Monthly Operating Rept for Mar 1999 for DC Cook Nuclear Plant Unit 2.With 990408 Ltr
ML17325B549
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 03/31/1999
From: Center J, Cooper D, Minor J
AMERICAN ELECTRIC POWER CO., INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9904210320
Download: ML17325B549 (6)


Text

CATEGORY 1 REGULA Y INFORMATION DISTRIBUTI .,SYSTEM (RIDS) 4 ACCESSION NBR:9904210320 DOC.DATE: 99/03/31 NOTARIZED: NO DOCKET ¹ FACIL:50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana M 05000316 AUTH.NAME,~ AUTHOR AFFILIATION MINOR,J.W. American Electric Power Co., Inc.

CENTER,J.F. American Electric Power Co., Inc.

COOPER,D.E. American Electric Power Co., Inc.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Mar 1999 for DC Cook Nuclear Plant Unit 2..With 990408 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SXZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL LPD3-1 PD 1 1 STANG,J 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 FILE CENTER 01 1 1 OC/DBA/PAD 1 1 GN3 1 1 EXTERNAL: LMITCO MARSHALL 1 1 NOAC 1 1 NRC PDR 1 1 D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9

~ ~

~ J~

American Electric CxkQdee P1ar>>

~r One Cook Race M1 49106 61 64655901 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 April 8, 1999 Gentlemen:

Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 2 Technical SpeciTication 6.9.1.8, the attached Monthly Operating Report for the Month of March 1999 is submitted.

Sine rely

.. Cooper Plant Manager ljc Attachment NRC Region III NRC Project Manager NRR NRC Resident Inspector INPO Records Center ANI Nuclear Engineering Department R.P. Powers A.C. Bakken III D.F. Kunsemiller M.W. Rencheck P.A. Barrett Regulatory Licensing Manager D.H. Maiin W.H. Schalk D.G. Turner G.John D.R. Hahn Department of Health S. Hamming Department of Labor B. Lewis McGraw-Hill Companies G.T. Gaffney - Canton D.W. Paul - Lancaster 99042i0320 'ir9033i PDR ADOCK 050003i6 R PDR AEI': ~I rrrericn's Erretg)'nrlrrer-

N.R.C. OPERATING DATA REPOR DOCKET NO. 50-316 DATE April 7, 1999 COMPLETED BY JW Minor TELEPHONE 616-465-5901 OPERATING STATUS Notes:

1. Unit Name D. C. Cook Unit 2
2. Reporting Period Mar-99
3. Licensed Thermal Power (MWt) 3411
4. Name Plate Rating (Gross MWe) 1133
5. Design Electrical Rating (Net MWe) 1090
6. Maximum Dependable Capacity (GROSS MWe) 1100
7. Maximum Dependable Capacity (Net MWe) 1060
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Year-to-Date Cumulative

11. Hours in Reporting Period 744.0 2160.0 186240.0
12. No. of Hrs. Reactor Was Critical 0.0 0.0 121771.0
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator on Line 0.0 0.0 118153.4
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Gen. (MWH) 0.0 0.0 366007650.4
17. Gross Electrical Energy Gen. (MWH) 0.0 0.0 118584640.0
18. Net Electrical Energy Gen. (MWH) 0.0 0.0 114257779.0
19. Unit Service Factor 0.0 0.0 64.2
20. Unit Availability Factor 0.0 0.0 64.2
21. Unit Capacity Factor (MDC Net) 0.0 0.0 58.5
22. Unit Capacity Factor (DER Net) 0.0 0.0 57.0
23. Unit Forced Outage Rate 100.0 100.0 20.6
24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):

None

25. If Shut Down At End of Report Period, Estimated Date of Startup:

To be Determined.

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

50- 316 D.C. Cook Unit 2 April 7, 1999 JW Minor 616-465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)

March 1999 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER LEVEL POWER LEVEL 3/1/99 0 3/17/99 0 3/2/99 0 3/18/99 0 3/3/99 0 3/19/99 0 3/4/99 0 3/20/99 0 3/5/99 0 3/21/99 0 3/6/99 3/22/99 0

3/7/99 0 3/23/99 0 3/8/99 0 3/24/99 0 3/9/99 0 3/25/99 0 3/10/99 0 3/26/99 0 3/11/99 0 3/27/99 0 3/12/99 0 3/28/99 0 3/1 3/99 ~ 0 3/29/99 0 3/14/99 0 3/30/99 0 3/15/99 0 3/31/99 0 3/1 6/99 0

DOCKET NO. 50 - 316 UNIT NAME D.C. Cook Unit 2 DATE April 7, 1999 COMPLETED BY JF Center TELEPHONE 616-697-5098 PAGE 1 of1 MONTHLYOPERATING ACTIVITIES - March 1999 HIGHLIGHTS The unit entered this reporting period in Mode 5 at 0% RTP.

The unit exited this reporting period in Mode 5 at 0% RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross electrical generation for the month of March was 0 MWh.

DETAILS 03/01/99 Unit remained shutdown the entire reporting period to resolve design basis questions discovered during the NRC Architect and Engineering (AE)

Inspection.

All time entries are Eastern Standard Time (EST).

DOCKET NO. 50- 316 UNIT NAME D.C. Cook Unit 2 DATE April 7, 1999 COMPLETED BY JF Center TELEPHONE 616-697-5098 PAGE 1 of1 UNIT SHUTDOWNS AND POWER REDUCTIONS March 1999 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE'OURS REASON REACTOR REPORT NO. CODE CODE TO PREVENT RECURRENCE 335 010798 F 744.0 N/A N/A N/A The unit remained shutdown to resolve design basis questions discovered during the NRC Architect and'Engineering (AE)

Inspection.

1 TYPE: 2 REASON: 3 METHOD: 4 SYSTEM: 5 COMPONENT:

F: Forced A: Equipment Failure (Explain) 1: Manual Exhibit G - Instructions Exhibit I: Same Source S: Scheduled B: Maintenance or Test 2: Manual Scram for preparation of data C: Refueling 3: Automatic Scram entry sheets for Licensee D: Regulatory Restriction 4: Other (Explain) Event Report (LER) File E: Operator Training and (NUREG 0161)

License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)