05000263/LER-1980-018, Forwards LER 80-018/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 80-018/03L-0
ML19323C402
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 05/09/1980
From: Mayer L
NORTHERN STATES POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML112900723 List:
References
NUDOCS 8005150477
Download: ML19323C402 (1)


LER-1980-018, Forwards LER 80-018/03L-0
Event date:
Report date:
2631980018R00 - NRC Website

text

8 00515 0 W7 MSP NORTHERN STATES POWER COMPANY MIN N E A PO LI S MIN N E S OTA 55401 May 9, 1980 Mr J G Keppler Office of Inspection 6 Enforcement U S Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137

Dear 1-;r Keppler:

MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Moisture Separator Level Switch Fitting Crack The Licensee Event Report for this occurrence is reproduced on the back of this letter.

Enclosed are three copies.

This event is reported in accordance with Technical Specification 6.7.B.2.d in that the event involved abnormal degradation of a system designed to contain radioactive material resulting from the fission process.

Yours very truly, y

nager of Nuclear Support Services LOM/ JAG /jh ec:

Director, IE, USNRC (30)

Director, MIPC, USNRC (3)

MPCA Attn:

J W Ferman i

- over-l l