Text
REGULA Y INFORMATION DISTR IBUTIOI YBTEM (BIDS)
ACCESSION NOR: 8707170229 DQC. DATE: 87/07/09 NQTARIZED:
NO DOCKET ¹ FAGIL: 50-315 Donald C.
Cook Nuc lear Power P lant Unit 1
Indiana 5
05000315 50-316 Donald C.
Cook Nuclear Poeer Plant Unit 2 Indiana 5
05000316 AUTH. NAME AUTHOR AFFILIATION SMITHS'. G.
Indiana 5 Michigan Electric Co.
RECIP. NAME RECIPIENT AFFILIATION DAVIS'. H.
Document Control Branch (Document Control Desk)
SUBJECT:
RQ: on 870709'ire suppression eater sos declared inoperable due to planned isolation required to facilitate installation of fire protection supply piping. Installation expected to be comp 1 eted with in 30 day s 5 sos returned to svc by 870808.
DISTRIBUTION CODE:
A006D COPIES RECEIVED: LTR Q ENCL ~
SIZE:
TITLE: OR/Licensing Submittal: Fire Protection NOTES:
RECIPIENT ID CODE/NAME PD3-3 L*
WIGGINGTONi D INTERNAL: ARM/DAF/LFMB NRR WHITNEY' NRR/DEBT/PSH 01 EXTERNAL:
LPDR NSIC COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD3-3 PD NRR WERMEILa J NRR/DEST/*DB OGC/HDS1 RES/DE/EIB NRC PDR COPIES LTTR ENCL 1
1 1
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 18 ENCL
Ae If
'A Q t
~ merk:en
/+tee~
Myste llVDIAIVA8r MICHIGAIVfEIECTRIC COMPAIVY Donald C. Cook Nuclear Plant P.O. Box 456, Bridgman, Michigan 49106 July 9, 1987 Donald C.
Cook Nuclear Plant Unit Nos.
1 and 2
Docket Nos.
50-315 and 50-316 License Nos.
DPR-58 and DPR-74 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.
C.
20555 Attn:
A. B. Davis
Dear Mr. Davis:
This is to confirm a verbal report made to Mr. Bruce Burgess of your staff 0921 hours0.0107 days <br />0.256 hours <br />0.00152 weeks <br />3.504405e-4 months <br /> on July 9, 1987. At that time Mr. Burgess was informed, that the Fire Suppression Water System was not operable as required by Technical Specification 3.7.9.l.b due to the planned isolation of a portion of the east and south legs of the outside fire protection ring header.
This isolation was required to facilitate installation of fire protection supply piping to the new contractors access control building that is being constructed for the Steam Generator Replacement Project.
The installation of the Fire Protection piping is expected to be
.completed within thirty days and the Fire Protection System returned to service by August 8, 1987.
No safety related Fire Protection Systems were removed from service due to the isolation of this section of Fire Protection piping.
Backup fire protection is available from nearby fire hydrants and the plant fire truck.
This letter will fulfillthe requirements of Technical Specification 3.7.9.1 action b.2b which requires a follow up report within twenty-four hours of the telephone call to Region III and Technical Specification 3.7.9.1 action b.2c that requires a follow up report within fourteen days.
Respectfully, W.
G. Smith, Jr.
Plant Manager
/krb cc:
See attached distribution list.
5000~>5 7070~
I pools l.
I I
I II
cc:
A. B. Davis, Region III D. L. Wigginton, NRC J.
E. Dolan M. P. Alexich R. F. Kroeger H. B. Brugger R.
W. Jurgensen NRC Resident Inspector R. C.,Callen, MPSC G. Charnoff, Esq.
D. Hahn, MDPH INPO PNSRC Dottie Sherman, ANI Library J.
G. Feinstein/B.
P.
Lauzau A. A. Blind File