ML20246L502
| ML20246L502 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 08/31/1989 |
| From: | Parker T NORTHERN STATES POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GL-89-12, NUDOCS 8909060342 | |
| Download: ML20246L502 (3) | |
Text
_. _
e ~
Northem States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401-1927 Telephone (612) 330 5500 Generic Letter 89-12 August 31, 1989 Director of Nuclear Reactor Regulation US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Response to Generic Letter 89-12 Operator Licensing Examinations l
Attached is our response to Generic Letter 89-12, " Operator Licensing Examinations" for the Monticello Nuclear Generating Plant.
Please contact us if you have any questions related to our response.
M Thomas M Parker Manager Nuclear Support Services cc: Regional Administrator, NRC 1
NRR Project Manager, NRC Resident Inspector, NRC G Charnoff l
l
Attachment:
Response to Generic Letter 89-12 l
/hCc3 i
i t
8909060342 890831 PDR ADOCK 05000263 V
FDC
w g
[
=
.s
[,.
c
. PROPOSED OPERATOR LICENSING EXAMINATION SCHEDULE' FORMAT Facility-Monticello NRC Region. TTT
~
FY 1990'.
.FY 1991 FY 1992;
. FY 1993' (10/1/89-9/30/90) (10/1/90-9/30/91) 1 10/1/91-9/30/92) (10/1/92-9/30/93):
E 1.
Assigned.
Date
-(GL89-03)'
March March March
-March
'#RO
_o o
o o
.#SRO Instant o
o o
o fSRO Upgrade' o'
o o
o iSRO Limited o.
o-o o
2.
Assigned
.Date (GL89-03) sept sept sept sept FRO 2
4 3
3
~iSRO Instant 4
4 4
4
- SRO Upgrade 5
2 3
3
- 5R0 Limited o
o o
o
.Please indicate initial cold license examinations by placing an asterisk (*) by the' date.
Please' indicate examinations intended to extend an operator's license
- to a second or subsequent unit with two asterisks (**).
Ror example, if Unit leis in operation and Unit 2 is approaching fuel load, and three R0 candidates
.uith no previous license are to be examined on both Units 1 and 2, and five RO candidates licensed on Unit I are'to be examined to extend their licenses toUnit2,thenindicate"R03,5**.")
Enciosure 2 PROPOSED REQUALIFICATION EXAMINATION SCHEDULE FORMAT Facility Monticello NRC Region III Planned Sinulation Facility Cert 1ficatica/ Approval Date December 1990 FY 1990 FY 1991 FY 1992 FY 1993 (10/1/89-9/30/90)
(10/1/90-9/30/91)(10/1/91-9/30/92)(10/1/92-9/30/93) 1.
Date March Date March Date March Date March 2.
Date Date Date Date 3.
Date Date Date Date 1
4 Date Date Date Date 5.
Date Date Date_
Date
.-_-_ _____-_-_--__- _ - _- _ _ _ - -