Text
~ ~
CATZaoar Z
REGULA'I INFORMATION DISTRIBUTIO
. YSTEM (RIDS)
ACCESSION NBR:9905200021 DOC.DATE: 99/04/30 NOTARIZED: NO FACIL:50-316 Donald C.
Cook Nuclear Power Plant, Unit 2, Indiana M
AUTH.NAME AUTHOR AFFILIATION MINOR,J.W.
American Electric Power Co., Inc.
GORA,P.J.'merican Electric Power Co.; Inc.
COOPER,D.E.
American Electric Power Qo., Inc.
RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000316
SUBJECT:
Monthly operating rept for Apr 1999 for DC Cook Nuclear Plant, Unit 2.With 990508 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR I
ENCL I
SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
E RECIPIENT ID CODE/NAME LPD3-1 PD INTERNAL: AEOD/SPD/RRAB OC/DBA/PAD EXTERNAL: LMITCO MARSHALL NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME STANG, J NOAC COPIES LTTR ENCL 1
1 1
1 1
1 1
'1 0
D 0
E N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE.'TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATIONS CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 9
ENCL" 9
American Electric P Bidgmn, M149106 616456901 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 May 8, 1999 Gentlemen:
Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for the Month of April 1999 is submitted.
Sine ely D.E. Cooper Plant Manager
/jc Attachment NRC Region III NRC Project Manager NRR NRC Resident Inspector INPO Records Center ANI Nuclear Engineering Department R.P. Powers A.C. Bakken III D.F. Kunsemiller M.W. Rencheck P.A. Barrett Regulatory Licensing Manager D.H. Malin W.H. Schalk D.G. Turner G. John D.R.,Hahn Department of Health S. Hamming Department of Labor B. Lewis McGraw-Hill Companies G.T. Gaffney - Canton D.W. Paul - Lancaster 990520002%
990430 PDR ADOCK 050003i6 R
PDR AEP: <<Interica's Energt I'arlller
.R.C. OPERATING DATA REPORT
~
~
DOCKET NO.
DATE COMPLETED BY TELEPHONE 50- 316 May 7, 1999 JW Minor 616465-5901 OP ERATING STATUS
- 1. Unit Name
- 2. Reporting Period
- 3. Licensed Thermal Power (MWt)
- 4. Name Plate Rating (Gross MWe)
- 5. Design Electrical Rating (Net MWe)
- 6. Maximum Dependable. Capacity (GROSS M
- 7. Maximum Dependable Capacity (Net MWe)
D. C. Cook Unit2 Apr-99 3411 1133 1090 We) 1100 1060 Notes:
- 8. IfChanges Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
9.
Power Level To Which Restricted, IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
- 11. Hours in Reporting Period
- 12. No. of Hrs. Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator on Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Gen. (MWH)
- 17. Gross Electrical Energy Gen. (MWH)
- 18. Net Electrical Energy Gen. (MWH)
- 19. Unit Service Factor
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (MDC Net)
- 22. Unit Capacity Factor (DER Net)
- 23. Unit Forced Outage Rate This Month 720.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Year-to-Date 2880.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Cumulative 186960.0 121771.0 0.0 118153.4 0.0 366007650.4 118584640.0 114257779.0 64.0 64.0 58.3 56.8 21.0
- 24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):
None
- 25. IfShut Down At End of Report Period, Estimated Date of Startup:
To be Determined.
- 26. Units in Test Status (Prior to Commercial Operation):
INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION Forecast Achieved
DOCKET NO.
UNIT NAME
,DATE COMPLETED BY TELEPHONE 50- 316 D.C. Cook Unit 2 May 7, 1999 JW Minor 616-465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)
April 1999 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 4/1/99 4/2/99 4/3/99 4/4/99 4/5/99 4/6/99 4/7/99 4/8/99 4/9/99 4/10/99 4/11/99 4/12/99 4/13/99 4/14/99 4/15/99 4/16/99 4/17/99
'4/18/99 4/19/99 4/20/99 4/21/99 4/22/99 4/23/99 4/24/99 4/25/99 4/26/99 4/27/99 4/28/99 4/29/99 4/30/99
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50- 316 D.C. Cook Unit 2 May 7, 1999 PJ Gora 616-697-5765 1 of1 HIGHLIGHTS MONTHLYOPERATING ACTIVITIES-April 1999 The unit entered this reporting period in Mode 6 at 0% RTP.
The unit exited this reporting period in Mode 5 at 0% RTP.
There were no challenges to the pressurizer safety valves or power operated relief valves.
Gross electrical generation for the month of Aprilwas 0 MWh.
DETAILS 04/01/99 Unit remained shutdown the entire reporting period to resolve design basis questions discovered during the NRC Architect and Engineering (AE)
Inspection.
Alltime entries are Eastern Standard Time (EST).
DOCKET NO.
UNITNAME DATE COMPLETED BY TELEPHONE PAGE 50- 316 D.C. Cook Unit 2 May 7, 1999 PJ Gora 616-697-5765 1 of1 UNlT SHUTDOWNS AND POWER REDUCTIONS - April 1999 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT NO.
DATE TYPE" HOURS REASON2 REACTOR3 REPORT NO.
CODE4 CODE5 CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE 335 010798 F
720.0 N/A N/A N/A The unit remained shutdown to resolve design basis questions discovered during the NRC Architect and Engineering (AE)
Inspection.
1 TYPE:
F: Forced S: Scheduled 2 REASON:
A: Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 3 METHOD:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:
Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:
Exhibit I: Same Source