REDUCTIONS October 1999 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT NO.

DATE TYPE" HOURS REASON>

REACTOR>

REPORT NO.

CODE4 CODE5 CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE 333 090897 F

334 101397 S

162.0 582.0 97-003 97-004 97-005 N/A N/A N/A N/A N/A The unit was shutdown to resolve design basis questions discovered during the NRC Architect and Engineering (AE)

Inspection.

The scheduled refueling outage commenced while the unit has been shutdown to resolve design basis questions discovered during the NRC AE Inspection.

335 010798 F

744.0 N/A N/A N/A The unit remained shutdown to resolve design basis questions identified during the

. NRC Architect and Engineering (AE)

Inspection.

1 TYPE:

F: Forced S: Scheduled 2 REASON:

A: Equipment Failure (Explain)

B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain) 3 METHOD:

1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:

ExliibitG - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:

Exhibit I: Same Source