REGULAT INFORMATION DISTRIBUTION YSTEM (RIDS)
ACCESSION NBR:9904200231 DOC.DATE: 99/03/31 NOTARIZED: NO FACIL:50-315 Donald C.
Cook Nuclear Power, Plant, Unit 1, Indiana M
AUTOS,.QAtlE AUTHOR AFFILXATION MINOR,J.W.
American Electric Power Co., Inc.
CENTER,J.F.
American Electric Power Co., Inc.
COOPER,D.E.
American Electric Power Co., Inc.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly ope=ating rept for Mar 1999 for DC Cook Nuclear Plant, Unit 1.With 9'99408 ltr.
DZSTRZBUTZON CODE:
ZE24D COPTER RECEZVED:LTR I
ENCL l
SZZE..
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
DOCKET I'5000315 C
RECIPIENT XD CODE/NAME LPD3-1 PD INTERNAL: AEOD/SPD/RRAB OC/DBA/PAD EXTERNAL: LMITCO MARSHALL NRC PDR COPIES RECIPIENT LTTR ENCL "ID CODE/NAME 1
1 STANG, J 1
1
~FILE CENTER 0I 1
1 RGN3 1
1 NOAC 1
1 COPIES LTTR ENCL 1
1 1
1 1
1 1
1 D
E NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US'O REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECE IVED BY YOU OR YOUR ORGANIZATIONS CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 9
ENCL 9
+ 4
American Electric ~.
Cook NvdearPlarC One Cook Plaoe Bxkpan,MI49106 6164655901 Fi U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 April 8, 1999 Gentlemen:
Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.8, the attached Monthly Operating Report for the Month of March 1999 is submitted.
Sin rely oper Plant Manager
/jc Attachment NRC Region III NRC Project Manager NRR NRC Resident Inspector INPO Records Center ANI Nuclear Engineering Department R.P. Powers A.C. Bakken III D.F. Kunsemiller M.W. Rencheck P.A. Barrett Regulatory Licensing Manager D.H. Malin W.H. Schalk D.G. Turner G.John D.R. Hahn Department of Health S. Hamming Department of Labor B. Lewis McGraw-HillCompanies G.T. Gaffney - Canton D.W. Paul - Lancaster 990420023i 9 P033i 1-
'DR
~
ADQCK.. 050003i 5'I R
'DR+
.R.C. OPERATING DATAREPOR
~
~
~
DOCKET NO.
DATE COMPLETED BY TELEPHONE 50 - 315 April 7, 1999 JW Minor 616465-5901 D. C. Cook Unit1 Mar-99 3250 1152 1020 We) 1056 1000 OPERATING STATUS
- 1. Unit Name
- 2. Reporting Period
- 3. Licensed Thermal Power (MWt)
- 4. Name Plate Rating (Gross MWe)
- 5. Design Electrical Rating (Net MWe)
- 6. Maximum Dependable Capacity (GROSS M
- 7. Maximum Dependable Capacity (Net MWe)
Notes:
- 8. IfChanges Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
- 9. Power Level To Which Restricted, IfAny (Net Mwe):
- 10. Reasons For Restrictions, IfAny:
- 11. Hours in Reporting Period
- 12. No. of Hrs. Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator on Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Gen. (MWH)
- 17. Gross Electrical Energy Gen. (MWH)
- 18. Net Electrical Energy Gen. (MWH)
- 19. Unit Service Factor
- 20. Unit AvailabilityFactor
- 21. Unit Capacity Factor (MDC Net)
- 22. Unit Capacity Factor (DER Net)
- 23. Unit Forced Outage Rate This Month 744.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Year-to-Date
. 2160.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Cumulative 212544.0 151285.3 463.0 148821.1 321.0 440194814.0 143013940.0 137597640.0 70.6 70.6 64.5 62.8 13.4
- 24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):
None
- 25. IfShut Down At End of Report Period, Estimated Date of Startup:
To be Determined.
- 26. Units in Test Status (Prior to Commercial Operation):
INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION Forecast Achieved
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50- 315 D.C. Cook Unit1 April7, 1999 JW Minor 616-465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)
March 1999 DAY 3/1/99.
3/2/99 3/3/99 3/4/99 3/5/99 3/6/99 3/7/99 3/8/99 3/9/99 3/10/99
.-3/1 1/99 3/12/99 3/13/99 3/14/99 3/15/99 3/1 6/99 AVERAGE DAILY POWER LEVEL DAY 3/17/99 3/18/99 3/19/99 3/20/99 3/21/99 3/22/99 3/23/99 3/24/99 3/25/99 3/26/99 3/27/99 3/28/99 3/29/99 3/30/99 3/31/99 AVERAGE DAILY POWER LEVEL
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-315 D.C. Cook Unit1 April 7, 1999 JF Center 616-697-5098 1 of1 MONTHLYOPERATING ACTIVITIES-March 1999 HIGHLIGHTS The unit entered this reporting period in Mode 5 at 0% RTP.
The unit exited this reporting period in Mode 5 at 0% RTP.
There were no challenges to the pressurizer safety valves or power operated relief valves.
Gross electrical generation for the month of March was 0 MWh.
DETAILS 03/01/99 The Reactor was shutdown 09/08/97 to resolve design basis questions discovered during the NRC Architect and Engineering (AE) Inspection.
AIItimes are in Eastern Standard Time (EST).
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE
'a, ~
50-315 D.C. Cook Unit1 April 7, 1999 JF Center 616-697-5098 1 of1 UNIT SHUTDOWNS AND POWER REDUCTIONS - March 1999 DURATION NO.
DATE TYPE'OURS METHOD OF SHUTTING LICENSEE DOWN EVENT SYSTEM COMPONENT REASON REACTOR REPORT NO.
CODE CODE CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE 333 090897 F
744.0 97-010 97-011 97-012 97-013 97-014 97-016 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A The unit was shutdown to resolve design basis questions discovered during the NRC Architect and Engineering (AE) Inspection.
1 TYPE:
F: Forced S: Scheduled 2 REASON:
A: Equipment Failure (Explain) 8: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 3 METHOD:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:
Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:
Exhibit I: Same Source