Forwards Suppl 1 to LAR for License DPR-22, Replacing Exhibits B & C of Original Submittal to Reflect Item 2 & Subsequent Changes.Request for APRM Flow Converter Calibr Interval Extension,Withdrawn
ML20154L867
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 10/09/1998
From: Hammer M
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20154L871 List:
References
NUDOCS 9810200101
Download: ML20154L867 (2)


Text

,- , . --.

Northern States Power Company 4

  • Monticello Nuclear Generating Plant 2807 West County Road 75 Monticello, MN 55362 October 9,1998 US Nuclear Regulatory Commission 10 CFR Part 50 Attn: Document Control Desk Section 50.90 Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 . License No. DPR-22 Supplement 1 to License Amendment Request Dated July 5,1995 Surveillance Test Interval / Allowed Outage Time Extension Program - Part 2 This document constitutes Supplement 1 to the Northern States Power Company (NSP)

July 5,1995 request for an amendment to the Technical Specifications (TS), Appendix A of the Operating License for the Monticello Nuclear Generating Plant. This request is submitted in accordance with the provisions of 10 CFR Part 50, Section 50.90.

This letter serves three purposes which are to: 1) Confirm replacement of pressure switch PS 2-3-52A, 2) Withdraw our requast for APRM flow converter calibration interval extension, ano 3) Replace Exhibits B and C of the original submittal to reflect item 2) and subsequent changes.

1) Our original submittal committed to the replacemant of pressure switch PS 2 ,, 4 52A for the ~ Low Reactor Pressure ECCS Valve Permissive." With this letter, NSP confirms that the replacement has been completed.

b

2) As part of the Monticello Rerate project, General Electric (GE) completed a calculation of the APRM flow biased setpoint including the Recirculation flow instrumentation loop. The current TS required calibration interval of 3 months hv/

was used to deterrnine drift values in this setpoint calculation. Since the new GE calculation is now the calculation of record, NSP's July 5,1995 request to extend the calibration interval for the Recirculation flow meters & flow instrumentation loop is being withdrawn.

9810200101 981009 "

PDR ADOCK 05000263 P PDR ,

10/9S8 SIS hWalleye\TEAAtuCENSE\ Tech Speca\LARa\S T.l_A.O.T\STI Aoi Supplement 1. doc

t I

l USNRC Northern States Power Company l October 9,1998 -

L Page 2

3) With this supplement, NSP is submitting replacement Exhibits B and C which contain Technical Specification pages incorporating the proposed changes.

They supersede the respective Exhibits B and C of our original July 5,1995 request. The replacement Exhibits B and C eliminate references to the flow converter calibration interval discussed in the previous paragraph and make editorial changes discussed in Exhibit A.

As the changes described in this supplement are either editorial in nature or withdraw a previous request, this supplement is within the scope of the originallicense amendment i

request and the Safety Evaluation, Determination of No Significant Hazards Consideration, and Environmental Assessment are unchanged and remain applicable.

l This submittal does not contain any new NRC commitments and does not modify any prior commitments. Please contact Mr. Sam Shirey, Sr. Licensing Engineer, at (612)

F 295-1449 if you require additional information related to this request.

Michael F Hammer Plant Manager Monticello Nuclear Generating Plant c: Regional Administrator-Ill, NRC

NRR Project Manager, NRC

! Sr. Resident inspector, NRC State of Minnesota Attn: Kris Sanda

! J Silberg, Esq.

l Attachments: Affidavit to the US Nuclear Regulatory Commission Exhibit A- Evaluation of Proposed Changes l'

Exhibit B - Technical Specification Pages Marked Up With Proposed Changes Exhibit C - Revised Technical Specification Pages s