?,q, -
-D Il s
g
.J7.+-
ggg 414 Nicollet Mall 1
Minneapolis, Minnesota 554011927 Telephone (612) 3345500 i
T l
' March 21,-1990 Generic Letter 90 'i 1
{
Director of Nuclear Reactor Regulation U S-Nuclear Regulatory Commission Attn: Document Control Desk Washington,-DC 20555 1.
MONTICELLO NUCLEAR GENERATING PIANT Docket No. 50 263 License No. DPR-22 PRAIRIE ISLAND-NUCLEAR GENERATING PLANT Docket Nos. 50 282 License Nos. DPR-42 50 306 DPR-60 Response to Generic Letter 90-01 l
Request for Voluntary Participation in NRC Regulatory Impnet Survey-The attached information is submitted in response to Generic Letter 90 01,
- Request for Voluntary Participation in NRC Regulatory Impact Survey.. The -
information provided is identical for Prairie Island and Monticello.
The total impact on Northern States Power could be obtained by doubling the-numbers on the attached sheets.
The following assumptions.were made to fill out the questionnaire:
1)
Item 5:
The total time is provided in total hours per year for all the people involved.
Example:
120 hr (Number involved) 2 means 2 people would spend a total of 120 hours0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br /> per year. The average hours per year per person would be 60 hours6.944444e-4 days <br />0.0167 hours <br />9.920635e-5 weeks <br />2.283e-5 months <br />.
2).
Item 5:
Plant Department Heads were assumed to be individuals reporting directly to the Plant Manager.
I x
l um ne
,P-Od
--)
4 j&....
_ ~
Director of Nuclear Reactor Regulation March-21, 1990
'Page'2
.Please, contact us it you wish further information on this issue.
4 I
Thomas M Parker Manager Nuclear: Support-Services c:
' Regional Administrator Region-III, NRC Sr NRC Resident Inspector, Monticello
- NRC Project Manager, Monticello 1Sr NRC Resident Inspector, Prairie Island
- NRC Project Manager, Prairie Island C Charnoff i
Attachment:
NRC Regulatory Impact Survey Questionnaire Sheets (8) 1 i
^.
1,
- ). '
b d
1' NRC Regulatory Impact Survey Sheet 1 of 8 Questionnaire sheet 2 1.
Type of inspection, audit or evaluation:
NRC Team Inspection Based on actual experience over the' past several' years, about how often
~ 2. - - is this activity conducted?
One per year
- 3. --
Operations / Construction areas covered 7
SSF1. Environment Qualification 4..
Extent of.the activity (how many people, for how long) 5 - 10 inspectors fer 1 to 2 weeks-
'5.-
Approximate percentage of total time (on an annual basis) which-the following managers must spend in direct' involvement before, during, and in response to-the activity described in Item 11.
2 120 hr (numberinvolved)
.a.
Plant Department Heads b.
Plant Manager 30 hr 1
16 hr (numberinvolved)'
c.
Corporate Department Heads d.
' Corp' orate Vice Presidents (numberinvolved) e.
Chief Nuclear Officer 8 hr
7 J
NRC' Regulatory Impact Survey Sheet 2 of 8-i Questionnaire Sheet i
i f
- 1.-
Type of. inspection, audit.or evaluation:
r
. Other NRC Restdent, Regional and lleadquarters inspectfons/ audits -
lo 2.-
B'ased on actual experience over the past several years, about how often is this activity; conducted?
25 per year
)
3.
Operations / Construction areas coveredt E
All areas of plant operation-t 4.
Extent of the activity (how many people, for how long) 2 - 3 Ir.spectors for a week t
-5.
Approximate percentage of total time (on an annual basis) which the
.following managers must spend in direct involvement before..during, and in response to the activity described in Item fl.
~
4 a..
Plant Department Heads 200 (numberinvolved)
~
b.
Plant Manager.- 50 150 (number. involved) ' 3 I
c.
. Corporate Department Heads 1:
d.
Corp' orate Vice Presidents (numberinvolved)
I e.
Chief Nuclear Of ficer 50 L
L I
NRC' Regulatory Impact Survey sheet 3 of 8 Questionnaire sheet--
- 1.- -
Type of inspection, audit or evaluation:
INPO Plant Evaluation 2.
Based on actual experience over the past several years, about how often j:
is this activity conducted?
~
Ebery other year' 3.
-Operations / Construction areas covered:
7~
All safety related areas of plant operation 4.
Extent of the activity (how many people, for how long) o 10 - 20 reople for 2 weeke 5.
' Approximate percentage of total time (on an annual basis) which the following managers must spend in directtinvolvement before, during, and -
in response to the activity described in Item fl.
6 a.
Plant Department Heads 480 (numberinvolved) b.
Plant Manager 120-2 80 (numberinvolved) c.
Corporate Department Heads d.
Corp' orate Vice Presidents (numberinvolved) e.
Chief Nuclear Officer 20
____.____a
l-u
~
^,_
NRC Regulatory Impact Survey Sheet'4 of 8
- ~
n Questionnaire Sheet
- 1.. - Type of inspection, audit or evaluation:
Insurers (ANI)
D 2.
Based on actual experience over the past several years, about how often is.this activity conducted?
l 5 visits per year (except for Resident. ANI Inspector) 3.
-Operations / Construction areas coveredt 7
i All areas of plant operation 4;
Extent of the activity-(how many people, for how long) 2 people for 2 days (except for Resident ANI Inspector)
- 100 days per year Resident ANI Inspector f.
- 5.
Approximate' percentage of-total time (on an annual' basis) which the following managers must spend in direct involvement before, during, and i
in response to the activity described in Item 11, y>
2 16 (numberinvolved) a.
Plant Department Heads l -.I o
[
8 L
b.
Plant Manager 1
40 (numberinvolved) c.
Corporate Department Heads d.
Corp' orate Vice Presidents (numberinvolved) e.
Chief Nuclear Officer 4 hr L
1 !
a 1
m.
. m
m NRC Regulctory' Impact Survey-Sheet 5'of 8 Questionn_ aire sheet L1.:. Type of inspection, audit or evaluation:
o a
NRC Required QA Audits 2.
Based on actua1' experience over the past several years, about how often is this activity conducted?
50 per year 3.
Operations / Construction areas covered:
Y All areas of plant operation required by the Technical Specifications 4.
Extent of the activity; (how many. people, for how long) 1 to 2 people for a month 5.
Approximate: percentage of total time (on an annual basis) which the
.following managers must spend in direct involvement before, during, and in response'to the activity described in Item fl.
6 Plant Department Heads 300 (numberinvolved) a.
100 b.
' Plant Manager 3
150
_(numberinvolved) c.
Corporate Department Heads
~d.
Corp' orate Vice Presidents (numberinvolved) e.
. Chief Nuclear Officer 50
NRC Regulatory Impact Survey 0
~ ' '
Questionnaire Sheet i
- 1.-
Type of inspection, audit or evaluation:
[
EPA' State / Local Authorities 2.
Based on actual experience over the past several years, about how often is this activity conducted?
Two Annual Inspections (MPCA. EPA) 9
- 3.
Operations / Construction areas covered:,
Discharge locations, operating changes National Pollution Discharge-Elimination System, Quality Control associated with Chemistry Procedures f
5 4.
. Extent of the activity (how many people, for how long) 1 inspector per inspection L
L 5.
Approximate percentage of total time (on an annual basis) which the following managers must. spend in direct involvement before, during, and
-in response 7 to the activity described in Item #1..
a.
-Plant Department Heads 4
(number involved)
-l b.
Plant Manager 1
L c.
Corporate-Department Heads 2
(number involved) 1 L
g l:
d.
Corp' orate Vice Presidents 0
(number involved) 0 l
e.
Chief Nuclear-Officer 0
h l
i c
w
-NRC Regulatory Impact-Survey Sheet 7 of 8 Questionnaire sheet 1.
Type of inspection, audit or evaluation:
i j
- dot -
_2._-
Based on actual experience over the past several years, about how often is this activity conducted?
O
-3.
Operations / Construction areas covered:-
j
.e-0
-4.
Extent of the activity (how many people, for how long) 0
.5.
Approximate percentage of total time (on an annual. basis) which the-following managers must spend in direct involvement before,'during, and in response to the activity described in Item #1.
0 (numberinvolved) a.
Plant Department Heads b.
Plant Manager o
0 (number involved) c.
Corporate Department Heads 0
(numberinvolved) d.
Corp' orate Vice Presidents e.
Chief Nuclear Officer 0
1
n..'s.
NRC Regulatory Impact Survey She.n 8 d 8-p,-
Questionnaire Sheet 1
f El.
Type of inspection, audit or evaluation:
i 7
\\
[
[
2.
. Based on actual experience over the past several years, about how often is.this activity conducted?
o
'l 4
3..
Operations / Construction areas covered:-
0 t
4.
Extentof,theactivity(howmanypeople,forhowlong) 0 5.
Approximate percentage -of total time (on an annual basis) which the following managers must spend in direct involvement before, during, and.
'in response to.the activity described in Item #1.
a.
Plant Department Heads 0
(number involved) 0 b.-
Plant Manager 0-c.
' Corporate Department Heads 0
(numberinvolved) 0 d.
Corp' orate Vice Presidents 0
(numberinvolved) 0 e.
Chief Nuclear Off'cer 0 E
.