REGULAT dY INFORMATION DISTRIBUTIO SYSTEM (RIDS)

-N DOCKET ¹ FACIL:50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana M 05000316

) AU~~H.NAME AUTHOR AFFILIATION PRATT,M.M. Indiana Michigan Power Co.

BAKKEN,A.C Indiana Michigan Power Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operatin ' June 1999 for DC Cook Nuclear Plant, Unit .With 990709 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES I REC 5'.I ENT COPIES ID CODE/NAME LTTR EiVCL ID CODE/NAME LTTR ENCL STANG,J 1 1 0 INTERNA . FILE CENTE 1 1 OC/DBA/PAD 1 1 S/DRXA OE 1 1 RGN3 1 1 EXTERNAL: LMITCO MARSHALL 1 1 NOAC 1 .1 NRC PDR 1 1 D

0 C

M

'E N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.*TO HAVE YOUR, NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATIONS CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 8 ENCL 8

0 rrl 4806 616 465 5901 FI ENEMAS NICNlCQN PQWM July 9, 1999 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Document Control Manager:

Pursuant to the requirements of Donald C; Cook Nuclear Piant Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for June 1999 is submitted.

Sincerely, A. Christopher Bakken, III Site Vice President ACB/bwo Attachment c: NRC Region III NRC Project Manager NRR NRC Resident Inspector ANI Nuclear Engineering Department INPO Records Center G. P. Arer t G. T. Gaffney Canton D. R. Hahn Department of Health S. Hamming Department of Labor G. John B. Lewis McGraw-Hill Companies D. H. Malin T. P. Noonan D. W. Paul Lancaster J. E. Pollock R. P. Powers Regulatory Licensing Manager M. W. Rencheck W. H. Schalk D. G. Turner V907'200aie 990630 F PDR ADQCK 050003i6

.~t rf,SL f/'EP:

Arrrerica's Erregl Parlrrer

.R.C. OPERATING DATA REPORT

~ ~

DOCKET NO. 50 - 316 DATE July 1, 1999 COMPLETED BY M. M. Pratt TELEPHONE 616-465-5901 OPERATING STATUS Notes:

1. Unit Name D. C. Cook Unit 2
2. Reporting Period Jun-99
3. Licensed Thermal Power (MWt) 3411
4. Name Plate Rating (Gross MWe) 1133
5. Design Electrical Rating (Net MWe) 1090
6. Maximum Dependable Capacity (GROSS MWe) 1100
7. Maximum Dependable Capacity (Net MWe) 1060
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Year-to-Date Cumulative

11. Hours in Reporting Period 720.0 4344.0 188424.0
12. No. of Hrs. Reactor Was Critical 0.0 0.0 121771.0
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator on Line 0.0 0.0 118153.4
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Gen. (MWH) 0.0 0.0 366007650.4
17. Gross Electrical Energy Gen. (MWH) 0.0 0.0 118584640.0
18. Net Electrical Energy Gen. (MWH) 0.0 0.0 114257779 0
19. Unit Service Factor 0.0 0.0 63.5
20. Unit Availability Factor 0.0 0.0 63.5
21. Unit Capacity Factor (MDC Net) 0.0 0.0 57.8'6.3
22. Unit Capacity Factor (DER Net) 0.0 0.0
23. Unit Forced Outage Rate 100.0 100.0 21.7
24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):

None

25. If Shut Down At End of Report Period, Estimated Date of Startup:

April 2000

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION

DOCKET NO. 50 - 316 UNIT NAME D.C. Cook Unit 2 DATE July 1, 1999 COMPLETED BY M. M. Pratt TELEPHONE 616-465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)

June 1999 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER LEVEL POWER LEVEL 6/1/99 6/17/99 6/2/99 6/18/99 6/3/99 6/19/99 6/4/99 6/20/99 6/5/99 6/21/99 6/6/99 6/22/99 6/7/99 6/23/99 6/8/99 6/24/99 6/9/99 6/25/99 6/10/99 6/26/99 6/11/99 6/27/99 6/12/99 6/28/99 6/13/99 6/29/99 6/14/99 6/30/99 6/15/99 6/16/99

DOCKET NO. 50- 316 UNIT NAME D.C. Cook Unit 2 DATE July 6, 1999 COMPLETED BY S. A. Richardson TELEPHONE 616-465-5901 PAGE 1 of1 MONTHLYOPERATING ACTIVITIES - June 1999 HIGHLIGHTS The unit entered this reporting period in Mode 5 at 0% RTP.

The unit exited this reporting period in Mode 5 at 0% RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross electrical generation for the month of June was 0 MWh.

DETAILS 06/01/99 The Reactor remains shutdown since 09/08/97 to resolve design basis questions identified during the NRC Architect and Engineering (AE) Inspection and subsequent Expanded System Readiness Reviews (ESRR).

All time entries are Eastern Standard Time (EST).

DOCKET NO. 50- 316 UNIT NAME D.C. Cook Unit 2 DATE July 6, 1999 COMPLETED BY S. A. Richardson TELEPHONE 616-465-5901 PAGE 1 of1 UNIT SHUTDOWNS AND POWER REDUCTIONS June 1999, METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE1 HOURS REASON2 REACTOR3 REPORT NO. CODE4 CODE5 TO PREVENT RECURRENCE 335 010798 F 720.0 NIA NIA NIA The unit remained shutdown to resolve design basis questions discovered during the NRC Architect and Engineering (AE)

Inspection.

1 TYPE: 2 REASON: 3 METHOD: 4 SYSTEM: 5 COMPONENT:

F: Forced A: Equipment Failure (Explain) 1: Manual Exhibit G - Instructions Exhibit I: Same Source S: Scheduled B: Maintenance or Test 2: Manual Scram for preparation of data C: Refueling 3: Automatic Scram entry sheets for Licensee D: Regulatory Restriction 4: Other (Explain) Ev'ent Report (LER) File E: Operator Training and (NUREG 0161)

License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)

0 ~ ~

~ ~