05000263/LER-1998-005, Forwards LER 98-005-00,re HPCI Being Removed from Service to Repair Steam Leak in Drain Trap Bypass.Commitments Made by Util Are Listed

From kanterella
Jump to navigation Jump to search
Forwards LER 98-005-00,re HPCI Being Removed from Service to Repair Steam Leak in Drain Trap Bypass.Commitments Made by Util Are Listed
ML20155E457
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 10/21/1998
From: Hammer M
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20155E461 List:
References
NUDOCS 9811050053
Download: ML20155E457 (1)


LER-2098-005, Forwards LER 98-005-00,re HPCI Being Removed from Service to Repair Steam Leak in Drain Trap Bypass.Commitments Made by Util Are Listed
Event date:
Report date:
2632098005R00 - NRC Website

text

. .. .-

Northern states Power Company Monticello Nuclear Generating Plant 2807 West Hwy 75 Monticello, Minnesota 55302 9637 October 21,1998 10 CFR Part 50 Section 50.73 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 LER 98-005 HPCl Removed from Service to Repair Steam Leak in Drain Trap Bypass The Licensee Event Report for this occurrence is attached. This report contains two new NRC commitments:

it is planned to install a new automatic valve in the steam trap bypass line.

Action will be taken to minimize the potential for leakage from this and other similar carbon steel valves in the HPCI and RCIC steam line drains.

Please contact Tom Parker at (612) 295-1014 if you require further information.

% 1 l l Michael F Hammer '/

Plant Manager Monticello Nuclear Generating Plant i c: Regional Administrator-lil NRC l

l Sr Resident inspector, NRC NRR Project Manager, NRC s] b p i State of Minnesota, Attn: Kris Sanda Attachment

~

9811050053 981021 PDR ADOCK 05000263 _

S PDR J i