Responds to Generic Ltr 89-12, Operator Licensing Exams
ML20246L502
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 08/31/1989
From: Parker T
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-89-12, NUDOCS 8909060342
Download: ML20246L502 (3)


Text

_. _

e~

Northem States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401-1927 Telephone (612) 330 5500 Generic Letter 89-12 August 31, 1989 Director of Nuclear Reactor Regulation US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Response to Generic Letter 89-12 l

Operator Licensing Examinations Attached is our response to Generic Letter 89-12, " Operator Licensing Examinations" for the Monticello Nuclear Generating Plant.

Please contact us if you have any questions related to our response.

M Thomas M Parker Manager Nuclear Support Services cc: Regional Administrator, NRC 1 NRR Project Manager, NRC Resident Inspector, NRC G Charnoff l

l

Attachment:

Response to Generic Letter 89-12 l

/hCc3 i

i t 8909060342 890831 PDR ADOCK 05000263 V FDC

g w

[

=

.s

[, Enclosure 1.

c ,

. PROPOSED OPERATOR LICENSING EXAMINATION SCHEDULE' FORMAT Facility- Monticello NRC Region. TTT

~

FY 1990'. .FY 1991 FY 1992; . FY 1993' (10/1/89-9/30/90) (10/1/90-9/30/91) 1 10/1/91-9/30/92) (10/1/92-9/30/93):

E 1. Assigned.

Date .

-(GL89-03)' March March March -March

'#RO _o o o o

.#SRO Instant o o o o fSRO Upgrade' o' o o o iSRO Limited o. o- o o

2. Assigned

.Date (GL89-03) sept sept sept sept FRO 2 4 3 3

~iSRO Instant 4 4 4 4

  1. SRO Upgrade 5 2 3 3
  1. 5R0 Limited o o o o

.Please indicate initial cold license examinations by placing an asterisk (*) by the' date. Please' indicate examinations intended to extend an operator's license

- to a second or subsequent unit with two asterisks (**). Ror example, if Unit leis in operation and Unit 2 is approaching fuel load, and three R0 candidates

.uith no previous license are to be examined on both Units 1 and 2, and five RO candidates licensed on Unit I are'to be examined to extend their licenses toUnit2,thenindicate"R03,5**.")

Enciosure 2 ,, .

PROPOSED REQUALIFICATION EXAMINATION SCHEDULE FORMAT Facility Monticello NRC Region III Planned Sinulation Facility Cert 1ficatica/ Approval Date December 1990 FY 1990 FY 1991 FY 1992 FY 1993 (10/1/89-9/30/90) (10/1/90-9/30/91)(10/1/91-9/30/92)(10/1/92-9/30/93)

1. Date March Date March Date March Date March
2. Date Date Date Date

, 3. Date Date Date Date 1

4 Date Date Date Date

5. Date Date Date_ Date

.-_-_ _____-_-_--__- _ - _- _ _ _ - -