'-y Northern States Power Company 2807 W. Highway 75 Monticello, MN 55362
=
Telephone (612) 295-1317
^
September 9,1998 Technical Specification 6.7.A.7 U S Nuclear Regulatory Commission i
Attn: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Submittal of the Core Operating Limits Report for Cycle 19, Revision 1 The Monticello Nuclear Generating Plant Core Operating Limits Report (COLR) for Cycle 19 has been revised. Revision 1 of the COLR incorporates changes made to the power-flow maps in Figures 6 and 7. The changes were made to correct errors ire the stability exclusion region and the stability buffer region shown on Revision 0.
NSP also expects to issue another revision to the COLR later this cycle after the NRC grants
[
approval for plant rerate.
F-Please contact Sam Shirey at 612-295-1449 if you have any questions. related to this submittal.
kN gi Michael F. Hammer Plant Manager Monticello Nuclear Generating Plant c:
Regional Administrator-Ill, NRC NRR Project Mgr., NRC NRC Resident Inspector State of Minnesota Attn: Kris Sanda l
J Silberg
Enclosure:
Core Operating Limits Report for Cycle 19 (Revision 1)
=
9809280290 980909 PDR ADOCK 05000263 P
PM,
9/B/98 Sl3 K%ICENSE\\N.R.C Mac Corresp\\COLR C19 R1. doc
MONTICELLO NUCLEAR GENERATING PLANT Core Operating Limit Report Record of Revision i
Revision Approval Cycle Number Datq Remarks 14 0
9/28/89 Core Operating Limit Report distributed with Technical Specification Revision 120 15 0
5/23/91 16 0
3/25/93 16 1
5/17/94 16 2
6/27/94 17 0
9/22/94-18 0
5/14/96 18 1
5/18/96 18 2
7/12/96 18 3
11/12/96 19 0
4/13/98 19 1
9/8/98 Ifjmm