Monthly Operating Rept for Feb 1999 for DC Cook Nuclear Power Station,Unit 2.With 990308 Ltr
ML17325B463
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 02/28/1999
From: Center J, Cooper D, Minor J
AMERICAN ELECTRIC POWER CO., INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9903230308
Download: ML17325B463 (6)


Text

REGULAT Y INFORMATION DISTRIBUTIO YSTEM (RIDS)

ACCESSION NBR:9903230308 DOC.DATE: 99/02/28 NOTARIZED: NO DOCKET FACXL:50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana M 05000316 AUTH.%TWICE. 6 - AUTHOR AFFILIATION MINOR,J.W. American Electric Power Co., Inc.

CENTER,J.h'. American Electric Power Co., Inc.

COOPER,D.E.'merican Electric Power Co., Inc.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Feb 1999 for DC Cook Nuclear Power Station, Unit 2 ltr.

DISTRXBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD3-3 PD 1 1 STANG,J 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 E CENWR "l 1 1 OC/DBA/PAD 1 1 RGN 1 1 EXTERNAL: LMITCO MARSHALL 1 1 NOAC 1 1 NRC PDR 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9

American Electric Cook Ntdear Rant One Cook Raoe

~

nrittgnan, MI491 06 6164655901 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 March 8, 1999 Gentlemen:

Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for the Month of February 1999 is submitted.

Sine ely

.E. Cooper Plant Manager

/jc Attachment C NRC Region III NRC Project Manager NRR NRC Resident Inspector INPO Records Center ANI Nuclear Engineering Department R.P. Powers A.C. Bakken III D.F. Kunsemiller M.W. Rencheck P.A. Barrett Regulatory Licensing Manager D.H. Malin W.H. Schalk D.G. Turner G.John D.R. Hahn Department of Health S. Hamming Department of Labor essed )

B. Lewis McGraw-Hill Companies G.T. Gaffney - Canton D.W. Paul - Lancaster R

9'rr03230308 'rr90228 PDR ADDCK OSOOOM6 '),"

V'VVV PDR AEP: <<Irlerica's Eaerg>arlrrer

N.R.C. OPERATING DATA REPORT DOCKET NO. 50 - 316 DATE March 5, 1999 COMPLETED BY JW Minor TELEPHONE 616-465-5901 OPERATING STATUS Notes:

1. Unit Name D. C. Cook Unit2
2. Reporting Period Feb-99
3. Licensed Thermal Power (MWt) 3411
4. Name Plate Rating (Gross MWe) 1133
5. Design Electrical Rating (Net MWe) 1090
6. Maximum Dependable Capacity (GROSS MWe) 1100
7. Maximum Dependable Capacity (Net MWe) 1060
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Year-to-Date Cumulative

11. Hours in Reporting Period 672.0 1416.0 185496.0
12. No. of Hrs. Reactor Was Critical 0.0 0.0 121771.0
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator on Line 0.0 0.0 118153.4
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Gen. (MWH) 0.0 0.0 366007650.4
17. Gross Electrical Energy Gen. (MWH) 0.0 0.0 118584640.0
18. Net Electrical Energy Gen. (MWH) 0.0 0.0 114257779.0
19. Unit Service Factor 0.0 0.0 64.5
20. Unit Availability Factor 0.0 0.0 64.5
21. Unit Capacity Factor (MDC Net) 0.0 0.0 58.8
22. Unit Capacity Factor (DER Net) 0.0 0.0 57.2
23. Unit Forced Outage Rate 100.0 100.0 20.2
24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):

None

25. If Shut Down At End of Report Period, Estimated Date of Startup:

To be Determined.

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION

DOCKET NO. 50- 316 UNIT NAME D.C. Cook Unit 2 DATE March 5, 1999 COMPLETED BY JW Minor TELEPHONE 616-465-5901, AVERAGE DAILYPOWER LEVEL (MWe-Net)

February 1999 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER LEVEL POWER LEVEL 2/1/99 0 2/17/99

. 2/2/99 0 2/18/99 2/3/99 0 2/19/99 2/4/99 0 2/20/99 2/5/99 0 2/21/99 2/6/99 0 2/22/99 2/7/99 0 2/23/99 2/8/99 0 2/24/99 2/9/99 0 2/25/99 2/1 0/99 0 2/26/99 2/1 1/99 0 2/27/99 2/12/99 0 2/28/99 2/1 3/99 0 2/14/99 0 2/1 5/99 0 2/1 6/99 0

DOCKET NO. 50-316 UNIT NAME D.C. Cook Unit 2 DATE March 5, 1999 COMPLETED BY JF Center TELEPHONE 616-697-5098 PAGE 1 of1 MONTHLYOPERATING ACTIVITIES - February 1999 HIGHLIGHTS The unit entered this reporting period in Mode 6 at 0% RTP.

The unit exited this reporting period in Mode 5 at 0% RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross electrical generation for the month of February was 0 MWh.

DETAILS 02/01/99 Unit remained shutdown the entire reporting period to resolve design basis questions discovered during the NRC Architect and Engineering (AE)

Inspection.

All time entries are Eastern Standard Time (EST).

DOCKET NO. 50- 316 UNIT NAME DC Cook Unit2 DATE March 5, 1999 COMPLETED BY JF Center TELEPHONE 616-697-5098 PAGE 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - February 1999 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE'OURS REASON REACTOR REPORT NO. CODE CODE TO PREVENT RECURRENCE 335 010798 F 672.0 N/A N/A N/A The unit remained shutdown to resolve design basis questions discovered during the NRC Architect and Engineering (AE)

Inspection.

1 TYPE: 2 REASON: 3 METHOD: 4 SYSTEM: 5 COMPONENT:

F: Forced A: Equipment Failure (Explain) 1: Manual Exhibit G - Instructions Exhibit I: Same Source S: Scheduled 8: Maintenance or Test 2: Manual Scram for preparation of data C: Refueling 3: Automatic Scram entry sheets for Licensee D: Regulatory Restriction 4: Other (Explain) Event Report (LER) File E: Operator Training and (NUREG 0161)

License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)