Special Rept:On 870610,seismic Monitoring Sys Triggered Due to Seismic Event.Calibr of Reactor Pit SMA Detector Completed on 870626.Detector to Be Declared Operable on 870711.Remaining Detectors to Be Calibr by 870727
ML17325A218
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 07/17/1987
From: Will Smith
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Davis A
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8707270211
Download: ML17325A218 (6)


Text

Si C

RE(;VLATOWINFORMATION DISTRIBUTION T'STEM (R IDS)

ACCFSBION NBR; 8707270211 DQC. DATE: 87/07/17 NOTARIZED:

NQ DOC V<ET T<l FACIL: 50-315 Donald C.

Cook Nuc lear Poeer Plant Unit 1

Indiana 0

05000315 50316 Donal d C.

Cook Nuclear PoU!er Plant<

Unit 2 Indiana f'.

0500031!'2

'UTH. NAM!=.

AUTHOR AFFIl IATION BMI TH< A. (

indiana

~c Michigan Electric Co.

REC IP. NAf"lE RECIPIENT AFFiLIATION Document Control Branch (Document Control Desk)

SUBJECT:

Special rept: on 870610< seismic monitoT ing sos triggered due to seismic event. Galibr of reactor pit SMA detector completed on 870626. Detector to be declared operable on 870711. Remaining detectors to be calibr bg 870727.

DISTRIBUTION CODE.:

IE22D COPIES RECEIVED: LTR ~ ENCL +

SIZE:

TITLE:

50. 73-Licensee Event Report (LER)

< Incident Rpt<

etc.

NOTES:

REC IP lEN 1 ID (".QIDE/NAIIf=

PD3-3 LA WI C-'(-.' N(,Qf;D INTERNAL:

ACRB MICHr i BON AEOD/DQA AEOD/l)BP/R AB DEDRQ NRR/DEBT/ADB WRR/DEBT/Ei NRR/DEBT/MEB NRR/DESl/PBB NRR/DES!/BOB NRR/DLPG/GAB NRR/DREP/fKAB NRP

"'<~li R15 f7E('

ILf'c~

RE TELFORD< J R('N3 F ILE 0<

CQP IEB LTTR ENCL 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD3-3 PD ACRS MOELLER AEOD/DSP/NAS AEQD/DBP/TPAB NRR/DEBT/ADE NRR/DEBT/CE13 NRR/DEBT/ ICSB NRR/DEBT/MTB NRR/DEBT/RBB'RR/DLPG/HFB NRR/DOEA/EAB NRR/DREP/RPH NRR/PMAB/PTSB RES DEPY GI REB/DE/E I8 COPIES LTTR ENCL 1

1 1

1 1

1 1

1 f"XTERNAl.

E('< (P'..'!~<< ~

LPDR NSIC HARRIS< 3 H ST LOBBY (JARD NRC PDR NBIC MAYS< ("

TOTAL INCUMBER QF CQP IES REQUIRED; LTTR 45 ENCL

k

cplcdc

/+lcctric INDIANA5 MICHIGANEI.ECTRIC CONPANY DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Brld9emen, Ml 49106 Tefephone (616) 465 5901 July 17, 1987 Donald C.

Cook Nuclear Plant Units 1 and 2

Docket Nos.

50-315 and 50-316 License Nos.

DPR-58 and DPR-74 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.

20555 Attention: A. B. Davis In accordance with Technical Specification (T/S) 3.3.3.3.b this special report is being submitted to inform you that, seismic monitoring instruments have been inoperable for more than 30 days.

On June 10, 1987, the seismic monitoring system triggered as a result of a seismic event that occurred in Lawerenceville, Illinois.

In accordance with T/S 4.3.3.3.2, a special report was submitted to your office describing the measured activity and effects on the plant.

T/S 4.3.3.3.2 also requires 'that each of the seismic monitoring instruments, activated during a seismic event, be restored to operable status and the applicable channel calibrations performed.

A channel calibration was performed on Peak Recording Accelerograph (PRA) detectors, new tapes were installed and the functional test procedure performed to declare them operable.

New tapes were also installed in the Strong Motion Triaxial Accelerograph (SMA) detectors at which time they were returned to a functional -con-figuration, while remaining technically inoperable pending the completion of the T/S required channel calibration.

The calibra-tion of the SMA detectors was not performed due to the inaccessi-bility of the Reactor Pit Detector and the unavailability of the vendor who'performs the calibration.

8707270211 870717 PDR ADOCK OSOOO315 S

PDR

0 I

On June 26,

1987, D. C.

Cook Unit 1 was shut down for refueling.

After containment

cleanup, the calibration of the reactor pit SMA detector was completed.

The test procedure was performed and the detector was declared operable on July 11, 1987.

The remaining T/S detectors are scheduled to be calibrated the week of July 27, 1987.

Sincerely, L<+/

W.

G. Smith, Jr.

Plant Manager WGS:afh cc:

J.

E. Dolan M. P. Alexich R. F. Kroeger H. B. Brugger NRC Resident Inspector R.

C. Callen G. Charnoff, Esq.

D. Hahn Records

Center, INPO PNSRC A. A. Blind Dottie Sherman, ANI Library A. B. Davis, Region III D. L. Wigginton, NRC J.

G. Feinstein/B.

P.

Lauzau