REGULA RY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9903230306 DOC.DATE: 99/02/28 NOTARIZED: NO DOCKET ¹ FACIL:50-315 Donald C.
Cook Nuclear Power Plant, Unit 1, Indiana M
05000315 AUTH;.NAiiIE'.
AUTHOR AFFILIATION
'INOR,J.W.
American Electric Power Co., Inc.
CENTER,J.F.
American Electric Power Co., Inc.
COOPER,D.E.
American Electric Power Co., Inc.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating rept for Feb 1999 for DC Cook Nuclear Plant, Unit 1.With 990308 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR l ENCL l SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
E RECIPIENT ID CODE/NAME PD3-3 PD INTERNAL: AEOD/SPD/RRAB OC/DBA/PAD EXTERNAL: LMXTCO MARSHALL NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME STANG,J
. ~EN RGN3 NOAC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 9
ENCL 9
American Electric~r Cockwuctear Rant One Cook Race B(dgnan,M149106 6164655901 V
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 March 8, 1999 Gentlemen:
Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.8, the attached Monthly Operating Report for the Month of February 1999 is submitted.
Sine rely
.E. Cooper Plant Manager
/jc Attachment NRC Region III NRC Project Manager NRR NRC Resident Inspector INPO Records Center ANI Nuclear Engineering Department R.P. Powers A.C. Bakken III D.F. Kunsemiller M.W. Rencheck P.A. Barrett Regulatory Licensing Manager D.H. Malin W.H. Schalk D.G. Turner G.John D.R. Hahn Department of Health S. Hamming Department of Labor B. Lewis McGraw-Hill Companies G.T. Gaffney - Canton D.W. Paul - Lancaster 9903230306
'ar'110228 PDR r ADOCK 050003i5,,
R PDR iIElr~lr0er%'a's L'rrergrParlrrr',r-
N.R.C. OPERATING DATAREPOR DOCKET NO.
DATE COMPLETED BY TELEPHONE 50- 315 March 5, 1999 JW Minor 616-465-5901 D. C. Cook Unit1 Feb-99 3250 1152 1020 We) 1056 1000 OPERATING STATUS
- 1. Unit Name
- 2. Reporting Period
- 3. Licensed Thermal Power (MWt)
- 4. Name Plate Rating (Gross Mwe)
- 5. Design Electrical Rating (Net MWe)
- 6. Maximum Dependable Capacity (GROSS M
- 7. Maximum Dependable Capacity (Net MWe)
Notes:
- 8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
- 9. Power Level To Which Restricted, IfAny (Net Mwe):
- 10. Reasons For Restrictions, IfAny:
- 11. Hours in Reporting Period
- 12. No. of Hrs. Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator on Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Gen. (MWH)
- 17. Gross Electrical Energy Gen. (MWH)
- 18. Net Electrical Energy Gen. (MWH)
- 19. Unit Service Factor
- 20. Unit AvailabilityFactor
- 21. Unit Capacity Factor (MDC Net)
- 22. Unit Capacity Factor (DER Net)
- 23. Unit Forced Outage Rate This Month 672.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Year-to-Date 1416.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Cumulative 211800.0 151285.3 463.0 148821.1 321.0 440194814.0 143013940.0 137597640.0 70.9 70.9 64.7 63.1 13.0
- 24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):
None
- 25. IfShut Down At End of Report Period, Estimated Date of Startup:
To be Determined.
- 26. Units in Test Status (Prior to Commercial Operation):
INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION Forecast Achieved
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50 - 315 D.C. Cook Unit 1 March 5, 1999 JW Minor 616-465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)
February 1999 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 2/1/99 2/2/99 2/3/99 2/4/99 2/5/99 2/6/99 2/7/99 2/8/99 2/9/99 2/10/99 2/1 1/99 2/12/99 2/1 3/99 2/14/99 2/1 5/99 2/1 6/99 2/17/99 2/18/99 2/19/99 2/20/99 2/21/99 2/22/99 2/23/99 2/24/99 2/25/99 2/26/99 2/27/99 2/28/99
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50 - 315 D;C. Cook Unit 1 March 5, 1999 JF Center 616-697-5098 1 of1 MONTHLYOPERATING ACTIVITIES-February 1999 HIGHLIGHTS The unit entered this reporting period in Mode 5 at 0% RTP.
The unit exited this reporting period in Mode 5 at 0% RTP.
There were no challenges to the pressurizer safety valves or power operated relief valves.
Gross electrical generation for the month of February was 0 MWh.
DETAILS 02/01/99 The Reactor was shutdown 09/08/97 to resolve design basis questions discovered during the NRC Architect and Engineering (AE) Inspection.
Alltimes are in Eastern Standard Time (EST).
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50- 315 D.C. Cook Unit 1 March 5', 1999 JF Center 616-697-5098 1of1 e
DURATION NO.
DATE TYPE'OURS UNITSHUTDOWNS AND POWER REDUCTIONS - February 1999 METHOD OF SHUTTING LICENSEE DOWN EVENT SYSTEM COMPONENT REASON REACTOR REPORT NO.
CODE CODE CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE 333 090897 F
672.0 97-010 97-011 97-012 97-013 97-014 97-016 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A The unit was shutdown to resolve design basis questions discovered during the NRC Architect and Engineering (AE) Inspection.
1 TYPE:
F: Forced S: Scheduled 2 REASON:
A: Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 3 METHOD:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:
Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:
Exhibit I: Same Source